Reducing Bottling Lines Downtime at
LeVecke Corporation Ismael Reyes
SGB 110 -2016
Define-Project Charter
Define- SIPOC S I P O C
• Tank Room• Receiving Department• Shipping Department
• Liquid/Product• Dry Components• Pallets
• Finished Case Goods• Pallets
• Warehouse• Shipping Department
Request for Components Rotate
Request for QC Check
Bottle Accordingly
to PlanClean
• Repeat as necessary depending on production schedule
Measure
Palletize
r
MIS ALIGNED LA
BELS
BROKEN Bottles
Clean Table
BOTTLE CODER
DUMPER
Clean Sleeves
Wait for M
aterial
Low Fill
Air Compresso
r Down
Broken Bottles i
n Capper
Change Sleeves
Sleeve Stop
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0
2
4
6
8
10
12
14
2.60
1.68
0.880.78
0.420.32
0.00 0.00 0.00 0.00 0.00 0.00 0.00
11
7
13
4
12
01
0 0 0 0 0
MARCH OTHER LINE STOP 2016
HOUR FREQUENCY
HOUR
S
FREQ
UENC
Y
YTD Loss: $ 3,400Downtime: 11 Hours
Measure
Line D Line G
Measure-Stocking Palletizer Flowchart
Analyze-Cause and Effect Diagram
• Irregular Size Pallets• Protruding Nails
• Chains and Sprockets and Gears not Covered
• Old Equipment • No TPM
• No Pallet Inspection Process • No Specific Directions to
Vendor
• Forklift Operator Not Trained Properly
Analyze
0
10
20
30
40
50
60
70
80
72
60
44
2421
8 6
Palletizer Down Reasons
PHOTO EYE JAM PALLETS WOULD NOT EJECT LINE DOWN ROLLERSWRAPPER CASES FELL ACTUAL PALLET CAUSING ISSUE
Reason
Min
utes
Improve• Remind Pallet Supplier Regarding Our Grade A Pallet Requirement• Possible Chargebacks If Not Compliant
• Properly Trained Forklift Operator • He Has To Inspect Pallets Before Stocking • He Knows What Is Conforming and Nonconforming
Improve-Stocking Palletizer Flow Chart
Improve
Improve
1 2 3 4 5 6 7 8 9 10 11 120
10
20
30
40
50
60
Run Chart
MINUTES AVG
Min
utes
Control
Control March April