Low-disturbance sustainable urban construction
URBAN INFRA STRATEGYBIM and GIS for low-disturbance urban infrastructure projects
TNO, Gemeente Rotterdam, DEMO Consultants
Dr. Rizal Sebastian, Ir. Ton Siemerink, Ir. André van DelftDr. Michel Böhms, Ing. Pim van den Helm, Ing. Walter Lohman, Ing. Sander van
Gennip
Innovatie-Estafette, Amsterdam, 12 Nov 2013
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 2
Innovatie-Estafette, Amsterdam, 12 November 2013
Overview of EU research
project “PANTURA”Dr. Rizal Sebastian (TNO)
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 3
Innovatie-Estafette, Amsterdam, 12 November 2013
EU research project “PANTURA”
• 3 years duration
01 January 2011 – 31 December 2013
• Total project budget EUR 5 million
EU grant EUR 3.5 million
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 4
Innovatie-Estafette, Amsterdam, 12 November 2013
EU research project “PANTURA”
• Context Construction and
refurbishment of bridges in the cities
• Aim low-disturbance projects through pro-active construction management supported by BIM & GIS based tools
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 5
Innovatie-Estafette, Amsterdam, 12 November 2013
EU research project “PANTURA”
• 12 partners from NL, NO, SE, ES, PL
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 6
Innovatie-Estafette, Amsterdam, 12 November 2013EU research project “PANTURA”
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 7
Innovatie-Estafette, Amsterdam, 12 November 2013
Performance-based procurement
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 8
Innovatie-Estafette, Amsterdam, 12 November 2013
0
500
1000
1500
2000
2500
3000
3500
4000
GFRP bridge CFRP bridge Concrete bridge Steel bridge
En
erg
y C
on
sum
tio
n (
MJ)
Steel – Concrete – Glass Fibre Composite – Carbon Fibre Composite
0
20
40
60
80
100
120
140
160
180
200
GFRP bridge CFRP bridge Concrete bridge Steel bridge
Ca
rbo
n e
mis
sio
ns
(to
n)
Lifecycle assessment of bridges
composite
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 9
Innovatie-Estafette, Amsterdam, 12 November 2013
Pre-fabricated composite bridges
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 10
Innovatie-Estafette, Amsterdam, 12 November 2013
KPIs of low-disturbance projects
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 11
Innovatie-Estafette, Amsterdam, 12 November 2013
Decision level
Object/environment scale
Life-cycle stage
City ▬
Region ▬
Country ▬
Contingent ▬
Urban area ▬
▬ Political
Material ▬
Component ▬
System ▬
Building ▬
Neighbourhood ▬
▬ Operational
▬ Tactical
▬ Strategic
Decision level
Object/environment scale
Life-cycle stage
City ▬
Region ▬
Country ▬
Contingent ▬
Urban area ▬
▬ Political
Material ▬
Component ▬
System ▬
Building ▬
Neighbourhood ▬
▬ Operational
▬ Tactical
▬ Strategic
Multi-level decision-making
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 12
Innovatie-Estafette, Amsterdam, 12 November 2013
Inter-operability betweenBIM & GIS data, planning & decision tools
Integration of data & IT tools
Low-disturbance sustainable urban construction – EU FP7 ENV 2011-2013 13
Innovatie-Estafette, Amsterdam, 12 November 2013
The Pantura project is co-financed by the European Commision with contract No.: 265172.
© Copyright © 2011-2013. All rights reserved.All rights reserved. Any duplication or use of objects such as diagrams in other
electronic or printed publications is not permitted without the author's agreement.
www.pantura-project.eu
www.tno.nl
www.rotterdam.nl
www.demobv.nl