LOUGHLIN Alejandra _ Save the Children-US _ Guidelines for early recovery - Pakistan 2005
-
Upload
alejandra-loughlin -
Category
Documents
-
view
304 -
download
2
Transcript of LOUGHLIN Alejandra _ Save the Children-US _ Guidelines for early recovery - Pakistan 2005
GUIDELINES FOR IMPROVING THE QUALITY OF SHELTER CONSTRUCTION IN ALLAI
BY SAVE THE CHILDREN-USAArch. Alejandra Loughlin
14-January-2006
Notes: The photographs included in this document has being taken on the field (Banna, Allai) between 7 and 8 of January 2006
STRUCTURE
VERTICAL LOADS•Roof•Snow
OVERLAPPING
HORIZONTAL LOADS•Wind
•Earthquake
BRACINGJOINING WITH TENONS AND MORTICE
WOOD-TO-WOOD METALLIC CONNECTORS/WIRE
JOINING: RIDGE BEAM-RAFTER-KING POSTBAD
UPGOOD
SUPPLYBAD GOOD
BESIDE: BAD BESIDE: BAD
NO METALLIC CONNECTOR: BAD
JOINING: RIDGE BEAM-RAFTER-KING POSTGOOD BUT NOT ENOUGH:LACK OF METALLIC CONECTORS
GOOD
OPTION A
OPTION B
JOINING: TENON AND MORTICEBAD
CONNECTOR VERY WEAK OVERLAPPING TOO MANY SMALL PEACES
VERY WEAK
UNNECESSARYWIRE
TOO WEAK
BEAMS WITHOUT OVERLAPPINGOR TENON AND MORTICE
CEILINGS: PROVIDE INSULATIONGOOD
Ceiling: goodWood: bad
destroy forests
Ceiling: goodPlywood: very good
Cloth: goodDanger: can became wet
Lost of insulation
Straw: very good
BE CAREFULL WITH STOVES AND FIRE : ALL THESE MATERIALS ARE FLAMABLE
WALLSOUTSIDE
WATERPROOFAnd
Avoid wind came in •Plastic Bags•Tarpaulins•CGI•Wood covered with mud•Wooven walls with mud•Stone (with cement mortar or wire mesh)
WALLSBAD
STONE WALL< 90 cm height
CLOTH OUTSIDE
BECOME WET
LOST INSULATION
Wall too big withoutany column
Wall without beam over the stoneWall without cement mortar or wire mesh
STONE WALLSBAD
•VERY HIGH•WITHOUT MORTAR•WITHOUT WOODEN LINTEL•WITHOUT WIRE MESH•WITHOUT IRON BARS INSIDE•WITHOUT WOODEN BEAM ON TOP