Loren abraham selected work

35
Light work Loren Abraham 1993-2013

Transcript of Loren abraham selected work

Page 1: Loren abraham selected work

Light workLoren Abraham

1993-2013

Page 2: Loren abraham selected work

Loren AbrahamTimeline

Past Present Future

Page 3: Loren abraham selected work

loren abrahamarchitecture with WM+P

Page 4: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

HERMAN MILLER “GREENHOUSE” OFFICES & FACTORY William McDonough + Partners

Page 5: Loren abraham selected work

Business Week/Architectural Record Awards 1996-1997

Page 6: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

901 Cherry GAP Office Building

William McDonough + Partners

• Green Roof• Raised Floor – Displacement

Ventilation• Daylighting• Life Cycle Cost Analysis Model

Page 7: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of MinnesotaLoren Abraham, AIA, LEED AP

Adjunct Assistant Professor

Page 8: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

Life Cycle Cost Analysis

Loren Abraham, AIA, LEED APwith William McDonough + Partners

Summary of Cost Benefit Analysis

InitialCosts

$

Reduced

HVAC Costs

NetFirstCosts

AnnualEnergySaving

s

AnnualOperati

onSavings

Simple

Payback

Years

Green Roof 434,550

4,250 430,300

24,000 4,250 11

Underfloor Plenum

532,000

75,000 457,000

19,000 155,400 2.6

Daylighting 414,392

2,035 412,357

19,070 3,430 18

Combined 1,380,942

81,285 1,299,657

62,070 163,080 5.8

Page 9: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

Gap Probable Productivity Gains

Loren Abraham, AIA, LEED APwith William McDonough + Partners

Wor

st

Mos

t Like

ly

Best Productivity $

Absenteeism $

10000100000

100000010000000

100000000

Most Likely Productivity Gains Benefit to Owner Productivity

% ImprovedAbsenteeism% Improved

Cost Benefit $

Underfloor air distribution (UFAD)

4 9 1,581,000

Daylighting 4 9 1,581,000

Combined 8 18 3,162,000

Page 10: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of MinnesotaLoren Abraham, AIA, LEED AP

Adjunct Assistant Professor

A.J.L. CENTER FOR ENVIRONMENTAL STUDIES William McDonough + Partners

Net-Zero Energy building

Living Machine

Full Daylighting

Building as Teaching laboratory

Indoor and outdoor relationships

integrated green infrastructure

Page 11: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

loren abraham 2001-2013abraham + associates architects

Page 12: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of MinnesotaLoren Abraham, AIA, LEED AP

abraham + associates architects

abraham + associates architects public architectureHennepin County Brookdale Regional

CenterBrooklyn Center, MinnesotaIn association with Buetow & Associates, Inc., St. Paul,

Minnesota

Page 13: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of MinnesotaLoren Abraham, AIA, LEED AP

abraham + associates architects

Page 14: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of MinnesotaLoren Abraham, AIA, LEED AP

abraham + associates architects

Page 15: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesotaabraham + associates architects

Celebrating light

Page 16: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesotaabraham + associates architects

Daylighting Strategies Implemented

Figure A: Schematic Section showing the daylighting strategies employed.

Figure C: Small punched openings positioned high along mainstreet allow direct sunlight into non-critical task areas and the resulting light and shadow create movement and interest. The openings are beveled to optimize light and minimize uncomfortable contrasts between window and wall.

Figure D: The condition at the new and existing building interface presents an opportunity to create clerestrories at the high-low roof intersection. The clerestory on the left faces north and brings in soft diffuse light while the clerestory on the right faces west.

Figure E: Existing clerestories in the renovated portion of the regional center were retained and re-glazed with new higher performance glazing for improved daylighting performance. They allow daylight in the areas of the building core that would otherwise be windowless.

Figure B: Prismatic glass redirects intense rays of light coming from the West up onto the plaster scoop.

Page 17: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesotaabraham + associates architects

Daylighting Strategies Implemented

Figure 1: Shafts of daylight stream into West Rotunda Interior providing a feeling of well-being as well as valuable information.

Figure 2: High clerestories in the library at”Mainstreet” provide glare free abundant light to the room below without the problems of direct light. The vertical surfaces bounce and diffuse the light

Figure 3: Sloping the ceiling has the same effect as maintaining the higher level throughout the space with the added advantages of greater clearance above the ceiling for mechanical systems where it is needed and the ceiling is brighter than it would be if flat because it reflects incident horizontal light much better.

Figure 4: A highly efficient reflective film called SOLF (short for solar optic lens film) made by 3M, optimizes the effectiveness of these light shelves in the Library which bounce light up onto the sloped ceiling providing more even illumination in the space. They also reduce glare near the windows

Figure 5: By providing a graduated “frit” pattern on the glass above the light shelf instead of using the solar shade, we ensure that there will always be illumination for the light shelf and the frit reduces heat gains similar to the shade system but with far less cost.

Figure 6: The molded plaster light “Scoop” in the Courts waiting area effectively softens and distributes light not only to this space but the adjacent rooms as well.

Page 18: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of MinnesotaLoren Abraham, AIA, LEED AP

abraham + associates architects

abraham + associates architects green roof architecture

Page 19: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of MinnesotaLoren Abraham, AIA, LEED AP

abraham + associates architects

Minneapolis Central Library Green RoofArchitects: Pelli and Architectural Alliance Landscape Architect: Kestrel Design Group

Page 20: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

Green Roof Interpretive Center and Garden Classroom

Page 21: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

Final Design Scheme

GREEN ROOF PLAN

Page 22: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

Grand Opening 2010

Page 23: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture and planning

Design Team::Dewey Thorbeck, Design ArchitectESG Architects, Managing ArchitectAbraham + Associates Architects, Sustainable Design ArchitectKestrel Design Group, Landscape Architect

Page 24: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture and planning

MASTERPLAN

Page 25: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture and planning

Page 26: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture and planningLower Level

Touch and SeeGreenHouse

Researching Nature

SunkenCourt

Unexcavated

Main Entry Level

Upper Level

Roof Top Plan

Offices

Green Roof Terrace

Page 27: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architects

abraham + associates architects religious architectureRiver of Life Church Renovation and AdditionHastings, Minnesota

Page 28: Loren abraham selected work

Loren E Abraham,, RAabraham + associates

Interior buildout and furniture design build project

Brightech Conference Room and TableMinneapolis, MN

Page 29: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture and planning

Zero Impact Sustainable Strategies

Showcase Home

Barott HouseColumbus Township, Minnesota

Page 30: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architecture and planning

Zero Impact Sustainable Strategies

Showcase Home

Barott HouseColumbus Township, Minnesota

Page 31: Loren abraham selected work

Loren Abraham, AIA, LEED APabraham + associates architects

abraham + associates architects residential architecture

Page 32: Loren abraham selected work

loren abraham, aia with dgp architects, Charlottesville, VA

residential architectureTall Oaks, Charlottesville, VA

Page 33: Loren abraham selected work

Loren AbrahamInitiatives and Service

• Zero+ Campus Design Project 2010-2013

• Minnesota Renewable Energy Society Board 2007-2009

• Sustainable Buildings Industries Council Chair 1991-1993

• Initiated ASTM Green Buildings Committee (E51) 1992

• AIA National COTE scientific advisor ERG 1990-1992

• Greening of the White House Initiative 1992-1996

• Founding member US Green Building Council 1993

• LEED Guidelines Committee 1993-1995

Page 34: Loren abraham selected work

School of architecture | Adjunct Slam 2012College of Design | University of Minnesota

Loren AbrahamDesign Research and Product Development• Product Design - 9 Patents• Ecological Product

Development– C2C Protocols, MBDC, 1996– Designtex Fabric, MBDC, 1996

• Software and Publications– Energy 10 Software, 1996– DOE Energy Design Tools, 1996– Sustainable Building Technical

Manual, USGBC, PTI, 1996– Living Spaces: Ecological

Building and Design, 1999– Whole Building Design Guide

Page 35: Loren abraham selected work

Loren Abraham, AIA, LEED APAdjunct Assistant Professor

1991-1999 Other Work

C2C designtex fabric