LOGISTICAL MILL INSTALLATIONS LTD. - Joiner Sales · Bucked log sort gate, Log conveyors • Rework...
Transcript of LOGISTICAL MILL INSTALLATIONS LTD. - Joiner Sales · Bucked log sort gate, Log conveyors • Rework...
THE BOUNDARY GROUP
INDUSTRIAL INSTALLATIONS MECHANICAL - STRUCTURAL - CIVIL - ELECTRICAL - PROJECT MANAGEMENT
SERVICING - MINING - WOOD PROCESSING - MATERIAL HANDLING
PREVENTIVE MAINTENANCE
Box 245 – 3760 Hwy. 3
Rock Creek, British Columbia, V0H 1Y0
BMI LMI
Phone: 250-446-2985 Fax: 250-446-2986
CORPORATE PROFILE
The Boundary Group
The Boundary Group of Companies, established on Jan 3, 2003, began with a vision and goal to become a contender in the ever changing industrial world as a leading Industrial Installation Contractor.
As the Boundary Group’s experience and reputation for reliability grew, the need to expand and engage professionals for all aspects and phases for any Project became evident.
When first approached by a customer, steps are taken to ensure the New or Repeat Client will receive the best services that can be offered for his particular Project, what ever it may be.
Our experience has also enabled us to offer our Clients the option to contract out on a cost plus fixed fee, fixed price or cost plus basis.
With construction underway, one important practice has been maintained – every Major Project comes under the personal supervision of a Senior Supervisor dedicated solely to your Project
Boundary and the Client
BMI LMI
The Boundary Group
The Boundary Group of Companies is comprised of :
Logistical Mill Installations Ltd. (LMI) (our non-union division),
Boundary Mill Installations Ltd. (BMI) (our union operation)
The owner has many years of varied experience specializing in Sawmills, Pulp Mills, Plywood Plants, Mines and Recycling Facilities. We are able to service all aspects of various industries because of our experience, knowledge, personnel and unique company structure.
Logistical Mill Installations Ltd. owns all equipment which includes:
• Cranes and Forklifts
• Mobile welding trucks
• Service trucks and trailers for freighting of equipment
• Wire feed welders, inverter / rectifier welders, Mag drills, line cutters, plasma cutters
• A full complement of the tools and equipment required for virtually any project
On staff we have several qualified Supervisors that can oversee and manage all phases of a Construction Project. We also have a large pool of qualified Electricians, Plumbers, Welders, Millwrights, Pipe Fitters, Carpenters and Labourers. As well, we have formed strategic alliances with a variety of Companies to ensure our ability to complete Turnkey
Projects.
When working with the Boundary Group of Companies, not only do you get commitment from the very start, you also get quality to the very end.
We trust that the service capabilities we can provide will enable us to do business with you in the near future.
___________________ Gerry Dulyk
President /Owner
BMI ILM
The Boundary Group Project History - Partial list of Projects completed by the
Boundary Group of Companies
Thompson Creek Metals – Mt. Milligan Copper/Gold Mine:
LMI was awarded the Site Maintenance and Service Contract at the Milligan project for
Thompson Creek and after awarded L.M.I tasks greatly surpassed initial Contract.
L.M.I. on thas Site was responsible for many different tasks with little to no Supervision or
Micromanaging by the client, indicating the clients trust in L.M.I’s abilities while keeping
the budget in mind.
The entire Site had come to realize the need for L.M.I.’s Service and ability to juggle all
tasks which has been assigned. 175 Site Instructions had been issued such as :
Heating and Hording
Expansion of the Camp Gym
Temporary Maintenance Shop for Operations
Foundations and Enclosed Stair Case for Clients
Management team from Head Office to Process Plant
Lining of Sag Mill Ball Bin (Treated Lumber, Plywood and
1” Belting floor with ½” plate walls)
Ball Bunker for Ball Mills(Lock Block foundation, sloped
concrete floor with Cover All Buildings)
Lining and closing in of Ball Mill Ball Bin typical to Sag Mill
with structural and cladded walls
Pump House Building around Site for all ponds
Installation of Perimeter Lighting Pedestals and Poles
Protection Spill Walls for Primary Crusher
Various structures for Services, Company’s and Mine
Operations
BMI LMI
The Boundary Group Project History - Partial list of Projects continued…
Thompson Creek Metals – Mt. Milligan Copper/Gold Mine:
Because of our quality of tradesmen and consciousness to Safety L.M.I. was assigned to
take over the Lock Out Tag Out for the entire Site to assist the Commissioning Team
working directly with all the Contractors involved, supplying all required Journeymen,
Electricians and Millwrights.
The Original Tender awarded was for $697,594.32 to start August 2011 and to be
completed by May 31, 2013. Our portion concluded April 30, 2014 at $19,950,000.00,
with greatly increased crew and expansion of the contract. Our monthly invoicing
surpassed Original Tender Awarded.
BMI LMI
The Boundary Group Project History - Partial list of Projects continued…
Thompson Creek Metals – Mt. Milligan Copper/Gold Mine:
Various Site Instruction Projects.
BMI LMI
The Boundary Group Project History - Partial list of Projects continued…
Redfern Resources Ltd. – Tulsequah Chief Project:
LMI was tasked to provide all labour and required materials to
construct, operate and maintain camp facilities at Barge and
Shazah Sites including as follows:
• Installation and set up of camps
• Installation of roofs for camps – flat, trussed and coverall
• Install sewage treatment plant and tile field. Tie in sewage treatment plant to
existing system (supplier/vendor to assist with installation supervision)
• Installation of power and water
• Set up First Aid facilities
Camp Maintenance including as follows:
• Operate and service power, water and sewer systems
• General repairs to other camp equipment including plumbing (water, sewer &
propane), carpentry and electrical
• Snow removal around the camp facilities including roofing
• Receiving all incoming at Shazah airstrip and distribution to required sites
BMI LMI
The Boundary Group Project History - Partial list of Projects continued…
Merit Mining Corp.
Lexington Site – Shop for underground mine
Greenwood Gold Site – Processing Plant
Revelstoke J & L Site – Shop & Camp for underground mine
LMI was contracted to act as the General Contractor for Supply and Install on the Greenwood Gold
Project. LMI along with SCCL and Arbortec Design were able to construct this “As Built” processing
plant starting in late August 2007 with completion in mid March 2008, 6 weeks ahead of schedule.
All three sites were fixed price contracts and then cost plus for additional work required.
Major mill components were supplied by the client.
The total value of the projects to LMI was in excess of $3.25 M.
BMI LMI
Project History - Partial list of Projects continued…
The Boundary Group
Lexington Site - Shop for Underground Mine
Design and construct mobile shop, generator building, dry room & lunch room for
underground mine site. This was a fixed price contract completed on schedule and
on budget. Total value of projects at this site was $186,000
Revelstoke J & L Site – Shop & Camp for underground mine
Design and construct mobile shop, generator building, dry room/lunch room, camps,
kitchen and offices for Underground Mine. This was a fixed price contract completed
on schedule and on budget. Total value of projects at this site was $815,500
BMI LMI
Project History - Partial list of Projects continued…
The Boundary Group
• All concrete for entire site
• Purchase and erection of pre-engineered building
• Fabrication of all support & structural steel
• Installation of all equipment
• Electrical installation including MCC rooms
• All piping – High / low pressure, air and process water
• Supply and install of water tanks
Total value of projects at this site was $ 2.4 M
BMI LMI
Greenwood Gold – Processing Plant
The Boundary Group
NEMI – Northern Energy & Mining Inc.:
Phase 1 upgrades – Fines Circuit Building and Equipment Foundations - $468,000 project at the
Trend Mine Site South-East of Tumbler Ridge consisting of Excavation & Backfilling with:
• Compaction testing
• Form work
• Installation of all rebar for footings, pedestals, pilasters, slabs & walls
• Placing & finishing of concrete
• This was a hard number project with completion on schedule and on budget
Project History - Partial list of Projects continued…
BMI LMI
The Boundary Group Project History - Partial list of Projects continued…
Pope & Talbot (Grand Forks Division):
Merchandiser Upgrade consisting of the removal of all existing equipment, to be replaced with
new equipment as follows:
• Tree Deck, Linden 60’ double acting quad feeder, Ending roll case with lift gates,
Bucked log sort gate, Log conveyors
• Rework existing log infeed to mill conveyor
• Rework existing residual conveyor and install new conveyor
This project was completed in 2 phases with startup on schedule and on budget.
BMI LMI
The Boundary Group Project History - Partial list of Projects continued…
Federated Co-op ( Canoe B.C. ) / Seel Forest Products ( Edgewater B.C. )
Dismantle existing J bar sorter, stacker & grade station along with all structural support steel,
hydraulic system, un-scrambler, live fence, ending rolls, trim saws and waste conveyors.
All electrical for the above including the Re & Re of MCC’s and PLC’s
This equipment was dismantled, loaded on trucks and transported for reassembly on owner supplied
slab & foundations. Tie in to existing mill including on site fabrication of all new components was
completed on a long weekend with no down time to operations.
This was a hard number project with no extras involved.
BMI LMI
Project History - Partial list of Projects continued…
The Boundary Group
Slocan Group (Vavenby Division):
Hog to Hog fuel conversion system – was complete turnkey project consisting of
• Surveying, design, electrical, fabrication and installation
• Large drive–on slabs and concrete bunkers
• Reworking of main Mill hog conveyor (raise & reversing)
• Supply & install of all outside hog conveyors
• Truck / Loader ramp and lock block walls
This project was planned and completed with no down time to the Mill, on schedule and on budget.
BMI LMI
The Boundary Group Project History - Partial list of Projects continued…
Edmonton Composting Facility (subcontractor to Earth Tech Canada Inc.):
Repair of mixing drums and baffle removal
• This $1.5 million project was completed by working around the clock for more than 10
weeks.
• The $813,000 installation labour contract portion of the project was completed working
two 12 hour shifts for the duration of project with 22 welders and 2 supervisors.
• Because of the intensive planning, more than 36,000 man hours of work was completed
without a single incident. The Safe Work Plan, and more than 140 Tailboard meetings
enabled us to quickly resolve any issues or concerns before they became a problem.
Remove and replace the In feed - Ram Feeder ends on 5 Rotary Digester drums
(16’ diameter x 240’ length). Approximate installation contract value of $600,000.
BMI LMI
The Boundary Group
Additional Projects and Installations
Mining Sector
Huckleberry Mines Ltd
A Capital Cost project completed on a cost plus
basis
-On-site fabrication and installation of NAG
Floatation System including reclamation
pumps, large bore piping and pump house.
Elk Valley Coal ( Fording River Division )
A Capital Cost project awarded on bid basis
- Dryer Feed Conveyor Tower Repairs:
All excavations, forms, reinforcing steel,
concrete, systematic removal of all sections
of support structure and replacement with
new components.
Completed on budget and on schedule Pulp Mills
Zellstoff -Celgar Ltd.
A Capital Cost project awarded on bid basis
44” Debarker Infeed and Conveyor Upgrade:
Included in project
- Structural support steel
- Oversize log unloader and hydraulic system
- Re & Re of Infeed Roll Case with new
conveyors
- Removal of 1st floor existing concrete
- Installation of all new drives
- Chuting, catwalks and hand rails
Completed on budget and on schedule
On completion of project we were tasked with the
rebuild of the overhead Colby Crane
( log bundle lift ) on a cost plus basis.
BMI LMI
The Boundary Group
Pope & Talbot Canada
Castlegar, BC Division
• Chip Screen Replacement project: Including
modifying infeed, fines, overs and outfeed conveyors
• Waste Dropout and Belt Conveyors project:
Including removal of all existing and installation of
structural support steel with modifications to transfer
decks and fences.
Midway, BC Division
• Remove and Relocate North / South Hog Conveyor
• Optimizer Transfer Belt / End Deck project
• Metriguard 7200 CLT removal
Grand Forks, BC Division
• Ongoing preventive maintenance and
maintenance overload
• Vibrating Conveyor removal
( from US mill for installation at Grand Forks )
• Installation of oil totes at one central location with
pumps, piping & filling stations throughout entire mill
• Supply and install waste oil storage and pumping
facility
• Chip-n-Saw overhead crane and crane rail including
support structure
• Rebuild of Chip-n-Saw and Twinband
• All P & T projects are fixed price with no additional costs to the client
BMI LMI
The Boundary Group
Additional Projects and Installations
Federated Co-p ( Canoe B.C.) A Capital Cost project awarded on a fixed price basis
Log Deck Cut off Saw and Measures Conveyor
project -This project was planned and executed with
no down time to the client and included:
• Modifications to existing structural steel along with
installation of all new structural and support steel
for equipment, overhead crane and crane rails.
• Modifications to existing equipment and building
including removal of roof & walls, cutoff saw,
infeed & outfeed conveyors and all related
components were required for installation of the
new cutoff saw, butt reducer, new measures
conveyor, MCC building, hydraulic system,
catwalks and handrail.
Completed on budget and on schedule with extra work
completed on a cost plus basis
Weyerhaueser ( Kamloops Division ) Maintenance and services contract
• On Site Maintenance and Services Contractor
providing ongoing service with certified IP
welders and millwrights on day to day
preventive maintenance, maintenance
overload, and maintenance projects.
Sawmills and Planer Mills
BMI LMI
The Boundary Group
Additional Projects and Installations
Slocan Forest Products – Vavenby Division ( Canfor Forest Products )
• Fabrication and supply of Log Decks project ( Included removal of existing decks )
Project was completed with no down time to production
• Merchandiser upgrade: Project completed working two 12 hour shifts per day from
start to finish of project
• Sawmill Trimsaw Un-scrambler retrofit Project
• Planermill LP Fan Support Structure retrofit including all excavations, forming, concrete and new
steel. This Project was completed without the shutdown of any equipment.
• Merchandiser Hydraulic room Re & Re: This Supply and Install Project was under the
Merchandiser deck during operations and included overhead protection, demo of existing and
installation of a new block building with a concrete roof. Modifications to the hydraulic and fire
suppression systems were completed on weekends so no downtime to production was incurred.
Also included installation of overhead cranes.
• Chip Conveyor fabrication and installation: Including design and engineering, removal of
existing and modifications to building wall
BMI LMI
The Boundary Group
Labour Rates available upon request
BMI Overtime & Premium rates apply as per Union Contract
Travel Time and Mileage as per Union Contract
LOA applies as per Union Contract
LMI Overtime & Premium rates apply as per Federal & Provincial Labour Law
Travel Time and Mileage - to be determined on a Site to Site basis
LOA - to be determined on a Site to Site basis
Labour Rates include:
• Electric Welders - if required
• All Consumables/Expendables
-Oxy/acetylene, welding supplies, torch tips, grinding disks, gloves, etc.
• All small tools & equipment
- Welding cables & hoses, power cords, grinders, torches, drills, rigging,
chain falls, come-a-longs, etc.
Service Vehicle/Supervisor Vehicle/Town Runner - $75.00 Flat Rate per day.
Other Equipment:
• Portable Welders
• Generators
• Cranes
- 8.5 ton Broderson Carry Deck
- 20 ton P&H RT
- 22 ton Grove AT
- Hourly, Daily, Weekly, Monthly Rates on request
• Forklifts
- Hourly, Daily, Weekly, Monthly Rates on request
• Freight & Fuels for above equipment to be billed as an additional cost
* All applicable taxes are extra upon invoicing*
BMI LMI
The Boundary Group
Reference Contacts
Please feel free to call any of the references listed below to confirm that not only do you get commitment
from the very start, you get quality to the very end.
Bert Jeffries (Retired) Jay Cairns
Construction Manager, Mt. Milligan Copper/Gold Project Contracts Manager,Mt. Milligan Copper/Gold
Thompson Creek Metals Thompson Creek Metals
[email protected] [email protected]
(208)756-4448 (250)996-2528
M.W. (Mel) Smale T.R. (Tom) Smale
Chairman & Director President / CEO
SCCL Construction Management SCCL Construction Management
Cell: (604) 302-7551 Cell: (604) 380-8314
Bill Kazakoff Mike Crondahl
Site Engineer / Project Superintendant President
Pope & Talbot (Castlegar, Grand Forks, Midway) Westmill Industries
Grand Forks, B.C. Aldergrove, B.C.
(250) 443-2407 (604) 607-7010
Mike Kazakoff Gerhard Mikolajczyk P.Eng.
Design Technologist Design Technologist
Arbortec Design Services Ltd. International Quest Engineering Ltd.
Christina Lake, B.C. Prince George, B.C.
(250) 447-6272 (250) 612-0246
Additional Clients
Westmill Industries………………….Project Consultants for Veneer Dryer Rebuilds
Canpar Industries…………………...Preventative Maintenance
Creekside Industries ……………….Minor project assistance
Interac ……………………………….Sawmill / Planermill / Reman Conversion Project
Roxul ………………………………...Re & Re of Melter Pot
Louisiana Pacific …………………...Crane & Crane Rails
Anglo Swiss Resources Inc………..Design, Fabrication and Installation for Crushing and
Grinding Plant and Flotation Circuit
BMI LMI
THE BOUNDARY
GROUP OF COMPANIES
BMI
LMI
Boundary Mill Installations Ltd. (Our Union Company)
Logistical Mill Installations Ltd. (Our Non - Union Company)
BMI LMI
PO Box 245 – 3760 Highway 3, Rock Creek, BC V0H 1Y0
Phone: 250-446-2985
Fax: 250-446-2986
Gerry Dulyk President
Cell: 250-868-7615
Kathy Baiton Head Office Admin/Project Coordinator