Logging Job Stabilization & Close-Out (aka, “rehab”)
![Page 2: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/2.jpg)
What is Required?FPG .0201 – SMZs
• Provide groundcover as needed
FPG .0203 – Stream Crossings• Groundcover 10 working days after install
• Remove debris that may cause obstruction
FPG .0209 – Rehabilitation of Project Site• Groundcover 30 working days after ceasing any phase of
operation
Not just where sediment is currently moving…But also on areas that have the “potential”.
![Page 3: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/3.jpg)
Main Focus AreasStream/Ditch Crossing…
……Approachways to the Crossing
Deck/Landing
Skid Trail & Road with sedimentation potential
Access Entrance onto Public Road
Remember: if you use an existing road or crossing… you ‘bought it’. It becomes your responsibility to meet the FPG standards on it.
➢ And… pick up the garbage, tractor parts, hoses, tires, oil jugs, Mountain Dew bottles, Bojangles boxes…
![Page 4: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/4.jpg)
This is not “rehab”. Not sure what it is… but it ain’t rehab.
![Page 5: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/5.jpg)
This is more like it ☺
![Page 6: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/6.jpg)
This is more like it ☺
![Page 7: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/7.jpg)
Waterbars packed down, seed & straw. Nice.
![Page 8: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/8.jpg)
Pretty good job, would be nice if stream bank was covered.
![Page 9: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/9.jpg)
Is any rehab work needed on this crossing?
![Page 10: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/10.jpg)
Hi-tech BMPs… Erosion Control Matting (ECM), Rolled Erosion Control Product (RECP)Temporary Erosion Control BlanketCurlex
![Page 11: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/11.jpg)
Hi-tech BMPs…
LEFT: Coir Logs, Straw Wattles
RIGHT: Erosion Control Matting (ECM), Rolled Erosion Control Product (RECP)
![Page 12: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/12.jpg)
Rehab work can remediate soil & site productivity, in addition to protecting water quality.
![Page 13: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/13.jpg)
Skid trails with effective
rehab groundcover
![Page 14: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/14.jpg)
Skid Trail Stream Crossing. Logger has been gone for a few months. Job is Completed.What do we think of this?
![Page 15: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/15.jpg)
Looks Good!
Yup…
Y’all hurry up, it’s hot out here…
![Page 16: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/16.jpg)
Rehab isn’t just for logging jobs…
![Page 17: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/17.jpg)
Q – What kind of grass seed mix should you use?A – I don’t really care… try to avoid noxious weeds if you can. (refer to the BMP Manual)
![Page 18: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/18.jpg)
Another stream crossing stabilized, with slash & straw.
![Page 19: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/19.jpg)
Steep Slopes = More BMP Work.Slow It Down… & Spread It Out!
![Page 20: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/20.jpg)
Another well done stream crossing.(are you starting to see a common theme?...)
![Page 21: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/21.jpg)
The NCFS Inspection Process …Pt.1
➢ In Compliance (we often visit same site multiple times, in-progress)
➢ Temporary Compliance
➢Out of Compliance / Not in Compliance• May also be called “violation”.
If Out of Compliance:• We fill out the Form (called “4808-1” form)• Provide copies to logger, buyer, CF, landowner, etc.
• In Most Cases… provide a due-date to fix the problem.
• Re-Inspect the site, after due-date, to see if fixed.
![Page 22: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/22.jpg)
What Direction do we Give?
• NCFS may not give exact prescription of “do this & this”.
• Our instructions align with what the FPG standard says:
✓ “Provide sufficient groundcover within the SMZ to restrain visible sediment and prevent potential accelerated erosion from entering the stream”.
If FPG Non-Compliance is not Remediated:
• “Referral” (notification/hand-off) to DEQ or Dept of Ag.
In Some Cases… it is an Automatic Referral:
• Oil Spills, Fertilizer, Pesticide, Riparian Buffer Rules
The NCFS Inspection Process …Pt.2
![Page 23: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/23.jpg)
What is “Temporary Compliance” ?
BMP work is done, and currently no erosion or sedimentation… but groundcover vegetation has not yet become established.
• General Rule of Thumb: first growing season.
What is the Statute of Limitations ?
Until the site is permanently stabilized, as a result of the forestry-related operation.
The NCFS Inspection Process …Pt.3
![Page 24: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/24.jpg)
State FY
TotalTimberHarvest
Inspections
# Out of Compliance
OtherActivity
Inspections
# Out of Compliance
2015-16 3,538 63 385 2
2014-15 3,590 62 457 0
2013-14 3,570 70 549 3
2012-13 3,122 105 645 3
NCFS Inspections: …Pt.4, Results
We average 5 - 6 Referrals annually for FPG violations.
Recently, we have seen many more Referrals for Riparian Buffer Rule violations.Those are ‘automatic’ Referrals to Div. of Water Resources.
![Page 25: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/25.jpg)
Forestry BMPs: How Do I Know?
Even when forestry BMPs are used, the logging job may appear “messy” to the un-trained eye.
BMPs can be tangible things = What You Do:• Streamside Management Zones
• Bridgemats… silt fence… gravel on roads… seed/straw…
• Waterbars, Turnouts, Diversions, Wing Ditches
BMPs can also be a “process” = How You Do It:• Timing, equipment… layout of skid trail or road… # of decks
• How and When was the tract logged? Was soil dry?
• Was the SMZ flagged or painted?
• Were roads built beforehand, or pushed on-the-fly?
![Page 26: Logging Job Stabilization & Close-Out · Temporary Erosion Control Blanket Curlex. ... Rolled Erosion Control Product (RECP) Rehab work can remediate soil & site productivity, in](https://reader036.fdocuments.us/reader036/viewer/2022063003/5f759f24347cf3713b4a06a5/html5/thumbnails/26.jpg)
Forestry BMPs: Costs
Out-of-Pocket Costs to use BMPs• All of the stuff: seed, straw, fence, matting, stone
• Logger usually bears these costs.
• Timber Buyer? Purchasing Mill? Landowner?
Opportunity Costs of not implementing BMPs• Returning to the site to fix a problem
• Wear & Tear on equipment, stuck in the mud…
• Reputation
• Lost future soil productivity