LNL Iron Baluster Installation WOOD - The Home Depot · 1. A firm twist of the baluster may be all...

2
SURE WOOD ~ LNL A “How-To” Guide for the installation of iron balusters. Iron Baluster Installation Tread and Riser Installation: Before preceding with the following steps, the handrail height should already be determined. Read all the steps below before beginning installation. Check out our “How-To Build a Staircase Like a Pro” fold out brochure or www.sure-wood.com for more detailed installation instructions. Basic Layout: 1 Post-to-Post Over-the-Post Wall Rail Level Run Handrail Rosette Landing Newel Post Radius End Starting Step Rake Handrail Wall Rail Level Run Handrail Rosette Pin Top Balusters Rake Handrail Newel 2 Post-to-Post Over-the-Post 3 Nosing Overhang equals the tread thickness Post-to-Post Over-the-Post 4 Newel Post Installation: Assemble the Handrail: Rail Bolt Installation Rail Bolt 15/16” 1/4”Dia. Hole 1” Dia. Hole 1 3/8” 2 1/8” 3/8” Dia. Hole Nut & Washer Measure and Trim Newel Posts Using newels as guides, mark handrail and cut to proper length. Follow instructions for attaching newels and temporarily install handrail. Using a plum bob, line up with the holes in the treads and mark the handrail for the top of the baluster. Drill holes using 5/8" drill bit a minimum of 3/4" deep into handrail. Mark baluster placement on treads allowing for equal spacing while following your original design. Drill holes* using 5/8" drill bit a minimum of 3/4" deep into stair treads. Make sure to keep the depths consistent. Mark and Cut Here Measure and Trim Balusters 5 Trim and Install Balusters The rake rail height should be between 36”– 42” (H1) (check local building codes). Center the assembled handrail over the newel locations. Measure the distance between the tread and the bottom of the handrail fitting (A1 and A2). Also measure the rake rail thickness (T1). Use the following formula to calculate the starting newel height. If the newel starts from the floor or a lower tread, add that distance as well. 36” to 41” above front edge of tread Apply glue to ends. Assemble and install nut. Tighten nut with wrench. Fill access hole with wood plug. Assemble the handrail on top of the stair treads prior to installing the newel posts. Use rail bolts and glue at each fitting connection. Complete instructions are included with fittings. Mark Position of Landing Newel and Center-line Baluster Center-line Starting Newel Mark Position of Baluster Center-point* Face of Stringer Marking Your Staircase for Installation Layout your staircase directly on your treads and landings. Carefully mark Newel and Baluster positions and center-lines. Mark Position of Landing Newel and Center-line Baluster Center-line Face of Stringer Mark Position of Baluster Center-point* Starting Newel Starting Easing Fitting Layout Turnout Starting Fitting Layout The balustrade center-line and newel center-points should be laid out. On a knee-wall stair, the balustrade should be centered on the knee-wall. On an open-tread stair, the center-line should be 1/2 of the baluster square in from the face of the stringer (i.e. 5/8” for a 1-1/4” baluster). To properly install solid oak treads and risers, you must first remove the existing steps to expose the rough framing. Leave the beginning riser at base of steps (A). Measure and cut each step separately to ensure tight fit. (B). Pre-drill, apply construction adhesive and nail into place. For added strength, screw treads to risers from behind (C). Complete each step before continuing on to next step. A B C A) Height of the handrail should be between 36” and 42". Check local building codes. B) Place the top of the handrail one inch below the top block of the newel. 36" to 42" above front of tread 1" from top of square part of newel *Check local building codes for proper handrail height. Lag Bolts J-Anchor with Molding Wood Plugs Starting Newel Height B With newel in position where it is to be mounted, slide short end of framing square along slope of stairway. A) Slide into post as shown. Make mark. B) Measure down 1" from top of newel square. Make mark. C) The difference between the two marks "A" and "B" is what will be cut off bottom of newel. Proceed with newel installation. Landing Newel Height A B Newel Post Attachment Trim and Fasten the Newel Posts using one of these methods Follow the instruction on the other side of this brochure to trim and install your Iron balusters. EZLock Newel Post Plate Fastener 101 Sure-Tite Newel Fastener Keylock Newel Post Fastener H1 + A1 – T1 = Starting Newel Height 3 Newel Post Installation: A C Iron Baluster Installation *Metal balusters should be insta led no wider than 4” on center, so that a 4” sphere cannot pass through anywhere along the handrail. Check your local building codes to ensure compliance. *Note: a. 1/2” balusters require 5/8” holes. b. 5/8” balusters require 7/8” holes.

Transcript of LNL Iron Baluster Installation WOOD - The Home Depot · 1. A firm twist of the baluster may be all...

SUREWOOD

~ LNL

Po

st-to

-P

ost

A “

How

-To”

Guid

e for

the

inst

alla

tion o

f iro

n b

alu

sters

.

Iro

n B

alu

ste

r I

nsta

lla

tio

n

Tre

ad

an

d R

ise

r In

sta

lla

tio

n:

Bef

ore

prec

edin

g w

ith th

e fo

llow

ing

step

s, th

e ha

ndra

il he

ight

sho

uld

alre

ady

be d

eter

min

ed.

Rea

d al

l th

e st

eps

belo

w b

efor

e be

ginn

ing

inst

alla

tion.

Che

ck o

ut o

ur “

How

-To

Bui

ld a

St

airc

ase

Like

a P

ro” f

old

out b

roch

ure

or w

ww

.sur

e-w

ood.

com

for m

ore

deta

iled

inst

alla

tion

inst

ruct

ions

.

Ba

sic

La

yo

ut:

1

Po

st-to

-P

ost

Ove

r-th

e-P

ost

Wall

Rail

Leve

l Run

Hand

rail

Rose

tte

Land

ing

New

el

Post

Rad

ius

End

Sta

rtin

g S

tep

Rake

Hand

rail

Wall

Rail

Leve

l Run

Hand

rail

Ro

sett

e

Pin

To

p

Balu

sters

Rake

H

and

rail New

el

2

Po

st-to

-P

ost

Ove

r-th

e-P

ost

3

Nosin

g Ove

rhang

equa

ls the

tread

thick

ness

Po

st-to

-P

ost

Ove

r-th

e-P

ost

4

Ne

we

l P

ost

Insta

lla

tio

n:

Asse

mb

le t

he

Ha

nd

rail:

Ra

il B

olt

In

sta

lla

tio

n

Rail

Bo

lt

15

/16

1/4

”Dia

.H

ole

1”

Dia

.H

ole

1 3

/8”

2 1

/8”

3/8

” D

ia.

Ho

le

Nut

&W

ash

er

Me

asu

re a

nd

Tri

m N

ew

el P

osts

Usi

ng n

ewel

s as

gui

des,

mar

k ha

ndra

il

and

cut t

o pr

oper

leng

th. F

ollo

w

inst

ruct

ions

for a

ttach

ing

new

els

and

tem

pora

rily

inst

all h

andr

ail.

Usi

ng a

plu

m b

ob, l

ine

up w

ith

the

hole

s in

the

tread

s an

d m

ark

the

hand

rail

for t

he to

p of

the

balu

ster

. Dril

l hol

es u

sing

5/8

"

drill

bit a

min

imum

of 3

/4"

deep

into

han

drai

l.

Mar

k ba

lust

er p

lace

men

t on

tread

s al

low

ing

for e

qual

spa

cing

whi

le fo

llow

ing

your

or

igin

al d

esig

n. D

rill h

oles

* usi

ng 5

/8"

drill

bit a

min

imum

of 3

/4"

deep

into

sta

ir tre

ads.

Mak

e su

re to

kee

p th

e de

pths

con

sist

ent.

Mark

and

C

ut

Here

Me

asu

re a

nd

Tri

m B

alu

ste

rs

5Tri

m a

nd

In

sta

ll B

alu

ste

rs

The r

ake r

ail

heig

ht

should

be b

etw

een

36”–

42”

(H1) (c

heck local b

uild

ing c

od

es)

. C

ente

r th

e a

ssem

ble

d h

and

rail

ove

r th

enew

el lo

catio

ns.

Measu

re t

he d

ista

nce

betw

een t

he t

read

and

the b

ott

om

of

the h

and

rail

fittin

g (A

1 a

nd

A2). A

lso

measu

re t

he r

ake r

ail

thic

kness

(T1).

Use

the f

ollo

win

g f

orm

ula

to c

alc

ula

te

the s

tart

ing n

ew

el heig

ht.

If th

e n

ew

el st

art

s from

the f

loor

or

a low

er

tread

, ad

d t

hat

dis

tance

as

well.

36” to

41”

abov

e fro

nt ed

ge

of tre

ad

Appl

y gl

ue to

end

s.

Asse

mbl

e an

d in

stal

l nu

t. Ti

ghte

n nu

t with

w

renc

h. F

ill ac

cess

ho

le w

ith w

ood

plug

.

Asse

mbl

e th

e ha

ndra

il on

top

of

the

stai

r tre

ads

prio

r to

inst

allin

g th

e ne

wel

pos

ts. U

se ra

il bo

lts a

nd

glue

at e

ach

fittin

g co

nnec

tion.

C

ompl

ete

inst

ruct

ions

are

incl

uded

w

ith fi

tting

s.

Mark

Positi

on of

La

nding

New

el an

d Ce

nter-li

ne

Balus

ter C

enter

-line

Startin

g New

el

Mark

Positi

on of

Ba

luster

Cen

ter-po

int*

Face

of St

ringe

r

Marki

ng Yo

ur St

airca

se fo

r Insta

llatio

nLa

yout

you

r sta

ircas

e di

rect

ly on

you

r tre

ads

and

land

ings

. C

aref

ully

mar

k N

ewel

and

Bal

uste

r pos

itions

and

cen

ter-l

ines

.

Mark

Positi

on of

La

nding

New

el an

d Cen

ter-lin

e

Balus

ter C

enter

-line

Face

of St

ringe

r

Mark

Positi

on of

Ba

luster

Cen

ter-po

int*

Startin

g New

el Start

ing Ea

sing F

itting

Layo

utTu

rnou

t Star

ting F

itting

Layo

ut

The b

alustr

ade

cente

r-line

and n

ewel

cente

r-poin

ts sh

ould

be

laid o

ut. O

n a kn

ee-w

all

stair,

the ba

lustra

de

shou

ld be

cente

red

on th

e kne

e-wa

ll. On

an

open

-trea

d stai

r, the

cente

r-line

shou

ld be

1/2 o

f the b

aluste

r sq

uare

in fro

m the

face

of

the st

ringe

r (i.e.

5/8”

for

a 1-

1/4”

balus

ter).

To p

rope

rly in

stal

l sol

id o

ak tr

eads

and

rise

rs, y

ou m

ust f

irst r

emov

e th

e ex

istin

g st

eps

to

expo

se th

e ro

ugh

fram

ing.

Lea

ve th

e be

ginn

ing

riser

at b

ase

of s

teps

(A).

Mea

sure

and

cu

t eac

h st

ep s

epar

atel

y to

ens

ure

tight

fit.

(B).

Pre-

drill,

app

ly co

nstru

ctio

n ad

hesiv

e an

d na

il int

o pl

ace.

For

add

ed s

treng

th, s

crew

trea

ds to

rise

rs fr

om b

ehin

d (C

). C

ompl

ete

each

st

ep b

efor

e co

ntin

uing

on

to n

ext s

tep.

AB

C

A) H

eigh

t of t

he

hand

rail

shou

ld b

e

betw

een

36”

and

42".

Che

ck lo

cal

build

ing

code

s.

B) P

lace

the

top

of th

e ha

ndra

il on

e

inch

bel

ow th

e to

p

bloc

k of

the

new

el.

36"

to

42"

abov

e fro

nt o

f tre

ad

1" fr

om to

p of

sq

uare

par

t of

new

el

*Check lo

cal b

uild

ing c

od

es

for

pro

per

hand

rail

heig

ht.

Lag

Bol

tsJ-

Anch

or

with

Mol

ding

Woo

d Pl

ugs

Sta

rtin

g N

ew

el H

eig

ht

B

With

new

el in

posit

ion w

here

it is

to b

e m

ount

ed, s

lide

shor

t end

of f

ram

ing s

quar

e alo

ng

slope

of s

tairw

ay.

A) S

lide

into

post

as

show

n. M

ake

mar

k.B)

Mea

sure

dow

n 1"

from

top

of n

ewel

squa

re. M

ake

mar

k.

C) T

he d

iffere

nce

betw

een

the

two

mar

ks "A

" and

"B" i

s wh

at

will b

e cu

t off

botto

m o

f new

el.

Proc

eed

with

new

el ins

talla

tion.

La

nd

ing

Ne

we

l H

eig

ht

AB

Newe

l Pos

t Atta

chme

ntTr

im a

nd F

aste

n th

e N

ewel

Pos

ts u

sing

on

e of

thes

e m

etho

ds

Follo

w th

e in

stru

ctio

n on

the

othe

r sid

e of

this

bro

chur

e to

trim

and

inst

all y

our I

ron

balu

ster

s.

EZ

Lo

ck

New

el

Post

Pla

te

Fast

ener

101

Sure

-Tite

New

el

Fast

ener

Ke

ylo

ck

New

el P

ost

Fast

ener

H1

+ A

1 –

T1

= S

tart

ing

Ne

we

l H

eig

ht

3N

ew

el P

ost

Insta

lla

tio

n:

A C

Iro

n B

alu

ste

r In

sta

lla

tio

n

*Meta

l balu

sters

shou

ld be

insta

lled no

wide

r than

4”

on ce

nter, s

o tha

t a 4”

sphe

re ca

nnot

pass

throu

gh

anyw

here

along

the h

andra

il. Ch

eck y

our lo

cal

buildi

ng co

des t

o ens

ure co

mplian

ce.

*Not

e:

a. 1

/2”

balu

ster

s re

quire

5/8

” ho

les.

b.

5/8

” ba

lust

ers

requ

ire 7

/8”

hole

s.

1.

A firm

tw

ist

of th

e b

alu

ster

may

be a

ll th

at

is n

ecess

ary

to

rem

ove

balu

ster

from

tr

ead

and

hand

rail.

Rem

ove

any

nails

rem

ain

ing o

r fa

steners

.

2.

Once lo

ose

ned

, lif

t th

e

balu

ster

up

into

the h

and

rail,

enough t

o c

lear

the s

tair

tread

at

the b

ott

om

, and

th

en t

ilt it

to t

he s

ide a

nd

pull

out

from

the h

and

rail.

1.

Cut

balu

ster

in h

alf

with

a

hand

or

pow

er

saw

.

2.

Twis

t each h

alf

to lo

ose

n.

3.

Rem

ove

each h

alf

of th

e

balu

ster

from

the s

tair t

read

and

hand

rail,

and

any

nails

re

main

ing o

r fa

steners

.

4.

If glu

e a

nd

/or

wood

stil

l re

main

s in

the h

ole

s, a

d

rill

with

a 1

/2”

bit

can

be u

sed

to r

em

ove

any

exc

ess

.*

Fla

t S

hoe

Rake S

hoe

Ch

oo

se

yo

ur

loo

k .

..

*Check lo

cal b

uild

ing c

od

es

to e

nsu

re c

om

plia

nce

Re

pla

cin

g W

oo

d B

alu

ste

rs w

ith

Iro

n B

alu

ste

rs

1st

Me

tho

d:

Wood-to-Iron Retrofit in just a day!

Doub

le

Bask

et

Balu

ster

Sin

gle

B

ask

et

Balu

ster

Add the Elegance of Iron to your home.Tri

m I

ron

Ba

luste

rs t

o fi

t.

Usi

ng a

meta

l tap

e m

easu

re,

measu

re t

he d

ista

nce fro

m

the fro

nt

hole

in t

he s

tair t

read

to

the c

orr

esp

ond

ing h

ole

in

the b

ott

om

of th

e h

and

rail.

It m

ay

be n

ecess

ary

to d

rill

the h

ole

deep

er

into

the

hand

rail

to a

ccom

mod

ate

the

balu

ster. B

e c

are

ful t

o N

OT

drill

thro

ugh t

op

of hand

rail.

Do t

his

sam

e p

roced

ure

fo

r th

e a

ll hole

s in

the

stair t

read

.

To e

ach o

f th

ese

measu

rem

ents

ad

d 1

½”.

Exa

mp

le: 35”

+ 1

½”

= 3

6 -

½”

This

is y

our

balu

ster

length

.

Usi

ng t

he a

bove

measu

rem

ent,

cut

the b

alu

ster

to t

he le

ngth

need

ed

. B

e s

ure

to c

ut

from

the

bott

om

of yo

ur

balu

ster. T

he t

op

is

the e

nd

with

the r

ound

ed

tip

.

A C

hop

Saw

with

a m

eta

l-cutt

ing b

lad

e is

the p

refe

rred

w

ay

to c

ut

the ir

on b

alu

sters

. Ta

ke c

are

when m

ark

ing a

nd

cutt

ing t

he b

alu

sters

. U

se s

afe

ty

gla

sses

and

follo

w p

rop

er

safe

ty p

recautio

ns

while

cutt

ing

balu

sters

. N

ote

: Iron c

an b

e

ext

rem

ely

hot

after

cutt

ing.

Fla

t S

ho

e

Ra

ke

Sh

oe

Ra

ke

1.

2.

3.

5.

4.

Befo

re p

lacin

g t

he b

alu

sters

in

the s

tairc

ase

, to

p a

nd

bott

om

“s

hoes”

must

be in

sert

ed

on b

oth

end

s. L

oose

n s

et

scre

ws

to in

sert

balu

ster

end

s. F

ace s

et

scre

ws

in

sam

e d

irectio

n.

6.

A R

AK

E s

hoe s

hould

be

pla

ced

at

the t

op

(P

in e

nd

) of

each b

alu

ster. A

FLA

T s

hoe

will g

o a

t th

e c

ut

end

of each

balu

ster. T

ighte

n in

pla

ce a

fe

w in

ches

from

each e

nd

. This

keep

s th

em

secure

during

pla

cem

ent

of th

e b

alu

ster.

7.

Make s

ure

the “

rake”

of th

e

shoe c

oin

cid

es

with

the a

ngle

of th

e h

and

rail.

The a

ngle

of

the r

ake s

hoes

may

have

to

be a

dju

sted

with

a g

rind

er

or

belt

sand

er

for

the b

est

fit.

TIP

: Te

st-f

it al

l bal

uste

rs

befo

re s

ecur

ing

with

epo

xy.

8.

Once t

he e

poxy

has

set,

the

rake a

nd

fla

t sh

oes

can b

e p

ut

into

posi

tion a

nd

secure

d w

ith

an a

llen w

rench.

11.

Pla

ce t

he P

in T

op

into

the

hand

rail

hole

first

and

then in

to

the s

tair t

read

hole

. S

traig

hte

n

balu

ster

once in

sert

ed

. The

Pin

Top

should

pre

ss firm

ly

again

st t

he fro

nt

of th

e

hand

rail

hole

,makin

g s

ure

that

the fla

t sh

oe a

t th

e b

ott

om

sq

uare

s up

w

ith t

he fro

nt

of

the s

tep

.

10.

Follo

win

g m

anufa

ctu

rers

in

stru

ctio

ns,

pla

ce e

poxy

in

the s

tair t

read

hole

and

som

e

on t

he P

in T

op

of th

e b

alu

ster.

9.

Tw

o M

eth

od

s f

or

the

Re

mo

va

l o

f O

ld B

alu

ste

rs:

Insta

llin

g N

ew

Iro

n B

alu

ste

rs

Doub

le

Twis

t B

alu

ster

Sin

gle

Tw

ist

Balu

ster

2n

d M

eth

od

3.

If glu

e a

nd

/or

wood

stil

l re

main

s in

the h

ole

s, a

d

rill

with

a 1

/2”

bit

can

be u

sed

to r

em

ove

any

exc

ess

.*

Insta

ll a

nd

Se

cu

re B

alu

ste

rs

2 B

alu

sters

per

step

*

3 B

alu

sters

per

step

*

Ba

luste

r To

p

35”

Ad

d

”36½

Trim

and

d

iscard

th

is

sectio

n

The m

easu

rem

ent

from

the t

op

of th

e s

tair t

read

to t

he b

ott

om

of th

e h

and

rail.

This

is t

he le

ngth

to

whic

h y

ou t

rim

th

e b

alu

ster.

SO

M300114 E

ffectiv

e 1

1/2

0/2

006 r

ev0

62010

*Not

e:

a. 1

/2”

balu

ster

s re

quire

5/8

” ho

les.

b.

5/8

” ba

lust

ers

requ

ire 7

/8”

hole

s.