April 2012 1 LLWR Customer Forum Dennis Thompson Managing Director, LLWR

description

LLWR Customer Forum. Dennis Thompson Managing Director, LLWR. Baseline 2006 Inventory Forecast. Current SLC LTP. 2010 2020 2030 2040 2050 2060 2070 2080 2090 2100 2110 2120. Year. Initial Conditions. (1)The case for long term disposal at LLWR was rejected by the EA. - PowerPoint PPT Presentation

Transcript of LLWR Customer Forum

Page 1: LLWR Customer Forum

April 2012 1

LLWR Customer Forum

Dennis ThompsonManaging Director, LLWR

Page 2: LLWR Customer Forum

April 2012 2

Initial Conditions

(1)The case for long term disposal at LLWR was rejected by the EA

(2)Vault 8 almost completely full

(3)LLW generation forecasts indicate that LLWR would be full by 2025

Baseline 2006 InventoryForecast

Current SLC LTP

2010 2020 2030 2040 2050 2060 2070 2080 2090 2100 2110 2120

Year

Page 3: LLWR Customer Forum

April 2012 3

Initial Conditions

(1)The case for long term disposal at LLWR was rejected by the EA

(2)Vault 8 almost completely full

(3)LLW generation forecasts indicate that LLWR would be full by 2025

Baseline 2006 InventoryForecast

2010 2020 2030 2040 2050 2060 2070 2080 2090 2100 2110 2120

Year

With hierarchyimplementation

Page 4: LLWR Customer Forum

April 2012 4

We need to find a way to:

1) Dramatically reduce the volume of waste coming to the Repository for disposal

2) Continue to support the NDA with its primary mission of decommissioning

Page 5: LLWR Customer Forum

April 2012 5

3 Pronged Strategy

1) Develop a National Strategy for LLW management and get national buy-in to both the strategy and its implementation.

2) Begin to work with the supply chain to develop the necessary services to implement the national strategy

3) Establish robust contracts with all our consignors which will provide access to all the services.

Page 6: LLWR Customer Forum

April 2012 6

• Pre-existing services

– Disposal of LLW at the repository

– Disposal containers

– Compaction of waste through the WAMAC facility

• New contracts with each consignor April 2010

• The National LLW Strategy approved by Government August, 2010

Framework established for Metal Treatment August 2010

Framework established for Combustible Waste October

2010

VLLW Service available April, 2012

Transport & Logistic service available April 2012

Characterisation Service available April 2012

Key Implementation Milestones Key Implementation Milestones

Page 7: LLWR Customer Forum

April 2012 7

Waste Services Contract

Waste Management Services – Operating Model