PANAMA-BUENA VISTA UNION SCHOOL DISTRICT PLAN FOR CONTINUOUS IMPROVEMENT.
Linda Vista Comprehensive Active Transportation Strategy (CATS) · Vista Shopping Center ZONE D •...
Transcript of Linda Vista Comprehensive Active Transportation Strategy (CATS) · Vista Shopping Center ZONE D •...
Workshop #2June 21st, 2016
Linda Vista Comprehensive Active Transportation Strategy (CATS)
Agenda
• Project Overview
• What We Heard
• Types of Improvements
• Feedback Activity
• Next Steps
Project Objective How can we improve pedestrian and bike connections in Linda Vista?
Community Outreach
Workshop #1
MetroQuest Survey
Bike/Walk Audit
Project Timeline
Data collection & analysis
Community input
Draft improvement projects
Community input
Prepare Master Plan
Workshop #1Oct 2014
City Staff Charrette #2
June 2016
City Staff Charrette #1
Nov 2014
Workshop #2June 2016
Bike and WalkAudit
What We Heard
Themes• Presence of Jaywalking
around the Shopping Center, on Linda Vista Rd. near Mesa College Dr. and by USD
• Unsafe crossing for school-aged children around schools
• Roads in need of traffic calming
• Roads in need of better bicycle facilities
Design Recommendations• Add midblock crossings
near Linda Vista Shopping Center and near USD
• Add lighting• Add/widen sidewalks• Improved crossings• Add bus shelters• Add buffered/green bike
lanes
How We Determined Improvements
Community Input
City FeedbackData Analysis
Types of Improvements
Intersection Improvements | Neighborhood Traffic Circles
Neighborhood Traffic Circles Purpose: allow bike traffic to continue safely through the intersection without stopping.
Protected Intersections Purpose: allow all bicycle turning movements to occur without potential conflicts with cars
Intersection Improvements | Protected Intersections
Bicycle Facilities | Buffered Bike Lanes
Buffered Bike lane at Genesee Ave and Osler St
Bicycle Facilities | Protected Bike Lane
Protected Bike Lane in Seattle, WA
Bicycle Facilities | Cycle Track
Cycle Track Along Friars Road
Bicycle Facilities | Sharrow
Sharrow on Via Las Cumbres
Bicycle Facilities | Bike Box
Bike Box in Tucson, AZ
Pedestrian Facilities| Crosswalks
Continental Crosswalk at Linda Vista Road and Mesa College Drive
Raised Crosswalk in San Francisco, CA
Pedestrian Facilities| Improvements
Bulb-Outs/ Curb Extensions at Mid-block Crossing
Pedestrian Refuge
Pedestrian Facilities| Signals
HAWK Signal in San Diego
Active TransportationRecommendations
Corridor Improvements
Recommendations | Linda Vista Road Corridor
• Completing buffered bike lanes along Linda Vista Road LINDA
VISTA SHOPPING
CENTER
MONTGOMERY MIDDLE SCHOOL
LINDA VISTA ELEMENTARY
SCHOOL SAN DIEGO COOPERATIVE
CHARTER SCHOOL
KEARNY HIGH SCHOOL
CARSON ELEMENTARY SCHOOL
FRANCIS PARKER SCHOOL
MARK TWAIN HIGH
SCHOOL
UNIVERSITY OF SAN DIEGO
Recommendations | Mesa College Dr Corridor
• Add buffered bike lanes west of Armstrong St and from Ashford to SR-163 overpass
• Widen sidewalkin front of Kearny High School
Recommendations | Genesee Ave Corridor
• Add buffer to bike lane from Linda Vista Rd to Whitney
Recommendations | Ulric St Corridor
• Add lighting from Tait St to SR 163 Ramp
• Add two-way cycle track with bike lanes from David St to Friars Rd
Recommendations | Via Las Cumbres Corridor
• Add sidewalk to east side of street from Linda Vista Rd to Friars Rd
Improvement Areas
Improvement Area A |Mesa College Drive from Linda Vista Rd to SR-163 Ramp
Improvement Area A Green Bike Lane
Protected Bike Lane
Buffered Bike Lane
Improvement Area BLinda Vista Road and Mesa College Drive
Improvement Area BLinda Vista Road and Mesa College Drive
Continental Crosswalks Buffered Bike Lanes
Protected Bike Lanes
Improvement Area CLinda Vista Road and Korink Avenue
Improvement Area CLinda Vista Road and Korink Avenue
Pedestrian Refuge
Buffered Bike Lanes
Alternative - Signalized
Improvement Area DUlric Street
Improvement Area DUlric Street
Neighborhood Traffic Circles
Sharrows
Improvement Area ELinda Vista Road and Genesee Avenue
Improvement Area ELinda Vista Road and Genesee Avenue
Protected Intersection
Continental Crosswalks Alternative – 2 Lane Roundabout
Improvement Area FGenesee Avenue at SR-163 On-Ramp
Improvement Area FGenesee Avenue at SR-163 On-Ramp
Green Bike Lane
Improvement Area G & ILinda Vista Shopping Center
Improvement Area G & I
PedestrianRefuge
Curb Pop-Outs
Bike Box
Continental Crosswalks
Buffered Bike Lanes
Improvement Area JLinda Vista Road at USD Stairwell
Improvement Area JLinda Vista Road at USD Stairwell
HAWK Signal
Improvement Area LKramer Street and Coolidge Street
Improvement Area LKramer Street and Coolidge Street
Raised Crosswalks
Curb Pop-OutsAlternative – Neighborhood
Traffic Circle
Small Group
Breakout
Feedback Exercise| Feedback
• Review Recommendations in each of the zones
• Clarify/ask questions of the Team
• Priorities: Use dots to indicate your
preferred improvements
• Anything missing? Use Post-it Notes to record
anything we missed!
Small Group Exercise | Feedback
ZONE A• Improvement Area A: Mesa
College Dr from Linda Vista Rd to SR-163 On-Ramp
• Improvement Area B: Linda Vista Rd and Mesa College Dr
• Improvement Area C: Linda Vista Rd and Korink Ave
ZONE B• Improvement Area E: Linda Vista
Rd and Genesee Ave• Improvement Area F: Genesee Ave
and SR-163 On-Ramp
ZONE C• Improvement Area D: Ulric
Street• Improvement Area G & I: Linda
Vista Shopping Center
ZONE D• Improvement Area J: Linda Vista
Rd and USD Stairwell• Improvement Area L: Kramer
Street and Coolidge Street
Next Steps
• Finalization of Concepts• Writing of CATS Plan• Charrette #3
• Review of CATS Plan
• Finalization of Final Plan