  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    1/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    2/13

    LIFTING PLAN

    Project : WATER TREATMENT PLANT IMPROVEMENT BANGKO CAMP

    No Contract : DOC090812

    Area : Area WTP BANGKO CAMP PT. CPI

    ENGI NEERI NG CALCULATI ON

    1. SAND FI LTER

    Weight of Vessel & accessories = 1890 kg

    Weight of packaging = 75 kg Total Weight of Sand Fiter = 1890 kg + 75 kg = 1965 kg

    2. CARBON F I LTER

    Weight of Vessel & accessories = 2020 kg

    Weight of packaging = 75 kg

    Total Weight of Sand Fiter = 2020 kg + 75 kg = 2095 kg

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    3/13

    ENGI NEERI NG CALCULATI ON

    3. SOFTENER F ILTER

    Weight of Vessel & accessories = 1780 kg

    Weight of packaging = 75 kg

    Total Weight of Sand Fiter = 1780 kg + 75 kg = 1855 kg

    4. REVERSE OSMOSI S SYSTEM

    Weight of Vessel & accessories = 1678 kg

    Weight of packaging = 200 kg

    Total Weight of Sand Fiter = 1678 kg + 200 kg = 1878 kg

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    4/13

    TADANO MOBI LE CRANE TR350XL35 TONS CAPACI TY

    Componen WeightHook Bolock : 350 kgSlings&Misc.Lifting Equip. : 10 kgWire Rope Beneath : 30 kg

    TOTA L : 390 kg

    Boom Length : 26.9 mLoad Radius max. : 14.0 mCrane Capacity : 3,300 kg

    WeightErection Weight : 2,216.14 kgComponen Weight : 390 kgTOTA L W eight : 2 ,606 .14 k g

    Safety Factor ( SF) Safety Factor : Crane Capacity

    Total Weight: 3,300 kg

    2,606.14 kg

    : 1.266

    Procentase SF : 2,606.14 kg x 100%3,300 kg

    : 78.97 %

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    5/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    6/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    7/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    8/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    9/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    10/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    11/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    12/13

  • 7/28/2019 Lifting Plan EPI - WTP Improvement Bangko Camp

    13/13