Life Cycle Cost Of Selecting Chiller Equipment...

19
Life Cycle Cost Of Selecting Life Cycle Cost Of Selecting Chiller Equipment: Chiller Equipment: Manufacturer’s Viewpoint Manufacturer’s Viewpoint Daryl Showalter ChillerApplications Manager McQuay International

Transcript of Life Cycle Cost Of Selecting Chiller Equipment...

Page 1: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Life Cycle Cost Of Selecting Life Cycle Cost Of Selecting Chiller Equipment:Chiller Equipment:

Manufacturer’s ViewpointManufacturer’s Viewpoint

Daryl ShowalterChillerApplications Manager

McQuay International

Page 2: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

EquipmentEquipmentn Using Different Kinds Of

Equipment Or Different Performance Equipment Can Improve Cost

n Difficult Part Is To Evaluate Life Cycle Analysis

Page 3: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Air Cooled Vs. Water CooledAir Cooled Vs. Water Cooled

n Water Cooled Will Be More Energy Efficient

n It Usually Costs Less To Operate– Maintenance And Water

Costs

nn For Optimization Go Water For Optimization Go Water CooledCooled

Page 4: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Water Cooled Water Cooled -- Optimizing SelectionsOptimizing Selections

n Enter Design Data Into The Program

– Start The Processu Choose The Chiller

After A Large Vertical Drop

u Look At The Number Of Selections And Prioritize

uAnalyze Options

Not Good

Good Selection

Cost

Page 5: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Review ComponentsReview ComponentsIn Selecting The Chiller Look At:

– Vessel Length Changes

– Vessel Diameter Changes

– Vessel Tube Count

– Compressor / Gear Selection-If Appropriate

– Motor Size

– Number Of Passes

Page 6: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Conditions Of Service:

– Use Lower Entering Condenser Water Temp

– Use Higher Leaving Chilled Water Temp

– 1/2 Degree Anywhere Makes a BIG Difference !!

– MINIMIZE LIFT

Optimizing PerformanceOptimizing Performance

Page 7: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Range Vs. Supply Water TemperatureRange Vs. Supply Water Temperaturen Declining Supply Water Temperature (44 To 38F)n Increase Chilled Water Range From 10 To 24Fn Annual Energy Analysis

Run C.W. Range C.W. S.T. Chiller Pumps Tower Fan S.A. Fan Total(°F) (°F) ($/yr) ($/yr) ($/yr) ($/yr) ($/yr)

1 10 44 26,074 15,175 1,591 28,275 71,1152 12 44 26,096 13,784 1,593 28,560 70,0333 16 44 26,211 12,055 1,597 29,350 69,2133 14 42 27,733 12,790 1,593 28,573 70,6894 16 42 27,779 12,039 1,593 28,570 69,9815 18 40 29,371 11,462 1,594 28,584 71,0116 20 40 29,351 11,002 1,596 28,872 70,0817 22 38 30,365 10,623 1,596 28,881 71,465

Page 8: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

99% Of All Operating 99% Of All Operating Hours Are At Part LoadHours Are At Part Load

Page 9: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

The New Industry ARI StandardThe New Industry ARI Standard --1998 1998

Part Load Analysis (IPLV)Part Load Analysis (IPLV)

% Load Old % Hrs New % Hrs100 17 175 39 4250 33 4525 11 12

Systems Solution

Page 10: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

n High Glycol = Low Heat Transfer:

– Propylene Glycol Has Really Bad Heat Transfer Properties –Increases Head On Compressor

– Utilize Less % Of Glycol - Even 0.5% Can Make A Difference– ASHRAE Fundamentals: Physical Properties Of Secondary

Coolants

n Don’t Limit Input Values – Run Selections Multiple Ways

Optimizing SelectionsOptimizing Selections-- Glycol!Glycol!

Page 11: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

n High Pressure Drops?– Look At 1 Pass Vessels– Look At Reducing Evaporator Or

Condenser Length– Tube Thickness Can Increase

Pressure Drop

n Conversely - High Temperature Difference?– Look At (3) Pass– Look At Series Flow With 1, 2,

Or 3 Pass

VesselsVessels

Single Pass

Two Pass

Three Pass

Page 12: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

n Low NPLV Or IPLV: Look At Multiple Compressor Or VFD– Sort By NPLV/IPLV – Lowest NPLV Is Not Normally The Lowest Full Load kW/Ton – Slight Decrease In Full Load KW/TR Can Dramatically Increase

Cost And Actually Increase NPLV/IPLV!

Optimizing SelectionsOptimizing Selections-- F.L. Vs. IPLVF.L. Vs. IPLV

Page 13: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Various 500 Ton ChillersVarious 500 Ton Chillers

.6

.5

.4

.3WSC WDC WDC w/VFDWSC w/VFD

.505

.403

.365.337

IPLV

Notes: WSC = Single Compressor Centrifugal ChillerWDC = Dual Compressor Centrifugal ChillerVFD = Variable Frequency Drive

Page 14: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

n Multiple Chillers On A Job?– High Temperature Difference Across The Evaporator?

u Look At Series / Counterflow Arrangementsu 1 Multiple Compressor Instead Of 2 Singles

System ConsiderationsSystem Considerations

Page 15: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Cooling Tower ConsiderationsCooling Tower Considerations

n Oversize Tower To Lower Condenser Water Supply Temperaturen Chiller Stays Same Price, Efficiency Improves 11%n Tower Capital And Operating Cost Up Slightlyn 3% Annual Savings

Run Cond .W.S.T. Chiller Chiller Pumps Tower Fan S.A. Fan Total(°F) kW/Ton ($/yr) ($/yr) ($/yr) ($/yr) ($/yr)

1 85 0.547 24,435 15,209 1,441 24,512 65,5972 84 0.535 23,842 15,207 1,463 24,508 65,0203 83 0.524 23,425 15,205 1,482 24,505 64,6174 82 0.514 23,055 15,203 1,501 24,502 64,2615 81 0.492 22,147 15,199 1,526 24,496 63,3686 80 0.483 21,848 15,197 1,548 24,942 63,535

Page 16: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Annual WB In Major US CitiesAnnual WB In Major US Cities

-

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

Janu

ary

Febru

aryMarc

hAp

rilMay

June Ju

ly

Augus

t

Septe

mber

Octobe

r

Novem

ber

Decem

ber

Los Angeles Washington DC Atlanta Chicago Miami

Strong Candidates ForVFD Chillers

Page 17: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Optimizing Starter SelectionsOptimizing Starter Selections

n Try Different Starters– Solid State Starters Have Different Size Breaks

Than Wye Delta Starters– Solid State Starters Are Now Cheaper In Most

Cases - Try Both Ways Depending Upon Size Breaks

– Try Unit Mounted And Free Standing - Size Breaks Can Make Different Selections Appear

– Check VFD Sizing –Expensive At Very Bottom Of Amp Rating

Page 18: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

Variable Flow Vs. Constant FlowVariable Flow Vs. Constant Flow

0

50000

100000

150000

200000

250000

300000

350000

400000

450000

500000

Chillers Pumps Towers Fans

kWh

Variable Primary Flow 2 Chiller Primary/Secondary Flow 2 Chiller Parallel Flow

Notice Pump WorkHalf Chiller Work!

Pump Work Cut In Half

Page 19: Life Cycle Cost Of Selecting Chiller Equipment ...siteresources.worldbank.org/INTMP/1109722-1115893415089/20488075/... · Life Cycle Cost Of Selecting Chiller Equipment: Manufacturer’s

WrapWrap--upup

n Many Ways To Solve An Application

n Selection Is Only As Good As The Data Given

n Optimize Your Selections