Lesotho Electricity Authority Annual Report 2012/13 LEA... · Francina Moloi Chairperson ‘Mampho...
Transcript of Lesotho Electricity Authority Annual Report 2012/13 LEA... · Francina Moloi Chairperson ‘Mampho...
Annual ReportLesotho Electricity Authority
2012/13
CONTENTS
Board of Directors 2
Chairperson’s Report 3
Chief Executive’s Statement 6
DEPARTMENTAL REPORT
1 TechnicalRegulation-Electricity 09 2 TechnicalRegulation-Water 11 3 EconomicRegulation 13 4 LegalServices 18 5 CustomerAffairs 20 6 Finance,HumanResourcesandAdministration 22 7 CooperationwithRegionalandInternationalBodies 24
ELECTRICITY SECTOR DEVELOPMENTS
1 ElectricitySectorDevelopments 26
FINANCIAL STATEMENTS
1 FinancialStatements 30
© Lesotho Electricity Authority 2013
Lesotho Electricity Authority, 6 Floor, Moposo House, Kingsway, Maseru, Lesotho
Tel: +266 22 312479 Fax: +266 22 315094
Email: [email protected] Website: wwww.lea.org.ls
ANNUAL REPORT - 2012/13 1
ANNUAL REPORT Lesotho Electricity Authority
CHAIRPERSON’S REPORT
OnbehalfoftheLesothoElectricityAuthority’s(LEA)Board,itiswithadeepestsenseofgratificationthatIpresenttheAuthority’s2012/13AnnualReportwhichcontainsthehighlightsoftheactivitiesandachievementsoftheAuthorityduringthereportingperiod.TheReportisinclusiveofauditedFinancialStatementsforthesameperiod.Itmaybepropertoindicatethat, lookingatthedevelopmentsin
theurbanwaterandsewerageservicesregulatorylandscape,thisreportcouldbethelastoneissuedbyLEAinitscurrentconstitutionandmandate.TheGovernmenthastakenadecisiontotransformtheAuthorityintoamulti-sectorregulatorassumingadditionalpowerstoregulatetheurbanwaterandsewerageservicessub-sector.TheactivitiesleadingtotherealisationofthesaidgoalarewelldocumentedintheReport.
InordertoachievetheobjectivesofregulationasenvisagedundertheLesothoElectricityAuthorityAct,2002asamended,severalkeyactivitiesoftheBoardwerecarriedout.Ofthose,Iwishtomentionthedeterminationofthe2012/13electricityprices.LEAreceivedatariffapplicationfromtheLesothoElectricityCompany(LEC)foranaveragetariffincreaseof25%onenergychargesand27%onmaximumdemandchargeswitharevenuerequirementofM550million.FollowingapublicconsultationprocessandLEA’sanalysisof theapplication,theBoard resolved that theapproved revenue requirement for LEC, including customerandelectrificationlevies,wouldberealisedfromend-usertariffincreasesof6.9%forlargecustomers,7.4%forstreetlighting,and6.9% for domestic andgeneral purposeon energy chargesand9.7%onmaximumdemandchargesforlargeusers.Thecustomerlevywasincreasedby8%fromM0.0213/kWhtoM0.0230/kWhwhiletheelectrificationlevywasnotchanged.
ItwillberecalledthattheAuthorityhasestablishedaUniversalAccessFund(UAF)toassisttheGovernmentin itselectrification initiatives.TheBoardapprovedM8,700,000.00,asa totalUAFbudget for2012/13.RegardingimplementationoftheUAF-fundedelectrificationprojects,theHaRafolatsaneelectrificationscheme(inMokhotlongdistrict)wastheonlyprojectthatwascompletedalthoughtheworktoelectrifytheareahadcommencedinthefinancialyear2011/12.
1
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
BOARD MEMEBERS - 2012/132 CHAIRPERSON’S STATEMEMENT - 2012/13 3
Francina Moloi (Professor)Chairperson
Disclosure of InterestThe Authority is a Government regulatory agency with no shareholding. The Members do not hold any financial interest in the Authority.
‘Mampiti MateteBoard Member
Francina MoloiChairperson
‘Mampho Kotelo-’Molaoa Board Member
Karabo MohauBoard Member
Leboli ThamaeBoard Member
‘Maboiketlo MalieheBoard Member
Retselisitsoe MotlojoaBoard Member
Ntoi RapapaChief Executive
Auditor’s AppointmentIn terms of the LEA Act, the Auditor General is the Auditor of the Authority.
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
CHAIRPERSON’S STATEMEMENT - 2012/134 CHAIRPERSON’S STATEMEMENT - 2012/13 5
Furthermore,theLEABoardapprovedtheDepartmentofEnergy’s(DoE)applicationforextensionoflicenceexemption for the Electricity AccessPilot Projects (EAPPs) fromOctober2012 to September2014. It isanticipated that theDoEwould, inmotivating for furtherextensionorotherwise,provide theAuthoritywithlessonslearntfromthepilotprojectssothatappropriatemechanismscanbeputinplacetoincreaseaccesstoelectricity.
TheBoardisawareofthehugeimplicationsofprudenceinfinancialmanagementatatimewhenthecountryisonacampaigntofightthescourgeoffinancialmismanagementinitsvariousforms.Inthisregard,thenotionoftransparencycontinuedtobethebasisofregulationoftheelectricitysector.ThisrealityisevidencedbytheattachedFinancialStatementsforthereportingyear.
AnotherareathatIwishtoreflectonistheresolutionofcomplaintsbetweenlicenseesandcustomers.TherewasasteadyimprovementwithregardtoLEA’scomplaintsresolutionmechanismsinthattherelativenumberofunresolvedcaseshasbeenreduced.InarelateddevelopmentgearedtowardsenhancingLEA’sreadinessforassumptionofurbanwaterandsewerageservicesregulation,theLesothoElectricityandWaterAuthority(ResolutionofComplaintsforWaterServices)Rules2013werefinalisedandpendingpublication.TheRulesaretobeappliedinresolvingcomplaintsthatpertaintotheurbanwaterandsewerageservices.TheAuthorityalso finalised other regulatory instruments for the anticipated urbanwater supply and sewerage servicesregulation. Inthisreport,detailedinformationregardingtheapplicationandbenefitsoftheseinstrumentsisprovided.
The issue of fairness of connection charges to electricity customerswas considered by theBoard. In thisregard, the Lesotho Electricity Authority (LEA) Electricity ConnectionChargesGuidelineswere approved bytheAuthorityandbecameoperationalfrom01September,2012.ThepurposeoftheGuidelinesisamongstothers, toguideLEConstepstotake in formulating fairandtransparentchargeswithregardtoelectricityconnections.
TheAuthority’svision istobecomeaworldclassregulator.LEAcommits itselftobearegulatorybodythatupholds,amongstothers,thevaluesoftransparencyandprofessionalism.ThiswasrealisedwhentheAuthorityextensivelyinvolvedtheWaterandSewerageCompany(Pty)Ltd(WASCo),thewaterutility,indevelopingtheregulatoryinstrumentsforthewatersector.
It would be a remiss not to acknowledge that the regulated entities (Licensees) displayed a movementtowardsembracingregulationoftheelectricitysector.Thisdevelopmentwashighlyappreciatedasnoticeableimprovementsweremadeonmatterspertaining toservicedeliverybyLicensees.Nevertheless, theBoardnotedthattheLicensees,especiallyLEC,werenotreportingasrequiredunderthelawandsubsidiarylegislation.Inthisregard,itisimperativethat,duringthenextfinancialyear,theyshouldenhancetheirreportingtotheAuthoritysothatthelattermaydischargeitsresponsibilitiestothefullest.
The contribution that the non-governmental organisations, academia, industries, consumer associations,commercialsector,electricitycustomersandotherstakeholdersmadeduringregulatoryprocessessuchaselectricity tariffs reviewsundertakenbyLEAhasnotgoneunnoticed.TheAuthority indeedappreciates theactiveparticipationandinvolvementofthecivilsocietyintheregulatoryprocesses.Theintentionistoescalatetheuseofconsultativeprocessestoahigherlevelforincreasedinclusivenessandstakeholderbenefit.
Throughout the year,Membersof theBoard indicated their unwavering commitment anddedicationwhileexecutingtheirfiduciarydutiesfortheAuthority.ThishasbeenequallythecasewiththeAuthority’semployees.BoththeBoardandtheAuthority’sstaffareappreciatedandhighlycommendedfordemonstratingahighlevelofmaturity,professionalismandadherencetogoodcorporategovernanceintheexecutionoftheirduties.
I would also like to thank our cooperating partners, namely, the United States Agency for InternationalDevelopment(USAID)andtheWorldBankfortheirassistance.TheUSAIDprovidedfinancingforthepowerplanningtrainingcourseorganisedfortheelectricitysupplyindustry’s(ESI)stakeholdersthatincludedamongstothers,LEA,DoEandLEC.TheWorldBankhasbeeninstrumentalinassistingtheAuthoritywiththedevelopmentoftheregulatoryinstrumentsforurbanwatersupplyandsewerageservicesincludingpartoftheAuthority’sstaffcosts.
WithoutthesupportoftheGovernment,theAuthoritywouldnothaveachieveditsobjectivesduringtheyear.This support ismorecommendablewhenone realises thatwhen thenewGovernmentassumedpower in2012,itdisplayedandconstantlysustainedgreatenthusiasmtoconsultroleplayersonallaspectspertainingtotheelectricityservicesprovisioninthecountry.OurspecialtributegoestotheHonourableMinisterofEnergyMeteorologyandWaterAffairs(MEMWA),Dr.TimothyThahaneforhisexceptionalleadership,guidanceandcontinuedsupporttotheAuthority.
Inconclusion,IwishtoassureeveryLEAstakeholderthatwetakethemandateoftheAuthorityseriouslyandpledgetocontinueservingboththecountryandtheelectricitysectorwithhonourmotivatedbyourperennial
professionalismq
FrancinaLMoloi(Prof.)Chairperson
The Minister of Energy, Meteorology and Water Affairs Dr. Thimothy Thahane (left) interacts with some of the LEA and WASCO Board Members during the Minister’s end of year function in December, 2012.
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
CHIEF EXECUTIVE’S STATEMENT
Itiswithsincerepleasurethat Ireport,onbehalfoftheManagementandStaffoftheLesothoElectricityAuthority(LEA),theactivitiesthattheAuthoritycarriedoutduringtheperiodApril2012toMarch2013.Theyear2012/13istheninthsincetheAuthoritystarteditsoperations.Inthemain,thereportfocusesontheoperationalactivitiesthatwereundertakeninaccordancewiththecorrespondingyear’sBusiness
Plan.TheBusinessPlanwasinformedbythefive-year2009/10to2013/14LEAStrategicPlan.TheStrategicPlanprovidestheoverallvisionoftheAuthorityduringthefiveyearperiod.Insummary,theStrategicPlanfocusareaswereasfollows:a)theInternalProcesses;b)PublicAwareness,EducationandBranding;c)Advocacy;d)FacilitatingUniversalAccess;e)EnsuringtheSecurityofSupplyandf)HumanResourcesManagementandDevelopment.
TheinternalprocessesoftheAuthorityhavetobecontinuallyimprovedandrefinedsoastoattainimprovedservice delivery targets, and tomeet the ever changing demands of regulation. Activities under this areaincludedthedevelopmentofthelicensingandregulatoryframeworkforurbanwaterandsewerageservices,andimprovementinservicedeliveryprocessesandsystemswithintheAuthority.TheAuthority,withassistancefromtheWorldBankfunding,developedurbanwaterandsewerageservicesregulatory instruments.Thesewere theComposite License, UrbanWaterQuality of Service and Supply Standards (QoSSS),WastewaterTreatmentFacilitiesSafetyStandards,andsubsidiarylegislation.Thedocumentswereextensivelydiscussedinconsultativeworkshopswithstakeholders,particularlyWASCO.Asaresult,WASCOistentativelyscheduledtoberegulatedin2013/14.
Another key area that is indicative of the improvement in LEA’s service delivery is resolution of customercomplaintslodgedagainstelectricityservicesproviderswhentheyareescalatedtotheAuthority.
ItshouldbehighlightedthattheAuthorityaimstoensurethatcomplaintsbroughttoitareexpeditiouslyandamicablyresolved.Ishouldthereforetakethisopportunitytoemphasisethat,inthecaseofacomplaintarising
2Ntoi Rapapa (Associate Professor)Chief Executive
CHIEF EXECUTIVE’S STATEMENT - 2012/136
betweenacustomerandalicensee,thecustomershouldfirstexhaustallpossiblemeasureswithinthelicenseebeforeapproachingtheAuthorityforresolution.
Inlinewiththefocusareaofpublicawareness,educationandbranding,several initiativesweresuccessfullyundertaken.FollowingtheestablishmentofworkingrelationshipswithLEAstakeholdersinthetendistrictsofthecountryin2011/12,theAuthorityhadface-to-faceinteractionswiththestakeholdersandpublic.TheaimwastoraiseandmaintaincountrywidepublicawarenessonLEA’smandateandpromoteaccesstoregulatoryinformation.TheAuthoritysupplementedtheseeffortswiththeuseofchannelssuchasregularradioprograms,televisionpresentationsandpublicationofadvertorials inthenewspapers.Aspartofenhancinginformationdisseminationon theregulationofelectricityandurbanwaterandsewerageservices, theAuthorityheldaworkshopforthemediatoappraisethelatterontheroleoftheAuthorityintheregulationofelectricityandurbanwaterandsewerageservices.
As a socially responsible institution, LEA carried out Corporate Social Responsibility (CSR) activities at theJuvenileTrainingCentre(JTC),LerotholiPolytechnic(LP)andNationalUniversityofLesotho(NUL).Regardingadvocacy LEA participated in the regular Ministry of Energy, Meteorology and Water Affairs (MEMWA)activities,suchasHeadsoftheMinistry’sDepartmentsandofParastatalsmeetingschairedbytheHonourableMinister. Amongst others, the Ministerial meetings discussed matters pertaining to the enhancement ofMEMWA’sservicedelivery objectives.Moreover, theAuthorityheldworkshops for theESI stakeholdersonPowerQualityandTransmissionGridCodedevelopment.LEAandtheUnitedNationsEconomicCommissionforAfrica(UNECA)heldahighlevelworkshoptoprovideplatformfordiscussionondeploymentofPublic-PrivatePartnerships(PPPs)inrenewableenergy(RE)inLesothowhichwasattendedbymajorlocalandinternationalstakeholders.
Further afield, the Authority participated in meetings and training workshops organised by the RegionalElectricityRegulatorsAssociationofSouthernAfrica’s (RERA)and theAfricanForum forUtilityRegulators(AFUR).Thenewtrendamongstregionalregulatorsisthatmosthavebeentransformedfromelectricitysectortomulti-sectorregulators.AsanewmemberofEasternandSouthernAfricaWaterandSanitationRegulatorsAssociation(ESAWAS),theAuthorityparticipatedforthefirsttimeasafullmemberintheAssociation’sAnnualGeneralMeeting(AGM)andConferenceinKigali,Rwanda.Inarelateddevelopment,theAuthorityhasbeenrequestedtohostESAWAS’s7thAnnualGeneralMeetingandConferenceinOctober2013.
The issueofsecurityofsupply in thecountrycontinuedtobeanotherpriorityarea forLEA. Inaneffort topartakeinsectorwideeffortsinensuringsecuringofsupply,theAuthorityparticipatedinMinisterialactivitiestodetermineelectricitygenerationoptions.TothiseffectmeetingsonKobongpumpedstorageinitiativeandbi-lateralmeetingsbetweentheDepartmentsofEnergyofLesothoandSouthAfricaonenergycooperationmatterswereattended.Inordertoensurethatlocalstakeholderswereawareoftheimportanceoftheissuesonsecurityofsupply, the first twoof threemodules foracustomisedpowerplanningtrainingcoursewereheldforElectricitySupplyIndustry(ESI)stakeholders.Thelastonewouldbeheldin2013/14.ThepurposeofthecoursewastocapacitateMEMWA,LEA,LEC,LesothoHighlandsDevelopmentAuthority(LHDA)andtheprivatesectoronkeyissuesofpowerplanningforthecountry.
Thefacilitationoftheattainmentofuniversalaccessobjectivewasundertaken.InthisregardtheLEAElectricityConnection Charges Guidelines were finalised and duly approved. Amongst others, the Guidelines aim atensuringthatelectricitylicensees,clearlyandtransparently,definethebasisonwhichconnectionchargeswillbecalculatedandthatthereisno‘free-riding’.Allcustomershavetomakeafaircontributiontothecostofupstreamnetworksandanycross-subsidymustbeclearlyreflected.
InApril2012,theAuthorityextendedPerformanceManagementSystem(PMS)toallstaffmembers.Initially,
CHIEF EXECUTIVE’S STATEMENT - 2012/13 7
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
Transmission Grid Code
FollowingthedraftingandpreparationoftheGridCodedocument,anditssubmissiontoLesothoElectricityCompany (LEC) in2011/12, theGridCodeReviewPanelheldstakeholderworkshops todiscuss thedraftdocument. Subsequently, thePanelmet to consider commentsmadeduring the stakeholders’workshops.Itwasenvisaged that theconclusionof theGridCodewouldberealised in the following financial yearasasteptowardsthefinalisationoftheSupplyRules.TheTransmissionGridCodeismeanttoprovideclearandtransparentrequirementsfornon-discriminateaccesstotransmissioninfrastructure.
Finalisation of Electricity Regulatory and Licensing Framework
With the aim of ensuring that the grading and categorisation of electrical contractors and installerswasregulatedsoastoensuretransparency,LEAmetwithkeystakeholderssuchastheMinistryofWorks,LECandelectricalcontractorstofinalisetheprocessofdevelopingpertinentrules.AsoftheendofMarch2013,theAuthorityhadpreparedtheRulesforstakeholders’consideration.Abriefonthebackground,legalbasis,andobjectivesoftheRulesandanexecutivesummaryoftheRuleshadbeenpreparedforMinisterialbriefing.
Monitoring Licensees’ Compliance and Performance
Technicalauditsoflicensee’systemshadbeencarriedoutandpowerqualityreportshadbeenpreparedandanalysedfollowingregularpowerqualityinvestigations.Theanalysesshowedthatthepowerqualitywaswithinacceptablelimitsatall investigatedsites.InspectionofalltheLECtransmissionsubstationswasundertakenandareportwithrecommendationswaspreparedandsubmittedtoLECtoaddressissuesthatwereidentifiedtobeposing risk toLicensee’s staff, thegeneral public, theequipment itself, andcouldaffect securityandreliability of supply. The conclusion drawn from the inspectionswas that the general condition of some ofLEC’stransmissionsubstationswasnotsafetothepublicandtheCompany’spersonnel.TheAuthoritythusrecommendedthatLECshouldprepareadetailedsubstationPlannedPreventiveMaintenance(PPM)schedulewithintwo(2)monthsandprovidetheAuthoritywiththecopyofthesamesothatthelatter’sowninspectionteamcouldworkindependentlytoascertainwhetherthePPMschedulewasindeedbeingimplemented.
CHIEF EXECUTIVE’S STATEMENT - 2012/138 TECHNICAL REGULATION - ELECTRICITY - 2012/13 9
thePMShadbeenusedtoassessLEAManagementbasedontheirindividualresponsibilitiesandtimelinesasentailedintheBusinessPlan.
TheissueofrisksthatcouldjeopardisetheAuthority’sabilitytodeliveronitsmandatewasalsoplacedhighontheagenda.Asaresult, riskmitigationmeasureswerebeingconsideredandLEAstartedprocessesofdevelopingariskpolicyandstrategydocumentinthisregard.
Turningattentiontochallengesandwayforward, itmaybementionedthatanewStrategicPlanneedstobedevelopedandtheCorporateGovernanceHandbook (CGHB)hastobereviewedtoenabletheAuthoritytodeliveron itsmandatebeyond2014. In2013/14theAuthoritywillassumeurbanwaterandsewerageservicesregulationmandate.TheAuthoritywillaimto,amongstotherthings, finaliseand issuea licencetoWASCO,studytheutility’spricingmechanismsoastoeventuallyreviewthecompany’stariffs’structureandlevelsupon the latter’s future tariff reviewapplicationsubmissions.Reportingmechanisms forWASCOwillhavetobedeveloped.Issuesofaccesstowaterandsewerageservicesandawarenessonurbanwaterandsewerage services will be prioritised.Measures will be undertaken to expand the cooperation frameworkbetweentheAuthorityandotherCompetentAuthorities.
On theelectricityside, theAuthoritywill seek todevelopguidelines forPowerPurchaseAgreements (PPA)andIndependentPowerProducers(IPPs). IPPframeworkswouldbeveryuseful inpromotingprivatesectorparticipationinelectricitygenerationbusinessandcontributetoenhancedsecurityofelectricitysupplyinthecountry.Termsofreferencefortheassignmenthavebeendevelopedandsubmittedtoapotentialfinancier.ItispleasingtoinformourstakeholdersthatsimilartopreviousyearssincetheestablishmentoftheAuthority,our financial statements have been issued unqualifiedwhich is themark of theAuthority’s sound financialmanagement.
Onceagain,onbehalfoftheManagementandStaffoftheAuthority,IwouldliketoexpressmydeepgratitudeandappreciationtoallLEAstakeholders,especiallyGovernment,LicenseesandCustomersfortheirenduringgoodwillandsupporttoLEA’sendeavours,thusprovidingveryvaluableinputsintotheregulatoryprocesses.Thecontinuingprovisionofexcellentandvisionary leadershipbytheBoardofDirectorsofLEAisalsohighlycommendable.IwishalsotothankLEAManagementandsupportStafffortheirdedicationanddiligenceinperformingtheirduties.Lastbutnotleast,LEAaimstoserveallstakeholdersconsistentlywithaccountability,
professionalism,transparencyandteamworkq
N.Rapapa(Assoc.Prof.)CHIEFEXECUTIVE
Technical Regulation Electricity 3
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
TECHNICAL REGULATION - WATER - 2012/13 11TECHNICAL REGULATION - ELECTRICITY - 2012/1310
InspectionsoftheLECnetworkhaveshownthatinsomeareasthegrowthoftreesthreatenselectricitysupply.AttheendofthereportingperiodLEChadnotsubmittedthemaintenancescheduletotheAuthority.InspectionsonpartsoftheLECdistributionnetworkhadbeencarriedoutandreportsonthefindingswerebeingprepared.Inspectionswerealsoundertakenoncustomers’premisesinresponsetocustomercomplaints.
Collection of ESI Data
TheAuthorityhadcontinuedtoexploreexternal fundingsources foracountrywidesurveyontheElectricitySupplyIndustry(ESI)data.DatafromtheLicenseessuchasthatonmaximumdemandandconnectionshadbeenreceivedandanalysed.
Mini-Grids Frameworks Development
TheAuthorityasamemberoftheRegionalElectricityRegulatorsAssociationofSouthernAfrica(RERA)wasinvolvedinthedevelopmentofRegulatoryFrameworksforMiniGrids,employingtheRenewableEnergiesfortheSouthernAfricanDevelopmentCommunity (SADC)region.The initiative isanendeavourtoenhance
electricityaccesstotheruralpartsoftheregionq
The growth of trees in some areas threatens electricity supply.
Regulation of Urban Water and Sewerage Services
Inanticipationof theassumptionofurbanwaterandsewerageservicesregulation in2013/14,somekeyoperationaldocumentswerebeingfinalised.Inthereportingperiodthefollowinginstrumentsweredeveloped:
1.UrbanWaterQualityofServiceandSupplyStandards(QoSSS)
TheQoSSSdocumentaddressesbothserviceandsupplyqualityaspects.Withregardtoqualityofservice,thedocumentamongstotherthings,addressesissuessuchastimeframesforWASCOtoprovidecustomerservices requests including quotations and supply, faults’ handling, water account queries and customercomplaints handling. The standards provide detailed measures that WASCO has to take to ensure thatcustomersgetquality service.Thequalityof supply standardsset theparametersof thequalityofpotablewaterthattheutilitymustadhereto.
2.WaterandSewageTreatmentFacilitiesSafetyStandards
Thestandardsare tobeapplied to theoperationandmaintenanceofallwaterandwastewater treatmentfacilitiesoperatedbythelicensee.Thelicenseeshouldadaptthesestandardstotheoperationofanyparticularfacilitieswherever it isnecessary. Theobjectivesof thesafetystandardsare toavertaccidentsonurbanwaterandwastewatertreatmentplants,tomitigatehealthriskstoworkersandtoensuretheprotectionoftheenvironment.
Consultative Processes on Development of Water Regulation Instruments
Duringtheyear,theAuthorityheldseveralconsultativemeetingswithkeystakeholders;namely,GovernmentDepartments,WASCO,NGOs,industriesandbusinessrepresentatives,themediaandothers,todiscussthemodalitiesofurbanwaterandsewerageservicesregulationandpresentationsofthepertinentdocumentswasmade.Theimplementationoftheregulatoryinstrumentsrequirescontinuousdevelopmentandstrengtheningofapplicableskillswithrespecttowaterregulation.Inthisregard,theWorldBankandtheGovernmenthavecommittedtoassistingLEWAwithcontinuedcapacitybuildinggearedtowardsimplementationoftheregulatory
instrumentsandannualperformanceassessmentofWASCOq
Technical Regulation Water 4
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
ECONOMIC REGULATION - 2012/13 13TECHNICAL REGULATION - WATER - 2012/1312
One of the final workshops wherein the Authority and WASCO discussed issues pertaining to regulation of urban water and sewerage services.
Electricity Prices for 2012/13
TheLesothoElectricityAuthority(LEA)receivedatariffreviewapplicationfromtheLesothoElectricityCompany(LEC)requestinganannualpriceincreaseof25%onenergychargesand27%onmaximumdemandchargesfor the 2012/13 financial year. LEC requested to be allowed a revenue requirement ofM547.6million.AfterLEAhadsoughtclarificationsontheapplication,LECmodifiedtheapplicationaccordingly.Intherevisedapplication,LEC’srevenuerequirementwasM550million.
Apublicnoticewasissuedforstakeholderstomakecommentsandinputsasrequiredbythelaw.CommentswerereceivedfromConsumerProtectionAssociation(CPA),LargeIndustrialCustomers(HuminJeanswear(Pty) Ltd and CGM Group), Forum of Electrical Practitioners Industry (FEPI), Queen ‘MamohatoMemorialHospital, Lesotho Textile ExportersAssociation (LTEA), BakersAssociation of Lesotho (BAL) andDomesticCustomers.ApublicconsultationsessionwasheldwhererepresentativesofFORMOSA,FEPI,LesothoChamberofCommerceandIndustry(LCCI)andCPAmadepresentations.
Subsequently,theLEABoardapprovedLEC’srevenuerequirementofM473.7millionfor2012/13resultingintheapprovedtariffsreflectedinthetables1and2below.Thetariffsexcludeda5%ValueAddedTax(VAT).
Economic Regulation Department 5
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
ECONOMIC REGULATION - 2012/1314 ECONOMIC REGULATION - 2012/13 15
1. The National Energy Regulator of South Africa (NERSA) had already indicated in June 2008, when it approved Eskom’s tariffs for 2008/09, that subsequent tariff increases would be between 20% and 25% annually.
Customer Categories
Industrial. HV
Industrial. LV
Commercial. HV
Commercial. LV
Old Maximum Demand Charges (M/kVA)
150.0586
175.2732
150.0586
175.2732
Approved Percentage Change
9.7%
9.7%
9.7%
9.7%
Table 2: Approved LEC Maximum Demand (MD) Maximum Demand for 2012/13 by the LEA Board
Approved Maximum Demand Charges
(M/kVA)
164.61428
192.27470
164.61428
192.27470The figures in the two tables above exclude 5% VAT.
Customer
Categories
Industrial HV
Industrial LV
Commercial HV
Commercial LV
General Purpose
Domestic
Street Lighting
Approved
Energy
Charges
(M/kWh)
0.1169
0.1294
0.1169
0.1294
0.9555
0.8453
0.4799
Old
Energy
Charges
(MkWh)
0.1083
0.1199
0.1083
0.1199
0.8855
0.7834
0.4448
Adding
Customer
Levy @
M0.0213/kWh1
0.1399
0.1524
0.1399
0.1524
0.9785
0.8683
0.5029
Adding Rural Electrification
Levy @M0.02/kWh for large
customers and @M0.035/
kWh for others (M/kWh)2
0.1599
0.1724
0.1599
0.1724
1.0135
0.9033
0.5379
Final Approved
Energy Charges
including levies
(M/kWh)
0.1599
0.1724
0.1599
0.1724
1.0135
0.9033
0.5379
Table 1: Approved LEC Energy Charges for 2012/13 by the LEA Board
Old Energy
Charges
including
levies (M/
kWh)
0.1496
0.1612
0.1496
0.1612
0.9418
0.8397
0.5011
Final Tariff
Percentage
increases
6.9%
6.9%
6.9%
6.9%
7.6%
7.6%
7.4%
Figures1and2belowillustratetheannualelectricitytariffincreasesfrom2007/08to2012/13.
1ThecustomerlevyisapprovedbytheMinisteroftheMinistryofEnergy,MetereologyandWaterAffairs(MEMWA).2TheruralelectrificationlevyismeanttoincreaseaccesstoelectricityandisalsoapprovedbytheMinister-MEMWA
Figure1above, illustratesthat from2007/08to2012/13energytariffs increasedfromM0.0740/kWhtoM0.1599/kWh for industrial and commercialHV and fromM0.0819/kWh toM0.1724/kWh for industrialandcommercial LVcustomers, respectively.General purposeenergy tariff increased fromM0.6800/kWh toM1.0135/kWh in six years while energy tariffs for domestic customers increased fromM0.4900/kWh toM0.9033/kWhduringthesameperiod.Onaverage,domestic,industrialandcommercial,andgeneralpurposecustomers’energytariffsincreasedby5.2%,12.2%and1.2%,respectivelyaboveaverageinflationrateduringtheperiod2007/08to2012/13.EnergytariffsforstreetlightingincreasedfromM0.2690/kWhtoM0.5379/kWhand,onaverage,thisconstitutesabove10%increaseinrealtermsfortheperiodofsixyears.
2007 / 2008 2008 / 2009 2009 / 2010 2010 / 2011 2011 / 202
Industrial HV
Industrial LV
Commercial HV
Commercial LV
Mal
oti/k
Vh
200.0000
180.0000
160.0000
140.0000
120.0000
100.0000
80.0000
60.0000
40.0000
20.0000
0.0000
Figure 2 Annual Maximum Demand Charges
Years
2012 / 2013
Figure 1 Annual Energy Charges
0.8000
0.6000
0.4000
0.2000
0.0000
Mal
oti/k
Wh
1.0000
Customer Categories
Indus
trial H
V
Indus
trial L
V
Comm
ercia
l HV
Comm
ercia
l LV
Gene
ral P
urpo
se
Dome
stic
Stre
et Lig
hting
2007 / 2008
2008 / 2009
2009 / 2010
2010 / 2011
2011 / 2012
2012 / 2013
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
ECONOMIC REGULATION - 2012/13 17ECONOMIC REGULATION - 2012/1316
Figure2aboveillustratesthatmaximumdemandchargesforlargecustomersincreasedfromM123.3180/kVA to M164.6143/kVA for HV and from M123.9690/kVA to M192.2747/kVA for LV customers,respectively.Onaverage,highvoltagecustomers’maximumdemandchargesincreasewasslightlybelowtheaverageinflationratewhilelowvoltagewas1.2%aboveinflationfortheperiod200708to2012/13.
Theincreaseshavemainlybeenduetoincreasedbulksupply,operatingandmaintenancecostsforLEC.
A representative of the Lesotho Chamber of Commerce and Industry (LCCI) Mr. Steven Monyamane makes a presentation before LEA Board, LEC and the Public during the 2012/13 electricity prices consultations at Lehakoe Recreational club.
Regulatory Documents
TheAuthoritydevelopedandapprovedthefollowingguidelinesandprinciples,whichbecameeffectivefrom01September2012:
(a)LesothoElectricityandWater(LEWA)ChargingPrinciplesforElectricityandWaterandSewerage
TheChargingPrinciplesprovidethebasisforallowedrevenueandhowfixedassets(dependingonhowtheyhavebeenfinanced)aretobetreatedbytheAuthority intariffreviews.ThePrinciplesalsooblige licenseesto justify the reasonablenessofcostsandprovideguidanceonhowreasonablenessofcosts incalculatingrequiredrevenuecanbereviewed.ThePrinciplesprovidehowfixedassetsshouldbetreatedintariffreviewandtheapplicablerateofreturn.TheLicenseesarefurtherguidedonhowtheyshoulddealwithforecastsandout-turnadjustmentsandauditeddataintariffsubmission.Finally,thelicenseesareprovidedwithguidanceinthe
designoftariffs,inthattariffs,totheextentpossible,reflectcostsofprovidingserviceandshallnotdiscriminatebylocationofusersorgenerators.
(b)LesothoElectricityAuthority(LEA)ElectricityConnectionChargesGuidelines
TheAuthoritydevelopedandapprovedElectricityandConnectionChargesGuidelines.ThemainobjectivesoftheGuidelinesareto:-
1. Set a standard methodology for determining connection charges for transmission and distributioncustomersinthecountry;
2. Describethetechnicalrequirementsandarrangementsfortheconnection;and
3. Provideagovernancestructuretodealwithfuturedevelopments.This includesaresolutionprocesstodealwithdisputesrelatingtoconnectionarrangementsandcharges.
The Electricity Connection Charges Guidelines are meant to ensure that electricity licensees, clearly andtransparently,definethebasisonwhichconnectionchargesarecalculatedandthatthereisno‘free-riding’andthatallcustomersmakeafaircontributiontothecostofupstreamnetworkandanycross-subsidyisclearlyreflected.
Finally, the Connection Guidelines require the electricity licensees to design connection charges based on‘shallow’ approach’ as opposed to ‘deep approach’. Under the shallow approach, the customers are onlyrequiredtopaydedicatedcostsofconnectionswhile inthe later,thecustomersarerequiredtopayallthecostsassociatedwiththeconnection,includingupstreamnetworkreinforcements,ifany.
Theshallowapproachislikelytoencouragemoreconnectionsandreduceincidenceswherecustomersrequire
connectionrefundsq
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
LEGAL SERVICES- 2012/1318 LEGAL SERVICES- 2012/13 19
Regulatory Framework for Urban Water Supply and Sewerage Services
Oneof themain focusareasof theAuthoritywastodevelopsubsidiary legislation forwaterandsewerageservicesregulationandacompositelicenceforWASCO.Aftertheengagementofaconsultantandintensiveconsultations with key stakeholders such as Commissioner of Water, Ministries of Environment, Health,MEMWA,WASCO(Pty)LtdandtheDepartmentofRuralWaterSupply(DRWS),therewasahugeprogressregardingcompletionoftheabovementionedactivity.
RegulationsandRulesdealingwithLicenseFeesandCustomerLeviesandCustomerComplaintsResolutionforUrbanWaterandSewerageServiceswerefinalisedandtheywerependingpublication.
Regulatory Compliance
CompliancebyregulatedentitieshasconsistentlybeenachallengethattheAuthorityhasfacedsinceinceptionofregulationoftheelectricitysector.Asanexample,itmaybepointedoutthatsomeoftheobligationsofLECincludereportingon issuessuchasavailabilityofresources,regulatoryaccounts, informationprovisionandpreparationofcodesofpracticewithintimelinessetbytheLicenceandprovisionofdatasuchasonelectricitymaximumdemand.LEChasbeenlessthanforthcomingwithregardtoreportingonprogressregardingtheseissues.BoththeLesothoHighlandsDevelopmentAuthority(LHDA)andtheRuralElectrificationUnit(REU)haveimprovedtheirreportingandtheAuthorityisoftheviewthatiftheycouldsustainandimprovefurther,theywouldeventuallyfullyobligewiththeregulatoryreportingrequirements.
Toaddressthecontinuednon-compliance,thelicenseeswereengagedatvariouslevelssuchasworkshopsandmeetingsandrevisionofthereportingforms.TheAuthorityshallcontinuetoengageLEC,LHDAandREUtoensurethatregularreportingonESIdataisadheredto,soastoinculcateacultureofadherencetotheprescriptsofregulation.
BoardActivities
TheBoardconsistsofseven(7)non-executivemembersandtheChiefExecutivewhoisanex-officiomember.Duringthereportingperiod,theBoardheldatotalofeight(8)meetings,ofwhichfour(4)wereordinaryand
Legal Services Department 6
another four (4)extra-ordinary.TheBoardMembers’attendanceof themeetingsheldunder thereportingperiod is reflected below in table 3. TheManager – Legal Services provides the secretarial services forthe Board. Amongst others, the Board considered various regulatory and administrative instruments thatincludedtheAuthority’sBusinessPlanfor2013/14,LesothoElectricityandWaterAuthority(LEWA)ChargingPrinciples forElectricityandWaterandSewerage,LesothoElectricityAuthority (LEA)ElectricityConnectionChargesGuidelines,extensionofalicenceexemptionfortheREUElectricityAccessPilotProjects(EAPPs)andregulatoryinstrumentsforurbanwaterandsewerageservices.
TheBoardhasfour(4)Committeeswhichassistindischargingitsresponsibilities.AlltheCommitteesconsistofnon-executivememberswhoarealsothemembersoftheBoard,excepttheAuditCommitteewhichhasonenon-executivememberwhoisnotaMemberoftheBoard.TheCommitteesmetduringthereportingperiodto discharge their fiduciary duties and responsibilities as set out in their respective committees’ terms ofreference.TheChiefExecutiveandManagersattendthecommitteemeetingsbyinvitationandhavenovotingrights.TheattendanceoftheCommitteemeetingsheldduringtheperiodunderreviewisreflectedintable4below.
Prof. F. L. Moloi (Chairperson)
Dr. M. Kotelo-‘Molaoa
Mr. R. Motlojoa
Mrs. M. Maliehe
Dr. M. Matete
Adv. K. Mohau
Dr. L. Thamae
Assoc. Prof. N. Rapapa (Chief Executive)
4/4
4/4
3/4
4/4
3/4
3/4
4/4
4/4
Table 3: The Board Members’ Attendance of the Meetings during 2012/13
Members Meetings (attended/total held)Ordinary Meetings Extra-Ordinary Meetings
4/4
3/4
3/4
4/4
1/4
4/4
4/4
4/4
Audit
Customer Services
Human Resource, Finance and Administration
Pricing and Tariffs Committee
Mrs. Maliehe (Chairperson)
Mr. R. Motlojoa
Dr. L. Thamae
Mr. M. Taole (External Member)
Prof. F. L. Moloi (Chairperson)
Dr. M. Kotelo-‘Molaoa
Adv. K. Mohau
Mr. R. Motlojoa (Chairperson)
Dr. M. Matete
Adv. K. Mohau
Dr. M. Matete (Chairperson)
Mrs. M. Maliehe
Dr. M. Kotelo-‘Molaoa
Dr. L. Thamae
Table 4: The Committees’ Members Attendance of the Meetings during 2012/13
Committee Members Meetings (attended/total held)
3/3
3/3
3/3
3/3
5/5
4/5
5/5
4/4
2/4
4/4
3/3
3/3
1/3
3/3
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
Public Awareness
TheAuthority continuedwith endeavours toattain sustainable empowermentof stakeholders in regulationof electricity and urban water and sewerage services. To this end, various efforts at communicating withthepublicusingdifferentmeanssuchas electronicandprintmediawereundertaken.Atotalof21radioprogrammeswereheldduringthereportingperiod.Mainly,thebroadcastsaimedtoinformthepublicabouttheAuthority’simpendingassumptionofregulationofurbanwaterandsewerageservices,andelectricityqualityofserviceissues.OtherbroadcastthemesincludedLECtariffadjustmentapplicationandpublicconsultationsfor2012/13andLEA’scurrentmandate.PressreleasesonLEC’sapplicationfor2012/13tariffreviewanditsdeterminationwereissued.Publicnoticeswerebroadcastonelectronicmediaandpublishedonprintmedia.LEWAnoticesweredisplayedonDistrictAdministrators’offices.Plannedcommunication interventionssuchaspublicmeetingswereheldwithstakeholders.SuchmeetingswereheldinButha-Buthe,Berea,Mohale’sHoek,Quthing,MafetengandThaba-Tsekatowns.Topicsdiscussedwith the public therein included, the importance of public participation in regulatory processes, ElectricityConnectionChargesGuidelinesandLEA’sassumptionofregulationofurbanwaterandsewerageservices.
LEAwebsitecontentwasregularlyupdatedandpublicnotices,advertisementsandvacancieswere furtherpostedonthemedium.Intheinterim,aprototypeLEWAwebsitewasdesignedandpopulatedwiththerelevantinformation.Topromoteciviceducationonregulation,twoadvertorialsontransformationofLEAtoamultisectorregulatorwerepublishedinnewspapers.OrganisationalbrochuresandotherpromotionalmaterialswereusedtobrandLEAatvariouseventssuchastheRERAAGMandstakeholderworkshopsinthecountry.
TwomeetingswereheldwithdistrictcouncillorsinQuthingandThaba-Tsekaaftergeneralpublicmeetingshadbeenheldinthetwodistricts.
Customer Affairs Department 7
CUSTOMER AFFAIRS- 2012/13 21CUSTOMER AFFAIRS- 2012/1320
LEA officials discuss issues of electricity and water services provision by regulated utilities with the public in Teyateyaneng.
Outreach Activities
InordertoformalisetheworkingrelationshipbetweenLEAandDistrictAdministrators(DAs),aMemorandumof Understanding (MOU) was prepared and sent to offices of the Principal Secretary –Ministry of LocalGovernmentandChieftainshipandtheDAsoffices forconsideration.Theefforts toestablishthe linkswithstakeholdersthroughtheDAsofficeswasalsoboostedwhendistrictcontactspointswereappointedinThaba-Tseka,Mohale’sHoek,Mafeteng,Maseru,Quthing,Berea,Butha-ButheandQacha’sNekdistricts.ThecontactpointsliaisedwithLEAonavarietyofregulatoryissuessuchascomplaintshandlingandpublicitysurroundingregulatoryissues.
Customer Complaints
Thetotalnumberofcomplaintsreceivedwithinthereportingperiodwas24.Ofthese,21wereresolvedandthreewerependingresolution.Abreakdownofthecomplaintsshowsthat60%ofcomplaintswereonwayleaveissues,30%onservicedeliverywhile10%wereabouthighquotations.Thepercentageofresolvedcomplaintsduringtheyearwas87.5%comparedwith70%ofcomplaintsresolvedin2011/12and50%in2010/11.ThiswaslargelyaresultofenhancedresolutionmechanismsdevelopedandimplementedbyLEA.
Figure3 above reflects a positive trend in that the annual relative number of complaints unresolved from2010/2011to2012/13hasbeendecliningandthisisconsistentwiththeAuthority’sgoalofensuringthat
allthecomplaintsareresolvedontimeq
Received complaints Resolved complaints Pending complaints
2010 - 2011
2011 - 2012
2012 - 2013
30
20
10
0
Figure 3: Synoptic Complaints Summary 2010/11-2012/13
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
FINANCE, HUMAN RESOURCES & ADMINISTRATION - 2012/1322 FINANCE, HUMAN RESOURCES & ADMINISTRATION - 2012/13 23
FINANCE
Operating Budget
TheAuthority’s budget for2012/13was financed through licence fees, customer levies and contributionfromtheWorldBank.TheWorldBank’scontributionwasusedtofinancecapacitybuildingactivitiesforwaterregulation,partofstaffcostsandthecostsforthedevelopmentofthelegalandregulatoryinstrumentsforurbanwaterandsewerageservicesregulation.
TheBusinessPlantogetherwiththeBudgetfor2013/14werepreparedandapproved.SimilartotheBudgetfor2012/13,theBudgetfor2013/14istobefinancedbytheLicencefees,CustomerLeviesandGrantsfromcooperatingpartners.
Universal Access Fund (UAF)
TheAuthoritydevelopedaprocedure fordisbursementsofUAF fundsand theobjectivesof theprocedure,amongstothers,aretoensureUAFfundsareusedinaccordancewithLEA’sFinancialStandingOrdersandestablishresponsibilities forensuringcompliancewithLesothoElectricityAuthority (UniversalAccessFund)Rules,2011.TheapprovedUAFbudget for electrificationwasM8,750,997.00 for thereportingperiod.However,nodisbursementsweremadeinthereportingyearunderUAFbudgetastherewerenoelectrificationprojectsundertakenwiththeexceptionofthepaymentofabalancebroughtforwardfrom2011/12projectforHaRafolatsaneandtheretentionfees.
Financial Statements and Management
The2011/12Financial Statements of theAuthoritywere audited andwere publishedas part of the LEAAnnualReportfor2011/12.
Monthlyreportsonstatusoffundsandexpenditurewerepreparedintheperiodunderreview.LEAaccountswerecontinuallyreconciledduringthe2012/13financialyear.
Finance, Human Resources & Administration Department 8
HUMAN RESOURCES
Staff Appointments
TheAuthority’sstaffcomplimentincreasedasaresultofaneedforafullyfunctionalhumanresourcesoffice.Inthisregardafulltimehumanresourcespositionwasestablishedandfilledaccordingly.
Training
AlllevelsofstaffunderwenttraininginlinewiththeLEATrainingPlan.ThetrainingwasonareassuchasPublic-Private Partnership for Infrastructure, ContractsDispute Resolution, Renewable Energy Policy, TechnologyStandardisationandDraftingOfStandards,WiringCode (SouthAfricanNationalStandard10142),PowerPlanning,CorporateGovernance,ManagingPowerSectorReformandRegulation,PowerPurchaseAgreement-allofwhicharecriticaltocapacitybuildingincoreregulatoryfunctions.SupportstaffalsoundertooktrainingonareassuchasTalentAttraction,DevelopmentandManagement,EffectiveBusinessReportWritingandReception and Frontline Skills. In order to ensure staff’s continuous professional development (CPD) theAuthorityfacilitatedtheregistrationofstaffandrenewalofmembershipwithvariousprofessionalbodies.
Performance Management System (PMS)
ThePMSforassessingworkperformanceofallLEAstaffwasrolledouttocoverperformanceofallemployees.Theaimofthesystemistoenhanceemployees’productivity,rewardgoodperformanceanddesiredbehaviourandattitudetowardswork.
Staff Wellness, Safety and Health
Inordertopromotewelfareandmoraleofitsemployees,theAuthorityintroducedawellnessprogramthatcovers thehealth, safety,HIVandAIDSwellness aspects of employees. Thepurposeof the program is toestablishaworkenvironment thatpromoteshealthy lifestyles,decreasetheriskofdiseasespread,reduceworkplaceaccidentsandenhancethequalityofemployees’life.
ADMINISTRATION
Acquirement of Office Space
EffortstoacquireofficespaceforalltheemployeesweresuccessfulinthatLEAobtainedanofficespaceonMoposoBuilding7thfloorwhereallstaffwouldbeaccommodatedinthe2013/14financialyear.Relocation
processeshadbegunattheendofMarch2013q
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
TheAuthoritycontinued itscooperation initiativeswithvarious internationalandregionalbodies inorder toenhanceitscapacityinregulatingboththeelectricitysectorandurbanwaterandsewerageservices.OfthesetheReporthasmadeafewhighlights.
AFUR
AsmemberofthepanAfricanumbrellautilitiesregulatoryassociation,AfricanForumUtility forRegulators(AFUR),theAuthoritytookpartinAFUR’seventssuchastheAFUR’sConferenceandAnnualGeneralMeeting(AGM)inApril2012whichwasheldinJohannesburg,SouthAfrica.
ESAWAS
FollowingformaladmissiontothebodyLEAtookpartintheEasternandSouthernAfricaWaterandSanitationRegulatorsAssociation(ESAWAS)AGMandConferenceinSeptember2012(previouslyLEAwasanobserver).TheinitiativeofjoiningESAWASwasinanticipationofimpendingassumptionofregulationofurbanandwaterandsewerageservices.
RERA
The Authority continued participating in various meetings and consultations of portfolio committee andsubcommittee levelsofRegionalElectricityRegulatorsAssociationofSouthernAfrica (RERA) in2012/13.InNovember2012,LEAparticipatedinRERA’sConference,AGMand10thAnniversaryheldatAssociation’sheadquartersinWindhoek,Namibia.RERAalsoorganisedseveraltrainingeventswhichwereattendedbyLEAstaff.
InJuly2012LEAbecameoneoftheRERAmembersthatparticipatedintheAfricanElectricityRegulatorPeerReviewandLearningNetworkPhaseIIexercisesponsoredbytheUniversityofCapeTown(UCT)andorganisedundertheauspicesofRERA.UnderthisexerciseRERAmemberregulatorsengageinapeerreviewprocessinvolvingmembersinvariousregulatoryaspectssuchasregulatorygovernance,licensing,impact,tariffsetting,customercomplaintshandlingmechanismsandregulatoryimpact.
Cooperation with Regional & International Bodies 9
COOPERATION WITH REGIONAL & INTERNATIONAL BODIES - 2012/1324
LEA Chief Executive Associate Professor Ntoi Rapapa addresses delegates at the 10th RERA summit in Windhoek in November 2012.
TheAuthorityrevieweddocumentsonRERAbestpracticeinregulationtoensurethatLEAasamemberofRERAcontributedtotheeffortsaimedat fosteringandadoptionofworldclassregulatorystandards intheregion.
ICER
TheAuthoritysharedinformationwithotherInternationalConfederationofEnergyRegulators(ICER)membersonbestpracticeandphilosophyinregulationofenergysector.Furthermore,documentationandcorrespondencehasbeenexchangedbetweentheAuthorityandICER.
UNECA
In April 2012, United Nations Economic Commission for Africa (UNECA) in collaboration with LEA held aworkshoptoprovideplatformfordiscussionondeploymentofPPPsinrenewableenergy(RE)inLesotho.TheworkshopwasoneofthehighlevelstakeholdereventsthathaveunderscoredthecardinalroleoftheAuthorityinfacilitatingPPPsimplementationinLesotho’senergysector,inlinewiththecurrentneedtoaddressissuesaround security of supply in the country. Once policy issues have been addressed at the higher level the
regulatoryframeworkandimplementationofPPPsinREintheenergysectorwouldberealisedq
COOPERATION WITH REGIONAL & INTERNATIONAL BODIES - 2012/13 25
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
Licensees’ Performance
Section21(1)(i)oftheLEAActmandatestheAuthoritytoensurethecollection,publicationanddisseminationof information relating to standards of performance by licensed operators and on the electricity sector inLesotho for use by the industry, consumers and prospective investors. It is on the basis of this, that theperformanceoftheLEA’slicenseesisreportedhere.MindfulofitsreportingrequirementsasoutlinedintheAct, theLEApreparedandagreedreporting formatswith its licensees (LECandLHDA-‘MuelaHydropowerPlant).Thelicenseesarethusexpectedtoreportaspertheagreedformats.
However,asmentionedpreviouslytheLicenseescontinuedtoprovideLEAwithincompletedataatirregularintervals.
Lesotho Electricity Company (LEC)
LECholdsaCompositeLicenseforTransmissionandDistribution&SupplyissuedbyLEAinDecember2006.
(a)DemandGrowth
LECenergysalesgrewby24GWh(3.7%),from656GWhin2011/12to680GWhinthereportingperiod.TheLECtotalsystempeakdemandgrewfrom141.69to147.63MW,anincreaseof4.2%inthereportingperiod.
(b)Electrification
Atotalof16,149newconnectionsweremadeinthereportingyear,areductionof6,326whichisa28.1%decrease from last year’s figureof22,475. Thenewconnections increased theLECcustomerbase from128,583to144,732ofwhich135,513isdomestic.Usinghouseholdstatisticsfromthenationalcensusandhouseholdsurveyof2006,thistranslatestoabout30.2%ofLesothohouseholdsconnectedtogridelectricity.Ifthisconnectionrateismaintainedforthenexttwofinancialyears,theGovernment’stargetof35%householdsconnectedtoelectricityby2015wouldbemet.
Electricity Sector Developments 10
ELECTRICITY SECTOR DEVELOPMENTS - 2012/1326 ELECTRICITY SECTOR DEVELOPMENTS - 2012/13 27
(c)SystemAvailability
Themonthlysystemavailabilityforbothtransmissionanddistributionsystemsaredepictedgraphicallyinthefigure4belowassetagainsttherespectivecorporatetargetlevels.
Thetransmissionsystemavailabilityhasbeenconsistentlyabovetarget forthewholereportingperiod.Theaveragesystemavailabilityfortheyearwas99.92%againstthetargetannualaverageof99.00%.
Similarly,theavailabilityofthedistributionsystemwasabovetarget,withanaverageof99.66%againstanaveragetargetof95.00%perannum.
Lesotho Highlands Development Authority (‘Muela)
LHDAholdsaGenerationLicenceissuedbyLEAinDecember2006.
(a)ElectricitySales
The‘Muelahydropowerplant(MHP)producedatotalenergyof461GWh,adeficitof1.3%fromtheplannedgenerationof467GWh.ThisinsufficiencywasmainlyduetoaplannedoutageinOctoberandNovember2012asaresultof‘Mueladeliverytunnelinspection.Ofthissentoutenergy,444.68GWhwassoldtoLECyielding‘MuelatotalrevenueofM50.55million,resultinginanaveragesellingpriceofM0.11/kWh.Theremaining14GWhwasexportedtoEskomatanaveragepriceofM0.19/kWh.Apeakpowerdemandof80.45MWwasproducedbyMHPduringthereportingperiod.
Source: LEC
Transmission
Distribution
Target Transmission
Target Distribution
Apr-12
99.97%
99.55%
99%
95%
May-12
99.96%
99.76%
99%
95%
Jun-12
99.97%
99.75%
99%
95%
Jul-12
99.96%
99.78%
99%
95%
Aug-12
99.88%
99.69%
99%
95%
Sep-12
99.98%
99.00%
99%
95%
Oct-12
99.94%
99.64%
99%
95%
Nov-12
99.90%
99.73%
99%
95%
Dec-12
99.89%
99.90%
99%
95%
Jan-13
99.90%
99.89%
99%
95%
Feb-13
99.89%
99.61%
99%
95%
Mar-13
99.85%
99.63%
99%
95%
Apr-12
100.00%
99.00%
98.00%
97.00%
96.00%
95.00%
94.00%
Jun-12 Aug-12 Oct-12 Dec-12 Feb-13
Availability
ELECTRICITY SECTOR DEVELOPMENTS - 2012/1328
Review of Limkokwing Programmes Draft Final Report
ELECTRICITY SECTOR DEVELOPMENTS - 2012/13 29
Review of Limkokwing Programmes Draft Final Report
(b)PowerPlant’sTechnicalPerformance
Thetechnicalperformanceofpowerplantsismeasuredbyanumberofparameters,mostofwhichareratios.Theratiosareindicatorsofhowwellaplantisutilised,operatedandmaintained.SomeoftheindicatorsthathavebeenselectedandagreedfortheperformanceofMHParethefollowing:
Monthly Indicators
Themonthlyindicatorshavebeenselectedtomeasuretheperformanceoftheplantasawhole.
Load Factor (LF) –Theratiooftheactualenergyproducedtotheenergythatwouldhavebeenproducediftheplanthadrunatmaximumdemandoverthesamemonth.Itisalsoexpressedastheratiooftheaveragedemandtothemaximumdemand.
Operating Factor (OF) –Theratioofthetimeduringwhichtheplantwasoperationaltothetotaltime inamonth.
Annual Indicators
Theannualindicatorshavebeenselectedtomeasuretheperformanceoftheindividualunits.
Unit Capacity Factor (CF) –The ratio of the actual energy produced to the energy thatwould have beenproducediftheplanthadrunatratedpoweroverthesameyear.
Energy Availability Factor (EAF)-Theratiooftheenergythattheavailablecapacitycouldhaveproducedtotheenergythatthereference(rated)unitpowercouldhaveproducedduringthesameyear.Theenergythattheavailablecapacitycouldhaveproducedisequaltothereferenceenergyminusalltheplannedandunplanned(withinandoutsideplantmanagementcontrol)losses.
Unit Capability Factor (UCF)-Theratiooftheavailableenergygenerationtothereferenceenergygenerationoverthesameyear.Theavailableenergyinthiscaseislimitedtolosseswithinplantmanagementcontrol.
Planned Capability Loss Factor (PCLF)–Ratioofplannedenergylossestothereferenceenergy.
Unplanned Capability Loss Factor (UCLF) – Ratio of unplanned energy losses (under plantmanagementcontrol)tothereferenceenergy.
TheperformanceofMHPinthereportingperiodisgivenbelowbythegraphicalrepresentationsofthemonthlyindicators (LFandOF) in figure4and the tabulationof theannual indicators in table3.The indicatorsareexpressedinpercentages.Figure4showsthatthepatternofthetwoindicatorsisalmostidentical.Thisgoestoexplainthattheplantoperatedatitsavailablepeakcapacity,itsmaximumcapacityinthiscase,withalmostnointerruptionfortheperiodApriltoSeptember2012.However,glaringfromfigure4isanabsoluteinterruptionofplantfortheperiodOctobertoNovember2012.Thiswasduetoinspectionandmaintenanceofthewatertransfertunnelfrom‘MuelatotheRepublicofSouthAfrica.Fromtable3itisobservedthatperformanceofunits2and3issimilarwiththeexceptionthatunit2’sCFisslightlylowerat72.9%.Unit1wastheleastavailableofthethreeunitsasdepictedbyrelativelylowervaluesfor,EAFandUCFandacorrespondinglyrelativelyhighervalueforPCLF.TheUCLFisslightlyabovezeroforallunitsandthisissobecauseoflownumberofoutagesthatarereportedasoutsideplantmanagementcontrol.
AccidentsandNumberofUndesiredEnvironmentalIncidents.Inthereportingperiodtheyrecordedzero(0)inalltheperformanceindicators.
(c)SafetyandEnvironmentalIncidents
Thepertinentperformance indicatorsthat ‘Muelauses forassessingtheirperformance inthisregardare:Industrial Safety Accident rate per 1,000,000 man-hours, Number of Vehicle Accidents and Number ofUndesiredEnvironmental Incidents. In the reportingperiodLHDArecorded zero (0) inall theperformanceindicators.
Unit
Identifier
Unit 1
Unit 2
Unit 3
Energy
Availability
Factor (EAF)
69.6
80.5
79.5
Capacity
Factor
(CF
87.5
72.9
94.3
Unit
Capability
Factor (UCF)
78.2
82.9
82.8
Unplanned
Capability Loss
Factor (UCLF)
0.2
0.0
0.1
Table 3: Performance of MHP Units in 2012/13 – Ratios Expressed in Percentages
Planned
Capability Loss
Factor (PCLF)
21.65
17.05
17.09
Source: LHDA Reports
120.00
100.00
80.00
60.00
40.00
20.00
0.00
April
Mar
ch
Febr
uary
Janu
ary
Dec
embe
r
Nov
embe
r
Oct
ober
Sept
embe
r
Augu
st
July
June
May
LFActual OF
Figure 4: MHP Load and Operating Factors (Percentages) for 2012/13
Source: LHDA Reports
Planned OF
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
FINANCIAL STATEMENTS - 2012/13 31FINANCIAL STATEMENTS - 2012/1330
Department of Energy (Rural Electrification Unit)
TheDepartment of Energy has held a license exemption for running three electricity access pilot projects(EAPPs)sinceOctober2007.Theexemption,whichexpiredinSeptember2012,hadbeenfurtherextendeduntilSeptember30,2014.TheDepartmentwasfurtherissuedanexemptionthatwouldexpirein2014,forthe33kVHaMpiti–HaSekakelineandtheassociateddistributionandsupplynetworks.
(a)ElectrificationAccessPilotprojects(EAPPs)
i.Qholaqhoe
TheQholaqhoeEAPP isconnectedtotheLECnetwork.Atotalof253customerswasrecordedduringthereportingyear,an increasebyone(1)customeroverthepreviousreporting figure.Non-paymentofbillsbycustomersremainedamajorchallenge.
ii.Dilli-Dilli/Sixondo
TheDilli-Dilli/SixondoEAPPisconnectedtoEskom(RepublicofSouthAfrica)network.Atotalnumberof276customerswasrecordedduringthereportingyear,a25%increaseoverthepreviousyear’sfigure.Theflatratemeterswhichdidnotaccumulateelectricityunitsremainedamajordissatisfactionofthecustomers.Eskomhadfourplannedoutagestoundertakepreventivemaintenanceonthenetworkandeachlastedforaboutaday.
iii.HaMpiti-HaSekakeEAPPTheHaMpiti-HaSekakeEAPP isconnectedtoLECnetwork.Thevendingsystemwas in fulloperationandtamperresetsoftwarehadbeensecuredandthetamperedmetershadbeenrestoredbacktoservice.
Electricity theftwas the highest contributor to non technical electricity losses during the reporting period.Tocurbit,regularinspectionswereundertakenbyREUandthecontactor(LSP)tocheckifthemetershadbeenbypassedornot.About220outstandinghouseholdsatTebellonghadbeenelectrifiedbytheendofthereportingperiod.Thisincreasedthetotalnumberofhouseholdconnectedundertheprojectto1,927.
Thusthetotalnumberofcustomersconnectedtoelectricityunderthethreeprojectswas2456,equatingtoaboutone(1)householdinevery200householdsinthecountry.
(b)LesothoRenewableEnergyBasedRuralElectrification
TheLesothoRenewableEnergyBasedRuralElectrification(LREBRE)projectwasin itsfifthandfinalyearofimplementation.Theprojectwasclosedon31stMarch2013.Overitslifetimetheprojecthadinstalled1,537homesolarsystemsoutofa5,000projecttarget,asuccessfactorof31%.ThemajorconstrainthadbeenlackoffundsforthepurchasingandinstallationofthesystemsfromGovernmentbudget.
ThestreetlightingprojectthatwasfinancedbyaM5milliongrantfromtheChineseGovernmentcommencedinJanuary2013andwouldbecommissionedinMay2013.ThevillagescoveredwereMountMoorosi(Quthing),HaNtsi(Maseru)andPitseng(Leribe).
Generation
Afullfeasibilitystudyfordevelopmentof1200MWpumpedstorageschemewasbeingundertaken.Theplanwastoexport1000MWofthepowerandconsume200MWwithinLesotho.Letšengwindfarmhadnotmadeprogresssincethelastreportingperiod.TheImplementationAgreementfortheprojecthadbeensignedandthemajoroutstandingissuewasthePowerPurchaseAgreementwithLEC.
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
Board Approval and Statement of Responsibility
Members of the Board are required by law to prepare financial statements for each financial year which give a true and fair view of the state of affairs of the Authority as at the end of the financial year and of the results of its operations and cash flows for that period. The annual financial statements set out on pages 34 to 47 are the responsibility of Members of the Board.
Members of the Board are responsible for ensuring that the Authority keeps accounting records which disclose with reasonable accuracy, at any time, the financial position of the Authority and which enable them to ensure that the financial statements comply with the Lesotho Electricity Authority Act No.12 of 2002 as amended.
Members of the Board are also responsible for taking such steps that are reasonably open to them to safeguard the assets of the Authority and to prevent and detect fraud and other irregularities. Members of the Board consider that, in preparing the financial statements for the year ended 31 March 2013 set out on pages 34 to 47, the Authority has used appropriate accounting policies, consistently applied, and were supported by, reasonable and prudent judgments and estimates. Members of the Board also consider that all applicable International Financial Reporting Standards have been followed and confirm that the financial statements have been prepared on a going concern basis.
The auditors’ responsibilities are stated in their report on page 33.
Members of the Board are satisfied that Management introduced and maintained adequate internal controls to ensure that dependable records exist for the preparation of the annual financial statements, to safeguard the assets of the Authority, and to ensure that all transactions are duly authorised.
Against this background, the financial statements set out on pages 34 to 47 which are stated in Maloti, the currency of Lesotho, have been approved and authorised for issue on 13 September 2013 by Members of the Board and signed on its behalf by:
Chairperson Member
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Report of the Auditor General
I have audited the financial statements of Lesotho Electricity Authority set out on pages 34 to 47 for the period ended 31 March, 2013. These financial statements are the responsibility of the Authority’s Members of the Board. My responsibility is to express an opinion on these financial statements based on my audit.
Management’s Responsibility for the Financial statements
Management is responsible for the preparation and fair presentation of these financial statements in accordance with International Financial Reporting Standards. This responsibility includes: designing, implementing and maintaining internal control relevant to the preparation and fair presentation of financial statements that are free from material misstatement, whether due to fraud or error; selecting and applying appropriate accounting policies; and making accounting estimates that are reasonable in the circumstances.
Auditor’s Responsibility
My responsibility is to express an opinion on these financial statements based on the audit. The audit has been conducted in accordance with International Standards on Auditing. Those standards require auditors to comply with ethical requirements and plan and perform the audit to obtain reasonable assurance whether the financial statements are free from material misstatement.
An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the financial statements. The procedures selected depend on the auditor’s judgment, including the assessment of the risks of material misstatement of the financial statement, whether due to fraud or error. In making those risks assessments, the auditor considers internal control relevant to the entity’s preparation and fair presentation of the financial statements in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion to the effectiveness of the entity’s internal control. An audit also includes evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates made by management, as well as evaluating the overall presentation of the financial statements.
I believe that the audit evidence I have obtained is sufficient and appropriate to provide a basis for my audit opinion.
Opinion
In my opinion, the financial statements present fairly, in all material respects, the financial position of the Authority at 31 March 2012, and of its financial performance and its cash flows for the year ended in accordance with International Financial Reporting Standards and in the manner required by the Lesotho Electricity Authority Act No. 12 of 2002.
Lucy. L. Liphafa (Mrs) Auditor General
FINANCIAL STATEMENTS - 2012/13 33FINANCIAL STATEMENTS - 2012/1332
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
FINANCIAL STATEMENTS - 2012/1334 FINANCIAL STATEMENTS - 2012/13 35
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Statement of financial position as at 31 March 2013
Assets
Non-CurrentAssetsProperty, Plant and EquipmentCurrentAssetsCash & BankTrade & Other ReceivablesAssets Held for Sale
TotalAssets
FUNDS&LIABILITIESFundsandReserves Capital GrantRetained Surplus/(Deficit)Revaluation ReserveUniversal Access Fund Balance
Non-CurrentLiabilitiesGratuity
CurrentLiabilitiesBank OverdraftCurrent Portion Long Term LoanTrade & Other Payables
TotalFundsandLiabilities
2012M
2,632,306
13,922,8655,828,937
-19,751,80222,384,108
1,004,7205,632,966
324,91511,352,072
18,314,673
2,111,587
428,979
-1,528,869
1,957,84822,384,108
2013M
2,481,567
32,000,2296,721,727
220,00038,941,94841,423,523
502,3655,378,140
306,33029,232,780
35,419,615
4,114,710
525,503
707,969655,726
1,889,19841,423,523
Notes
7
945
8121311
6
10
6
Statement of comprehensive income for the year ended 31 March 2013
INCOMECustomers’ LevyLicense FeesGoL & World Bank GrantsCapital Grant ReleaseUniversal Access Fund
EXPENDITUREStaff CostsDepreciationDirectors ExpensesAudit FeeUniversal Access FundOperating Costs
SurplusFromOperationsGain/(Loss) Assets SaleFinanceIncomeFinance CostsTotal Other Income
Surplus/(Deficit)fortheyear
COMPREHENSIVEINCOMEGains on Property Revaluation TotalComprehensiveIncome(LossfortheYear)
2012M
13,763,6752,914,1302,846,929
508,71040,063,887
60,097,331
11,230,5351,025,4341,312,041
22,05040,063,887
5,880,27059,534,217
563,114-
116,546(12,979)103,567
666,681
-666,681
2013M
15,545,4663,301,5524,190,271
502,3551,556,237
25,095,881
14,385,367 1,185,526
861,78323,152
1,556,2377,490,051
25,502,116
(406,235)(17,456)168,865
-151,409
(254,826)
206,484(48,342)
Notes
328
11
157
15
1115
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
FINANCIAL STATEMENTS - 2012/1336 FINANCIAL STATEMENTS - 2012/13 37
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Statement of Changes in Funds for the year ended 31 March 2013
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Statement of cash flow for the year ended 31 March 2013
SurplusfortheYearAdjustmentfor:(Increase)/Decrease in ReceivablesIncrease/(Decrease) in PayablesDepreciationCapital Grant AmortisationGain /Loss on Disposal of Fixed Assets
NetCashfromOperatingActivities
InvestingActivities:
Purchase of Fixed AssetsRepayment – Bank LoanDisposal Proceeds NetCashUsedinInvestingActivities
FinancingActivitiesGratuityUniversal Access FundNetCashUsedinFinancingActivitiesCashandCashEquivalents:
Net increase in Cash and Cash EquivalentsCash and Cash Equivalents at the Beginning of the YearCashandCashEquivalentsattheendoftheyear
Notes
7
2012M
666,681
133,789(935,378)1,025,434(508,710)
-
381,816
(717,209) (337,155)
-
(1,054,364)
-1,617,428
(21,325,390)(19,707,962)
(20,380,510)33,874,398
13,493,888
2013M
(254,826)
(892,790)(165,093)1,185,526(502,355)
17,456
(612,082)
(1,310,911) -
20,000
(1,290,911)
2,003,12317,880,708
19,883,831
17,980,83813,493,888
31,474,726
RetainedSurplus
M
4,743,190--
223,095-
666,681
5,632,966
---
(254,826) -
5,378,140
CapitalGrants
M
1,513,430(508,710)
----
1,004,720
(502,355)---
-
502,365
RevaluationReserve
M
548,010--
(223,095)--
324,915
--
(18,585)--
306,330
Balanceat31/03/2011Amortisation for the yearGrantRevaluation ReserveUniversal Access FundSurplus/(Deficit) for the year
Balanceat31/03/2012
Amortisation for the yearGrantsRevaluation ReserveSurplus/(Deficit) for the yearUniversal Access Fund
Balanceat31/03/2013
UniversalAccessFund
M
32,677,462---
(21,325,390)-
11,352,072
----
17,880,708
29,232,780
TotalM
39,482,092(508,710)
--
(21,325,390)666,681
18,314,673
(502,355)-
(18,585)(254,826)
17,880,708
35,419,615
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
FINANCIAL STATEMENTS - 2012/1338 FINANCIAL STATEMENTS - 2012/13 39
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Notes to the Financial Statements for the year ended 31 March 2013
ACCOUNTINGPOLICIES
BasisofAccountingThe principal accounting policies of the Authority, which are set below, have been consistently followed in all material respects and comply with International Financial Reporting Standards and the Lesotho Electricity Authority Act No.12 of 2002 (as amended). These financial statements have been prepared on the historical cost basis except for financial assets, which are stated at fair values and incorporate the principal accounting policies. The financial statements are prepared on a going concern basis.
Property,PlantandEquipmentProperty, plant and equipment are stated at cost/valuation less accumulated depreciation less impairment losses where applicable. Depreciation is calculated on a straight line basis from the time the property, plant and equipment were available for use, so as to write off their cost over their expected useful lives, taking into account their residual values. The following expected useful lives are used in the calculation of depreciation:
Office Fittings 5 Years Office Furniture 5 Years Office Equipment 4 Years IT Equipment 3 Years Motor Vehicles 4 Years Freehold Refurbishment 3 Years
Consumables are assets that cost less than M1,500 as per the LEA Financial Standing Orders hence they are written off in the period of purchase.
ForeignCurrencyTranslationTransactions in foreign currencies are translated to Maloti at the foreign exchange rate ruling at the date of the transaction.
CashandCashequivalentsCash and cash equivalents include cash in hand, deposits held at hourly call with the banks less bank overdrafts.
TaxationNo provision for taxation is required as the Authority is exempt from taxation.
RevenueRecognition
RevenueIncome comprises of customer levy, licence fees from LEC and LHDA, bank interest and grants from Government of Lesotho and World Bank , and is recognized when invoiced or at the time of disbursement by the relevant institution.
InterestIncomeInterest is recognized on a time proportion basis taking account the effective yield on the investment.
RevenueGrantsRevenue grants are recognized as income to match them with related costs, which they have been intended to compensate. Capital grants are recognized as deferred credit and are recognized in the income expenditure on the basis of matching them with the related costs for which the grants are intended to cover. They are amortised over the useful lives of assets.
1.
1.1
1.2
1.3
1.4
1.5
1.5.1
1.5.2
1.5.3
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Notes to the Financial Statements for the year ended 31 March 2013
LeasesLeases on which a significant portion of the risks and rewards of ownership are retained by the lessor are classified as operating leases. Payments made under the operating leases are charged to the income statement on a contracted amounts basis over the period of the lease.
TradeandOtherReceivablesTrade and other receivables originated by the enterprise are stated at fair value of consideration receivables less impairment for trade receivables if any.
TradeandotherpayablesTrade and other payables are stated at their fair values.
PreviousYear’sFiguresFigures for the previous year have been regrouped and stated wherever necessary to conform to current year’s presentation.
FinancialInstrumentsExposure to credit risk and interest rate risk arising in the normal course of the Authority’s business.
FinancialAssetsThe principal financial assets are cash and bank balances, investments, trade and other receivables. These assets are originated by the enterprise and are accounted for at trade rate.
FinancialLiabilities Financial liabilities are classified according to the substance of the contractual arrangements entered into. The principal financial liabilities are trade and other payables.
InterestRateRiskThe Authority is exposed to various risks associated with the effect of fluctuations in the prevailing levels of market rates of interest on its cash resources and investments. The cash resources are managed to ensure that surplus funds are invested in a manner to achieve maximum returns while minimizing risks.
CreditRiskThe financial assets of the Authority that are subject to credit risk consist mainly of cash resources, receivables and investments. The cash resources and investments are placed with reputable financial institutions. Where appropriate, adequate provisions are made for bad debts.
FairvaluesThe fair values of most financial instruments are substantially identical to carrying values reflected in the statement of financial position.
GratuityThe Authority provides for gratuity for contract staff as per the terms of their respective employment contracts.
1.6
1.7
1.8
1.9
1.10
1.11
1.12
FINANCIAL STATEMENTS - 2012/1340 FINANCIAL STATEMENTS - 2012/13 41
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Notes to the Financial Statements for the year ended 31 March 2013
ImpairmentofAssetsImpairment losses of continuing operations are recognized in the income statement in those expense categories consistent with the function of the impaired assets.
An assessment is made at each reporting date as to whether there is any indication that previously recognized impairment losses may have decreased. If such indication exists, the recoverable amount is estimated. A previously recognized impairment loss is reversed only if there has been a change in the estimates used to determine the asset’s recoverable amount since the last impairment loss was recognized. If that is the case the carrying amount of the asset is increased to its recoverable amount. That increased amount cannot exceed the carrying amount that would have been determined, net of depreciation, had no impairment loss been recognized for the asset in prior years. Such reversal is recognized in profit or loss unless the asset is carried at revalued amount, in which case the reversal is treated as a revaluation increase. After such a reversal the depreciation charge is adjusted in future periods to allocate the asset’s revised carrying amount, less any residual value, on a systematic basis over its remaining useful life.
AdoptionofIFRSsDuringtheYearThe Authority has adopted the following revised standards during the year and comparative figures have been amended as required. Adoption of revised standards does not have any effect on the funds and reserves as at 31 March 2009.IAS 1 Presentation of Financial Statements;IAS 8 Accounting Policies, Changes in Accounting Estimates and Errors;IAS 10 Events after the Reporting Period;IAS 16 Property, Plant and Equipment;IAS 17 Leases;IAS 20 Accounting for Government Grants and Disclosure of Government Assistance;IAS 21 The Effects of Changes in Foreign Exchange Rates;IAS 24 Related Parties Disclosures;IAS 39 Financial Instruments: Recognition and Measurement; IAS 40 Investment Property, and IFRS 5 Non-current Assets Held for Sale and Discontinued Operations
IFRS’snotAdoptedThe Authority has not applied the following IFRSs that have been issued.IFRS 2 Shared-based Payments;IFRS 3 Business Combinations;IFRS 4 Insurance Contracts, and IFRS 6 Exploration for and Evaluation of Mineral Resources.
These standards do not apply to the activities of the Authority.
1.13
1.14
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
2. WorldBank/GoLRevenueGrant 3. LicenceFees LEC LHDA
4. Trade&OtherReceivables LEC – Customers’ & Electrification Levies Trade & Other Receivables
5. AssetsHeldforSale Motor Vehicle due for disposal
2012M
2,846,929
2,354,230559,900
2,914,130
4,277,1541,551,783
5,828,937
-
2013M
4,190,271
2,706,938594,614
3,301,552
4,554,1622,167,565
6,721,727
220,000
Notes to the Financial Statements for the year ended 31 March 2013
6. Trade&OtherPayables
Fallingduewithin1Year Gratuity * Retention Fee - Universal Access Fund Trade & Other Payables
Fallingdueafter1Year Gratuity
2012M
398,052852,919277,898
1,528,869
2,111,5873,640,456
2013M
707,969251,089404,637
1,363,695
4,114,7105,478,405
*Retention fee refers to amount held by the Authority on completion of electrification projects for latent defects for a period of a year.
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Cost/RevaluationAt April 1,2012AdditionsAdjustments RevaluationAtMarch31,2013
DEPRECIATION
At April 1, 2012Charge for the yearAdjustments
AtMarch31,2013
CARRYINGVALUEAt April 1, 2012
AtMarch31,2013
ITEquipment
M
2,640,205313,150
(752,577)-
2,200,778
33.33%
1,316,221696,267
(723,843)
1,288,645
1,323,984
910,280
OfficeEquipment
M
84,520-
(71,547)51,55264,525
25%
40,78921,131
(61,920)
-
43,731
64,525
OfficeFurniture
M
340,79224,644(6,497)
358,939
20%
69,12071,033(3,040)
137,113
271,672
221,826
OfficeFittings
M
149,503-
(149,503)--
20%
44,01129,791
(73,802)
-
105,492
-
MotorVehicles
M
1,031,046751,424
(869,259)154,929
1,068,140
25%
232,328309,300
(541,628)
-
798,718
1,068,140
FreeholdRefurbishment
M
170,441221,693
(177,191)-
214,943
33.33%
81,73258,004
(139,736)
-
88,709
214,943
Notes to the Financial Statements for the year ended 31 March 2013
7. Property,PlantandEquipment
Totals
M
4,416,5071,310,911
(2,026,574)206,481
3,907,328
1,784,2011,185,526
(1,543,969)
1,425,758
2,632,306
2,481,567
All assets were revalued on the 31 March 2013 in compliance with IAS 16 to reflect their fair values.
Balance at the beginning of the yearIncrease during the yearAmortised during the yearBalanceattheendoftheyear
2012M
1,513,430-
(508,710)1,004,720
2013M
1,004,720-
(502,355)502,365
8. CapitalGrants
Petty CashShort-Term Deposits – (NedBank)Short-Term Deposits – (StanLib)
Current Accounts – UAFShort-Term Deposits – UAF (StanLib)
Bank overdraft - (Nedbank)Total
2012M
2,500 1,065,565 3,012,751
4,080,816
829,500 9,012,548
13,922,864(428,979)
13,493,885
2013M
2,500 2,159,422 2,572,514
4,734,436
53,169 27,212,62432,000,229
(525,503)31,474,726
9. CashandcashequivalentsCash and cash equivalents are measured at fair price and consists of:
Notes to the Financial Statements for the year ended 31 March 2013
10. BankOverdraft
The overdraft represents cheques issued but not yet presented for payment at year end , which would otherwise be met by automatic draw downs from call account.
11. UniversalAccessFund(UAF)-Receipts&Payments
ReceiptsLevies Collection Finance Income (i)TOTALExpenditureElectrification ProjectsBank ChargesTOTAL
MovementinUAF–FortheyearUniversal Access Fund –B/FUniversalAccessFundBalance(ii)
2012M
7,533,3551,211,981
18,745,336
40,063,8876,839
40,070,726
(21,325,390) 32,677,462
11,352,072
2013M
18,728,538708,407
19,436,945
1,553,6112,626
1,556,237
17,880,70811,352,072
29,232,780
11.1 UNIVERSALACCESSFUNDThe Fund was established pursuant to LEA Act 2002. The main objective of the Fund is to facilitate expansion of electricity services where they are non-existent. The Fund is administered pursuant to UAF Rules of 2011. It receives monies from electricity users, through payment of rural electrification levies. The Authority determines the levies and approves all the projects to be funded by the UAF, including annual budget for the Fund.
FINANCIAL STATEMENTS - 2012/13 43FINANCIAL STATEMENTS - 2012/1342
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Notes to the Financial Statements for the year ended 31 March 2013
11.2 Receipts
(i) Finance income - Represents interest realized on investment account.(ii) Universal Access Fund Balance – A budget of M30,280,000 had been approved for electrification projects for the next financial year
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Notes to the Financial Statements for the year ended 31 March 2013
VillagesName/Projects
Ha - Leteba
Koro Koro Ha Mofoka
Ha Belo
Ha Mojaki
Ha Rafolatsane
Hololo
TOTALS
Balb/fMar2011
M
-
-
-
-
1,815,611
-
1,815,611
ApproveConstracts
1,406,238
3,889,813
5,568,163
2,156,383
5,023,204
4,552,225
Balance
M
-
-
-
-
251,089
-
251,089
251,089
PaymentsProject
M
-
-
-
-
1,302,522
-
1,302,522
RetentionFeePaid
M
50,118
186,368
262,401
106,053
-
227,395
832,335
Totals
M
50,118
186,368
262,401
-
1,302,522
-
2,134,857
14. UniversalAccessFund(UAF)ProjectsfortheYearEnded31March2013
Savings
-
8,549
12,207
-
262,000
-
282,586
NameofContractor
Lesehe
Jimmy Electronics
Moramo Civils
LR Construction
Lesehe Cons.
Jimmy Elecronics
Retention
50,118
194,917
274,438
106,053
251,089
227,395
1,104,010
CommittedFunds
Balance at the beginning of the yearIncrease during the yearAmortised during the yearBalanceattheendoftheyear
2012M
548,010-
(223,095)324,915
2013M
324,915206,484
(225,069)306,330
13. RevaluationReserve
12. RetainedSurplus/(Deficit)
Income
Expenditure
OperatingSurplus(Deficit)
Loss on disposal
Total Other Income
Surplus/(Deficit)fortheyear
Revaluation Reserve Amortisation
Surplus B/F
RetainedSurplus/(Deficit)
2012
60,097,331
59,534,217
563,114
103,567
666,681
223,095
4,743,190
5,632,966
2013
23,539,644
23,945,879
(406,235)
(17,456)
168,865
(254,826)
-
5,632,966
5,378,140
44 45FINANCIAL STATEMENTS - 2012/13 FINANCIAL STATEMENTS - 2012/13
Lesotho Electricity Authority ANNUAL REPORT ANNUAL REPORT Lesotho Electricity Authority
FINANCIAL STATEMENTS - 2012/1346 FINANCIAL STATEMENTS - 2012/13 47
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Notes to the Financial Statements for the year ended 31 March 2013
INCOME:Customers’ LevyLicence feesGoL & World Bank GrantsCapital Grants Release
Universal Access FundOtherIncomeFinance IncomeGain/(Loss) Assets Sale
TotalIncome
Less:ExpenditureDirectors’Expenses:Director’s FeesOther Costs – BoardBoard Training
StaffCosts:Staff Remuneration & BenefitsStaff Wellness ActivitiesGratuityStaff Training/WorkshopsHealth & Wellness allowanceStaff Uniform
OperatingCosts:StationeryAdvertisingPublic AwarenessPublicationsAdcocacyStakeholders ConsultationEnergy Planning W/shopExpansion of Electricity NetworkLEA LiteratureInternational Technical StandardsConsumables assets below M1,500Farewell CostsESAWAS subscriptionPublic Relations
2012M
13,763,6752,914,1302,846,929
508,71020,033,44440,063,887
116,546-
116,54660,213,877
551,538284,764475,739
1,312,041
8,308,567-
2,321,982534,819
20,16845,000
11,230,535
183,45896,558
107,465--
24,610---
5,58019,60931,959
-2,095
15.DetailedStatementofComprehensiveIncome
Lesotho Electricity Authority Financial Statements for the year ended 31 March 2013
Notes to the Financial Statements for the year ended 31 March 2013
Office ExpensesTransport CostsBank ChargesRentElectricityTelephoneInternetCorporate Social ResponsibilityRisk ConsultantInsuranceIT ExpensesRERA SubscriptionRERA Meetings & W/shopsAFUR Meetings & W/shopsInternational Meetings & W/shopsAFUR SubscriptionDevelopment of bylawsHuman Resource ConsultantAnnual ReportInspection CostsPromotional ItemsEconomic & Financial Regulatory ModelIncreasing Access to ElectricityNational Security of SupplyPublic HearingUniversal Access fundMonitoring ComplianceCustomer EducationCustomer WorkshopsAfrican Peer ReviewWater & Cleaning Services – Maseru WestSecurity
WaterRegulationExpensesBoard, Staff and Stakeholders Study toursWater Regulatory Instruments ConsultancyOther Water Regulation Expenses
Othercosts:Audit FeesDepreciationFinance costsOperating&OtherCosts
TotalExpenses
2011M
153,426235,615
33,797615,325
43,852176,093
72,00067,42189,87597,64695,971
216,148240,201208,766485,062
55,72546,65622,750
36,15323,098
104,057 9,801
72,521 5,175
17,586 40,063,887
20,65012,515
9,6437,948
57,5749,097
350,2171,436,467
280,105
22,5001,025,434
12,97947,004,620
59,547,196
2013M
172,270216,965
39,242661,325
62,938135,477
72,00095,53242,20085,487
101,275251,539
432,69052,729
553,99861,255
- 24,000
37,1538,485
166,574 170,946
8,096 -
60,010 1,556,237
-28,814
7,42361,75054,90110,007
-
3,071,954 19,275
23,152
1,185,526-
10,254,965
25,502,116
15.DetailedstatementofcomprehensiveIncomecontinued
2013M
15,545,4663,301,5524,190,271
502,35523,539,644
1,556,237
877,272(17,456)859,816
25,955,697
426,154134,243301,386
861,783
10,752,603 5,8722,792,022
788,002 20,465
26,40414,385,368
135,26658,320
226,18710,04332,123
6,494108,637
11,11540,17928,493
4,148-
62,735-
Lesotho Electricity Authority ANNUAL REPORT
NOTE/COMMENT - 2012/1348
Page Note/Comment
© Lesotho Electricity Authority 2013
Lesotho Electricity Authority, 6 Floor, Moposo House, Kingsway, Maseru, Lesotho
Tel: +266 22 312479 Fax: +266 22 315094
Email: [email protected] Website: wwww.lea.org.ls