http://nodal.ercot.com 1Lead from the front
Texas Nodal
EDS 3 Release 5
Monday / Friday Market Updates
March 07, 2008
http://nodal.ercot.com 2Lead from the front
Texas Nodal
Agenda
• Antitrust Admonition• Submissions Update
– This Week’s Activities– Submissions Status
• Updates / Questions / Reminders• External Interface Specification 1.09 Review• LFC Update• Q&A / Open Forum• Roll Call
http://nodal.ercot.com 3Lead from the front
Texas Nodal
Antitrust Admonition
ANTITRUST ADMONITION
ERCOT strictly prohibits Market Participants and their employees who are participating in ERCOT activities from using their participation in ERCOT activities as a forum for engaging in practices or communications that violate the antitrust laws. The ERCOT Board has approved guidelines for members of ERCOT Committees, Subcommittees and Working Groups to be reviewed and followed by each Market Participant attending ERCOT meetings. If you have not received a copy of these Guidelines, copies are available at the Client Relations desk. Please remember your ongoing obligation to comply with all applicable laws, including the antitrust laws.
http://nodal.ercot.com 4Lead from the front
Texas Nodal
Submission Times for 03/10/08
• Activities for Week of 03/10/08– Submit the following during the 12:00 – 4:00pm submission
window:• COP• TPO for trade date +2• Output Schedule (open to all resources)• INC/DEC (DSR resources only)
– Submit RT COP adjustments during business hours– Submit RT OS adjustments during business hours
http://nodal.ercot.com 5Lead from the front
Texas Nodal
Submissions Status
2/29/2008 3/1/2008 3/2/2008 3/3/2008
93% 85% 11 82% 73% 9 76% 71% 9 90% 83% 9
COPTPOIDO OS COP
TPOIDO OS COP
TPOIDO OS COP
TPOIDO OS
Submissions still variable but improved ERCOT continues to have system issues on a daily basis
This is being investigated by support If ERCOT system issues are preventing dailies, contact ERCOT for assistance
3/4/2008 3/5/2008 3/6/2008 3/7/2008
98% 93% 10 96% 91% 12 95% 96% 3 88% 88% 2
COPTPOIDO OS COP
TPOIDO OS COP
TPOIDO OS COP
TPOIDO OS
http://nodal.ercot.com 6Lead from the front
Texas Nodal
Updates / Questions / Reminders
• DST Issues:– For Sunday 3/9, in addition to the DST adjustment, omit the
final hour of the day (e.g. do not include 23:00:00 – 00:00:00)
– For submissions made prior to Sunday for Trade Dates after Sunday, omit the first hour of your submissions
– For submissions made after Sunday 04:00:00, submit as normal (including the first interval of the trade date) with the new GMT offset -05:00:00
– DST Adjustment for Short Day:DST adjustment for short dayHour Ending 01:00:00 -06:00Hour Ending 02:00:00 -06:00<HE 03:00:00 is skipped>Hour Ending 04:00:00 -05:00 ( note the GMT offset change)Etc…
http://nodal.ercot.com 7Lead from the front
Texas Nodal
Updates / Questions / Reminders
• Reminder: Changes to Offer Curve Submissions– QSE’s can now start
• Adjusting for FIP/FOP• Moving between 80/120 percent of cost
– Week of 3/17, QSE’s will submit any desired curve based on assigned intervals
• Current FIP/FOP to be Used for Week of 3/10/08– FIP = 9.505– FOP = 21.65
• EDS Environment Outages– 3/03 – App Server Core Dump (root cause in review)– 3/04 – Storage detached from app server– 3/06 – App Server Core Dump (root cause in review)
• New Draft Version of Settlement Points Posted to EDS 4 Readiness Center– Sent out for comment 3/6/08– EDS 4 Readiness Center:
http://nodal.ercot.com/readiness/eds4/documents/index.html
http://nodal.ercot.com 8Lead from the front
Texas Nodal
External Interface Specification 1.09 Review
• Outage Schedule – Section 7– Corrected payload of “Get” AwardSet– Added the “Outage” to the payload of the “Create” OS Reply– Changed the verb from “Update” to “Change” in OutageSet to be
consistent with the BidSets– 5.3.12 Updated Outage notification structure– For Outage Query added for Request/ID to name value pair:
OuatgeID or GroupID– Updated all Outage Scheduler XML Schema figures– Added description for Outage Types
http://nodal.ercot.com 9Lead from the front
Texas Nodal
External Interface Specification 1.09 Review
• Short mRID
– Corrected the Short mRID logic to include needed tokens for CRR, EB, EOO, PTP
BID Type Type (XML tag) Short mRID Key String
Ancillary Service Offer ASOffer <QSE>.<TradingDate>.ASO
Ancillary Service Trade ASTrade <QSE>.<TradingDate>.AST
Capacity Trade CapacityTrade <QSE>.<TradingDate>.CT
Current Operating Plan COP <QSE>.<TradingDate>.COP
CRR Offer CRR <QSE>.<TradingDate>.CRR.Source.Sink
DC Tie Schedule DCTieSchedule <QSE>.<TradingDate>.DCT
DAM Energy Bid EnergyBid <QSE>.<TradingDate>.EB.SP
DAM Energy-Only Offer EnergyOnlyOffer <QSE>.<TradingDate>.EOO.SP
Energy Trade EnergyTrade <QSE>.<TradingDate>.ET
Inc Dec Energy Offer IncDecOffer <QSE>.<TradingDate>
Output Schedule OutputSchedule <QSE>.<TradingDate>.OS
PTP Obligation Bid PTPObligation <QSE>.<TradingDate>.PTP.Source.Sink
Self-Arranged AS SelfArrangedAS <QSE>.<TradingDate>.SAA
Self-Schedule SelfSchedule <QSE>.<TradingDate>.SS
Three Part Supply Offer ThreePartOffer <QSE>.<TradingDate>.TPO
http://nodal.ercot.com 10Lead from the front
Texas Nodal
External Interface Specification 1.09 Review
• Wind Forecasting– 5.3.14 Updated the Wind Generation Notification Structure and
section• Tagged startTime and
endTime as not used and deprecated (reviewSpec for effectedTransactions
• Additionally severalGeneral Updates
http://nodal.ercot.com 11Lead from the front
Texas Nodal
LFC Update
• QSE Organizations which tested this week: – Coral Power
• Issue encountered: – Data Point Mapping
• QSE Organization(s) Scheduled to test next week: – BTU Wednesday 9:00 AM CT
• Test Form revisions will be posted to the readiness center as necessary.• Test Form submissions are to be submitted two business days before the test.• All submissions should be sent to [email protected]. • Phase II Testing
– Test Procedure & Test Forms posted on Nodal Readiness Center– Link: http://nodal.ercot.com/readiness/eds3/documents/index.html
• Phase III Testing• LFC Phase III Pre Testing Workshop:
– ERCOT will hold a market workshop at the ERCOT Austin Offices on Friday, March 14, 2008 from 9:00 am to 3:00 pm.
– Workshop will provide • A detailed overview of the pre-testing activities• Required ICCP data submittals• Schedule for EDS 3 Release 6.3 LFC pre-testing. This meeting will address test activities as called for in
Section 5.2 of the EDS 3 - LFC Testing Market Participant Handbook v1.0, located at http://nodal.ercot.com/readiness/eds3/documents/index.html under the Release 6 – LFC section.
• The workshop will provide participants an opportunity to discuss EDS 3 Release 6.3 LFC testing activities and take part in a workshop with ERCOT personnel responsible for the test.
http://nodal.ercot.com 12Lead from the front
Texas Nodal
Q&A
Q&A / Open Forum