PLM World ‘06
Premium Partners:
Cobra: Tower crane with an articulated jib
Laurent Donato, Head of Product Development Laboratory
University of Applied Sciences of Western [email protected]+41 26 429 66 77
![Page 2: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/2.jpg)
Europe and Switzerland
![Page 3: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/3.jpg)
University of Applied Sciences of Western Switzerland
16 institutions
6000 students
700 professors
Annual budget : 140 Mio €
aR&D : 14 Mio €
Western CHHES-SO
![Page 4: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/4.jpg)
College of Engineering and Architecture Fribourg
600 students70 professors70 researchersBudget : 16 Mio €aR&D : 4 Mio €
![Page 5: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/5.jpg)
Department of Industrial Technology
Services aR&DPost form.Formation
Services
Studies
Research groups
Electrical and electronic construction
Mechanical construction
Chemical and Mechanical Analysis
Industrial automation
Analysis and simulation
Industrial chemistry
Integrated systems
Chemistry
Mechanical engineering
Electrical engineering
![Page 6: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/6.jpg)
aR&D Collaboration
![Page 7: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/7.jpg)
Problems occuring with traditional cranes
![Page 8: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/8.jpg)
New specifications
Basis idea:Harbour’s cranes
![Page 9: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/9.jpg)
Solution: The Cobra crane
![Page 10: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/10.jpg)
Cobra’s advantages
Obstacles can be bypassed and criticalareas avoided
![Page 11: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/11.jpg)
Cobra’s advantages
Several cranes can work simultaneously
![Page 12: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/12.jpg)
Height under hook is reduced
Fewer tower parts to be assembled
Less ballast
Smaller baseplate
Reduced exposure to wind
Cobra’s advantages
![Page 13: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/13.jpg)
Optimal extension of the articulated jib
Increased stability of the crane
Higher lifting capacity for equal outreach
Innovation: Mobile counterweight patented
![Page 14: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/14.jpg)
Sling of the mobile counterweight
Innovation: Mobile counterweight patented
![Page 15: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/15.jpg)
Center of gravity on the rolling treadto avoid oscillations
Easy assembling of ballast
Innovation: Mobile counterweight patented
![Page 16: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/16.jpg)
Cable for Front Distribution
Cable for Rear Distribution
Innovation: Antagonistic cables for jibcontrolling
![Page 17: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/17.jpg)
max 12 m
max 4 m
Maximum truck load: 40 tons
Requirements for road transport
![Page 18: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/18.jpg)
Risks concerning the staff during assembling and disassembling
E10-1 Schéma 3D Lieux de montage Détail de la connexion Etapes
Montage des éléments de
tour
Détail des connexions A-D
- Un ouvrier attache les
élingues du camion grue à un élément de tour
- Camion grue met l’élément
en position pour le montage
- Le monteur (installé sur l’élément du dessous) fixe l’élément au moyen d’une clef dynamométrique les 8 boulons (au serrage définit) et s’assure de la qualité du serrage
- Le monteur monte au
moyen de l’échelle centrale au sommet de l’élément suivant et détache les élingues
- L’aide monteur attache les
élingues du camion grue à un second élément de tour…etc...
A
B
C
DDefinition of the assembling steps
Chart of preliminaryrisk analysis for each step
Risk Analysis
![Page 19: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/19.jpg)
Modeler
Drafting
Design with I-DEAS
Assembly
Manufacturing
![Page 20: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/20.jpg)
Load cases according to European Handling Federation standards
Static and dynamic load cases
Finite Element Analysis
![Page 21: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/21.jpg)
Blocking during extension of the articulated jib
Breaking of the load cable
Emergency stop during rotation of the crane
Dynamic analysis: Failure mode
![Page 22: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/22.jpg)
1. Definition of the mechanism in I-DEAS MECHANISM SIMULATION
3
2
1
4
5
67
8 9
10
11
12
13
14
12
10
Dynamic analysis
![Page 23: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/23.jpg)
2. Computing forces resulting from the mechanism
Dynamic analysis
![Page 24: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/24.jpg)
3. Integration of the flexible bodies in MSC.ADAMS
Flexible jib# 1
Flexible jib# 2
Dynamic analysis
![Page 25: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/25.jpg)
4. Solving the load cases in MSC.ADAMS
350 mm
Vertical oscillation of the jib due to breakingof the cable
Δ y
Dynamic analysis
![Page 26: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/26.jpg)
5. Transfer of MSC.ADAMS results in I-DEAS Response Analysis
Dynamic analysis
![Page 27: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/27.jpg)
Measures withstrain gauges
Tests on prototype
![Page 28: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/28.jpg)
Comparison with computational results
Load cases Error on BeamElements
Error on Shell Elements
Static 10 % 5 %
Dynamic 20 % 10 %
Tests on prototype
![Page 29: Laurent Donato, Head of Product Development Laboratory ... · PLM World ‘06 Premium Partners: Cobra: Tower crane with an articulated jib Laurent Donato, Head of Product Development](https://reader031.fdocuments.us/reader031/viewer/2022011917/5fe51256a03d84257f6befab/html5/thumbnails/29.jpg)
Cobra suits European Handling Federationstandards
Computational results confirmed by test measurements
Cobra is ready to be used on a construction site
Versions with a bigger outreach or with higher lifting capacity are being studied
Conclusion