Lake Mission Viejo Advanced Purified Water Treatment Facility

16
Lake Mission Viejo Advanced Purified Water Treatment Facility April 21, 2016

Transcript of Lake Mission Viejo Advanced Purified Water Treatment Facility

Lake Mission ViejoAdvanced Purified Water

Treatment Facility

April 21, 2016

Santa Margarita Water District• Provides Water and Wastewater Service to 

over 155,000 residents• Over Next 20‐30 years ~40,000 More 

Residents

SMWD Service Area

Indoor Use12,100 AF

(February low flows)

24,000 AFPotable Water

Ocean Outfall3,130 AF

Recycled Water7,600 AF

Chiquita  – 4,000 AFOso Creek ‐ 1,800 AF3A WRP ‐ 1,800 AF

Urban Return Flows1,800 AF

Oso Barrier ‐ 1,120 AFHorno Basin ‐ 180 AFTrabuco ‐ 300 AFDove Canyon ‐ 200 AFGobernadora ~ 1,250 AF

SMWD 2015 Water SupplyWastewater

Chiquita ‐ 6,500 AFOso Creek ‐ 1,980 AFSOCWA ‐ 2,250 AF

Outdoor Use9,400 AF

(18,300 AF)

RECYCLED WATER PROJECTS

• Califia – 220 afy• Coto de Caza – 400-1,250 afy• Palmia – 70 afy• Lake Mission Viejo APWTF – 300 afy• Misc. Conversions

• Hidden Ridge – 35 afy• Lake Mission Viejo – 50 afy• City of Mission Viejo – 50 afy

• Las Flores – 220 afy• Melinda Road – 150 afy• Rancho Santa Margarita – 1,000 afy

Lake Mission ViejoAdvanced Purified Water Treatment Facility

Project Background• Lake Refill ~ 600 afy

• Rainfall ~ 100-300 afy• Groundwater ~ 150 afy• Potable Make Up Water ~ 150-350 afy

• Provide Sustainable Make Up Water• Drought proof• Avoid regulatory restrictions

• Cost Effective• Implementable

• Proximity to District Facilities

Finisterra Pump Station

Pump Station

Zone B Reservoir

Access Road

Looking East Across Reservoir at Pump Station

Looking North West at Finisterra Pump Station

Looking West Across Reservoir

Lake Mission ViejoAPWTF - Components

• Process Feed Pumps• Remove “larger” solids • 475 gpm• >200 micron

Pre Screening

• Protect RO membranes

• 475 gpm

UltraFiltration(UF) • Verify no free 

chlorine• pH adjustment for ammonia/nitrogen removal

Chemical Conditioning

• Remove TDS• Remove NH3/NO2

• pH adjustment

Reverse Osmosis(RO) • 375 gpm

• Pathogen Removal

• No chlorine residual

UV Disinfection

• If determined to be necessary

Nitrate Removal(TBD) • Lake Mission 

Viejo• Improve RW System  WQ

Effluent Discharge

Brine ~ 130,000 gpd

BW ~ 35,000 gpd

Lake Mission Viejo Preliminary Process Diagram

Lake Mission Viejo APWTF Preliminary Site Plan

Lake Mission Viejo - Advanced Purified WaterEstimated Cost of Water

ITEM Annual Cost 300 AF/YR

CapEX@ $5.1 m – 20 yrs. @ 2.5% ‐3.75% $300,000 $1,000

O&M Costs

Electrical $  66,000

Chemical $  61,000

Repair & Replace $129,000

Labor $150,000

Subtotal O&M Costs(1) $406,000 $   680

Cost of Source Water $ 320

Cost of APW ($/AF) $2,000

MWD – LRP Contribution ($475)

Effective Cost of APW ($/AF) $1,525(1) Assumes operating costs spread over 600 af/yr production

Project Financing

• City of Mission Viejo• $1 million grant• $3 million low interest loan

• Santa Margarita Water District• $1.1 million loan

• Lake Mission Viejo Association• Repays CapEX with monthly fixed charges• Pays operating costs for only that APW provided

• Metropolitan Water District• LRP - $475/af, 15 years