Transcript of KYTC Freight
KYTC FreightLynn Soporowski, P.E.
Branch Manager, Modal Programse [email protected]
p 502-782-5083
Casey WellsFreight Coordinator
e [email protected] 502-782-5095
Carol BrentFreight GIS & Annual Reports
e [email protected] 502-782-5048
Kentucky Shortline Railroad GrantsFY
10-
12 • $4 Million• 50/50 match• No specific
restrictions to project types FY
13-
14 • $3.2 Million• 50/50 match• Limited to
reconstructions, safety improvements, and signaling upgrades at public, at-grade crossings
FY 1
5-16 • $3.2 Million
• 80/20 match• Project type
same as FY 13-14• Expanded to
include grade separated crossings
Shortline railroad grant money not included in Governor’s proposed FY 17-18 budget
2013-16 KY Shortline Crossing Improvement Grants
• $1,600,000 each for FY 2013 – FY 2016
• Project Types: • At-grade crossing reconstruction • Grade-separated reconstruction (overpass) • Crossing safety equipment improvements
2013-16 KY Shortline Crossing Improvement Grants• $1,600,000 each for FY 2013 – FY 2016• Project Types:
• At-grade crossing reconstruction • Grade-separated reconstruction (overpass) • Crossing safety equipment improvements
• 5 applicants, 211 projects• P&L – 79 projects• RJC – 107 projects• TTI – 22 projects• KRM – 2• POL – 1
• 21 Counties
2013-16 KY Riverport Improvement Grants$500,000 each for FY 2013 – FY 2016 Projects limited to dredging and maintenance of access
Owensboro Riverport - 8
Hickman Riverport - 8
Louisville Riverport - 4
Paducah Riverport - 3
Henderson Riverport - 4
Greenup-Boyd Riverport - 2
Eddyville Riverport - 7
$638,817
$442,430
$205,110
$200,000
$164,890
$157,337
$150,250
$ Awarded
Summary of all KRI Project Types
Roadway Surfacing
Railroad Rehab
Grain Elevator Rehab
Dock Repairs
Truck Scale Replacement
Barge Access Catwalk
Dock Dredging
Conveyor Rehab
Security Gate Addition
Crane Replacement
0 2 4 6 8 10 12 14
# of Projects
Roadway PavingHenderson Riverport
Roadway PavingTruck Scale Replacement
Owensboro Riverport
Conveyor RehabPaducah Riverport
Barge Access CatwalkHickman Riverport
Dock RehabEddyville Riverport
Dock PavingGreenup-Boyd Riverport
Rail RehabLouisville Riverport
Dock PavingEddyville Riverport
KYTC Freight• 2015 Rail Plan
• Inventory• Passenger Rail• Sources of Funding• Rail Safety and Security• Rails to Trails
• 2016 Freight Plan (mid-April)• Inventory• Goals and PMs• Current Conditions• Key Industries and Supply Chains• Future Trends and Challenges• Strengths, Weaknesses, Opportunities
• 2017 Waterways Plan• Inventory• Current Conditions• Future Trends and Challenges• Investment Opportunities and
Strategies
• 2016 Aviation Plan• KYTC Dept of Aviation• Underway January 2016
Thanks!
Lynn Soporowski, P.E.Branch Manager, Modal Programse [email protected] 502-782-5083
Casey WellsFreight Coordinatore [email protected] 502-782-5095
Carol BrentFreight GIS & Annual Reportse [email protected] 502-782-5048
Contact us!