KP4 - asgmo.ba

1
N E R E T V A 0 25 50 75 100m. 5 PS 1 PS2 PS 3 PS4 PS 10 OT 11 OT 1 OT 2 OT 3 OT 12 OT 4 OT 5 OT 13 OT OT 6 7 OT OT OT OT 14 8 9 15 OT OT 16 17 OT 2 3 1 4 TP 5 TP 6 TP 90 50 45 200 40 60 125 125 90 90 250 600 100 350 600 400 40 200 350 600 200 90 125 90 125 90 300 90 90 125 600 32 350 350 200 350 60 600 125 600 350 P 150 P 60 P 60 P 600 P 600 P 600 P 600 P 150 P 100 P 80 P 80 P 300 P 80 P 300 P 80 P 200 P 60 P 300 P 80 P 300 P 50/60 P 300 P 80 P 100 P 200 P 60 P 300 P 40 P 60 P 60 P 250 P 250 P 150 P 60 P 100 P 60 P 60 P 150 P 80 P 80 P 125 P 100 P 60 P 125 P 60 P 250 P 250 P 60 P 80 P 150 P 60 P 100 P 60 P 60 P 60 P 100 P 80 60 80 P 150 P 100 C 600/400 C 500/500 P 80 P 60 P 80 P 250 C 600/600 C 500/400 C 500/500 C 600/400 C 600/400 P 200 C 600/400 P 60 C 400/500 P 250 C 400/500 P 40 C 400 90 350 90 350 25 175 90 400 30 200 80 20 30 30 30 100 100 80 150 40 40 TUNEL / TUNNEL L=302.10m PS8 PS4 KP4 O 1050/700 L=136.53m L=117.21 m L=291.05 m L=219.59m PS8 L=536.77m L=136.53m MASTER PLAN FOR THE HISTORICAL AREA OF MOSTAR FOR THE PERIOD BETWEEN 2007 AND 2017 REGULACIONI PLAN HISTORIJSKOG GRADSKOG PODRUČJA MOSTAR ZA PERIOD OD 2007. DO 2017. GODINE 1 : 1000 N PERSON IN CHARGE FOR THE PREPARATION OF THE MASTER PLAN (NOSILAC PRIPREME REGULACIONOG PLANA) : FEDERAL MINISTRY FOR SPATIAL PLANNING ( FEDERALNO MINISTARSTVO PROSTORNOG UREĐENJA) MASTER PLAN REALIZED BY ( NOSILAC IZRADE REGULACIONOG PLANA): BIMTAŞ, IMP ISTANBUL COORDINATOR ( KOORDINATOR IZRADE RP ): AHMET AGIRMAN ODGOVORNI PLANER (CHIEF PLANNER) : PROF. DR. IBRAHIM BAZ LEGEND (LEGENDA): MAP (KARTA) INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS) UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA) 16 PHASE (FAZA) PROPOSAL (PRIJEDLOG) INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS) UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA) SCALE (RAZMJERA) 0 25 50 75 100m. P6-A INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS) UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA)

Transcript of KP4 - asgmo.ba

Page 1: KP4 - asgmo.ba

N E R

E T V A

0 25 50 75 100m.

5

PS1

PS2

PS3

PS 4

PS

10

OT11

OT1

OT2

OT3

OT12

OT4

OT5

OT13

OT

OT

6

7

OT

OT

OT

OT

14

8

9

15

OT

OT

16

17

OT2

3

1

4

TP5

TP6

TP

9050

45

200

40

60

125

125

90

90 250

600 10

0

350

600

400

40

200

350

600

200

90

125

90

125

90

300

90

90

125

600

32

350

350

200

350

60

600

125

600

350

P 150

P 60

P 60

P

60

0

P

60

0

P 600

P 600

P

15

0

P 100

P 80

P

80

P

30

0

P 80

P

30

0

P

80

P

20

0

P 60

P

30

0

P 80

P 300

P 50/60

P

30

0

P

80

P 100

P

20

0

P 60

P 300

P 40

P 60

P 60

P 250

P

25

0

P 150

P 60

P 100

P 60

P 60

P 150

P

80

P 80

P 125

P 100

P

60

P

12

5

P 60

P 250

P

25

0

P

60

P 80

P 150

P 60

P 100

P

60

P 60

P 60

P

10

0

P

80

60

80

P

15

0

P

10

0

C 600/400

C 500/500

P

80

P 60

P 80

P 250

C 600/600

C 500/400

C 500/500

C 600/400

C 6

00/4

00

P 2

00

C 600/400

P 60

C 4

00/5

00

P

25

0

C 400/500

P

40

C 400

90

350

90

350

25

175

90400

30

200

80

20

30

30

30

100

100

80

150

40

40

TU

NE

L / T

UN

NE

L

L=

302.1

0m

PS8

PS4

KP4

O 1050/700

L=136.53m

L=117.21 m

L=

291.0

5 m

L=

219.5

9m

PS8

L=

536.7

7m

L=136.53m

MASTER PLAN FOR THE HISTORICAL AREA OF

MOSTAR

FOR THE PERIOD BETWEEN 2007 AND 2017

REGULACIONI PLAN HISTORIJSKOG GRADSKOG

PODRUČJA MOSTAR ZA PERIOD OD 2007. DO 2017.

GODINE

1 : 1000

N

PERSON IN CHARGE FOR THE PREPARATION OF THE MASTER PLAN

(NOSILAC PRIPREME REGULACIONOG PLANA ) :

FEDERAL MINISTRY FOR SPATIAL PLANNING ( FEDERALNO MINISTARSTVO

PROSTORNOG UREĐENJA )

MASTER PLAN REALIZED BY ( NOSILAC IZRADE REGULACIONOG PLANA ): BIMTAŞ, IMP

ISTANBUL

COORDINATOR ( KOORDINATOR IZRADE RP ): AHMET AGIRMAN

ODGOVORNI PLANER (CHIEF PLANNER) : PROF. DR. IBRAHIM BAZ

LEGEND (LEGENDA):

MAP (KARTA)INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS)

UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA)

16

PHASE (FAZA)

PROPOSAL (PRIJEDLOG)

INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS)

UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA)

SCALE(RAZMJERA)

EXISTING SEWER

BOUNDARY OF OLD TOWN CONSERVATION AND DEVELOPMENT AREA

GRANICA STAROG GRADA

POSTOJECA KANALIZACIJA

POSTOJECA KANALIZACIJA, UNAPREDENJE

SEWAGE

PREDLOZENA KANALIZACIONA VEZA

PROPOSED SEWER CONNECTION

POSTOJECE KANALIZACIONO ZAUSCENJE KOJE SE UKLANJA

PROPOSED PUMPING STATION

PREDLOZENA PUMPNA STANICA

PROPOSED SEWAGE CLEANING STATION

PREDLOZENA STANICA ZA CISCENJE

EXISTING WATER MAIN

POSTOJECI GLAVNI VODOVI VODOVODA

POSTOJECI GLAVNI VODOVI KOJE TREBA REKONSTRUISATI

KANALIZACIJA

EXISTING SEWER TO BE UPGRADED

EXISTING SEWER OUTFLOWS TO BE PHASED OUT

WATERVODOVOD

EXISTING WATER MAIN TO BE UPGRADED

PREDLOZENI GLAVNI VODOVI

PROPOSED WATER MAIN

PS

OT

TP

THE MAIN COLLECTOR-VARIANT 2

KAN. KOLEKTOR VARIJENTE 2

SECONDARY COLLECTOR

SEKUNDARNI VOD

CONNECTION POINTS OF SECONDARY COLLECTOR

TAČKE ULAZA NOVOPROJEKTOVANE KANALIZACIJE

VELIKE VODE 1/100

FLOOD WATER LEVEL, RETURN PERIOD 100 y.

KIŠNI PRELIVI

STORM WATER OVERFLOW WEIR

GLAVNE TAČKE ULAZA POSTOJEĆE KANALIZACIJE

MAIN POINTS OF CONNECTIONS OF EXISTING SEWAGE

PUMPING STATION

PUMPNA STANICA

0 25 50 75 100m.

P6-A INFRASTRUCTURE IMPROVEMENTS (WATER AND SEWAGE SYSTEMS)

UNAPREDENJE INFRASTRUKTURE (VODOVOD I KANALIZACIJA)