SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 1 of 22
Project Title : South Pars Gas Field Development Phase -14, Onshore Facilities
Purchase Order No. :
Vendor Name :
Purchase Order Description :
Attendances:
Company Title Name Signature
POGC
POGC
IDRO QA/QC MANAGER M.HAMEDI
IPMIDEPUTY OF QUALITY DEPARTMENT
KUMARS BAKHTIYARI
IPMI QA/QC EXPERT SAJAD SARMASTI
IPMI QA/QC EXPERT M.POURHASHEMI
IPMI
VENDOR
Distribution:
□ Company (Copy)
□ IPMI (Original)
□ VENDOR (Copy)
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 2 of 22
No. Description Action by Due Date
1.1 COMMUNICATION CHANNEL AMONG IPMI QA/QC
DEPARTMENT AND VENDOR FOR IDR TRANSMITTAL :
IPMI:
To: Mr. GHANBARI, HEAD OF QA/QC
Email: [email protected]
Tel:+98-21-29181379
CC :
Email: [email protected]
Tel:+98-21-29181380
CC :
Email: [email protected]
Tel:+98-21-29181307
CC :
VENDOR:
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 3 of 22
No. Description Action by Due Date
2. VENDOR shall submit to IPMI his Quality Assurance Manual
or Quality Assurance Plan for review and Approval before Pre-
Inspection Meeting. If VENDOR is certified under ISO 9001 by
recognized certification body, a copy of Certificate shall be
submitted.
Quality Assurance Manual shall be subject to presentation,
discuss and clarification with IPMI and COMPANY as
necessary, prior to incorporation into contract documents.
IPMI and the TPA reserve the right to audit VENDOR and its
sub-vendor/subcontractors against the purchase requirements
and ISO 9001.
VENDOR
3. VENDOR shall develop their inspection procedure, ITP/QCP
using the attachment - 1 format and any requirements in the
purchase order / MR, and submit the procedures to IPMI for
approval before PIM. VENDOR shall obtain IPMI markup of the
ITP/QCP and its approval.
VENDOR
4. The Company, IPMI and third party reserve the right to witness
or audit the vendor's quality control at VENDOR's facilities
whenever. VENDOR is responsible to provide pertinent permit
and access to do so.
VENDOR ---------
5. When Company, IPMI and/or TPA intend to attends any
inspection at Vendor shop:
VENDOR shall provide the following required items
for the witness inspection and test at his cost.
Latest revision of all vendor documents, DWGs.
All required test equipment and facilities
Furnish the suitable number of qualified
assistants to execute the inspection and/or test.
VENDOR --------------
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 4 of 22
No. Description Action by Due Date
6. Following QA/QC Procedure have been submitted to
VENDOR :
- 14-ONS-QA-PR-0004 : INTERNAL / EXTERNAL QA.
AUDIT PROCEDURE
- 14-ONS-QA-PR-0001 : NON-CONFORMANCE CONTROL
PROCEDURE
- 14-ONS-QC-PR-0019 : INSPECTION PROCEDURE
- 14-ONS-PO-IP-0001: MATERIALS AND EQUIPMENTS
INSPECTION PROCEDURE
IPMI submitted
7. Review Inspection Schedule and Notification
7.1 Monthly Inspection Schedule
VENDOR shall submit Monthly Inspection Schedule using
attachment- 2 formats by the 15th of each month showing the
inspection/test schedule for the next month.
VENDOR ------------
7.2 INSPECTION DISPACH REQUEST (IDR )
Vendor shall submit Application for Inspection to IPMI,
seven(7) days in advance by facsimile or email or any other
appropriate means subject to prior IPMI approval using the
attachment – 3 formats for Hold, Witness & Spot Witness
points described in approved Vendor ITP/QCP.
VENDOR shall never proceed with inspection & test activities
(according to the ITP) designated by Company/Contractor
without advance notice or a written waiver from IPMI.
VENDOR ------------
7.3
Sub vendor List and Suborder Sheet
VENDOR shall submit a list of sub vendors for all purchased
items prior to giving his commitment to suborders using the
attachment – 4 formats for IPMI review.
Sub-Vendors shall be selected in accordance with “POGC
Vendors List”.
VENDOR ---------
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 5 of 22
No. Description Action by Due Date
8. Pre-Inspection Meeting( PIM )
PIM will be held at Vendor’s shop prior to start of fabrication
and after Vendor’s main Drawings, Inspection and Test
Plan/Procedure are submitted and reviewed.
All the QC related documents shall be submitted and reviewed
before starting fabrication (According to Vendor Document
Circulation will be submitted by IPMI)
QA Plan or Manual QA Certificate ISO9001:2008 WPS & PQR with Weld Map Welder’s list Welder Qualifications Material order specification for critical
equipment and materials NDE procedure NDT personnel qualification procedure/List PWHT and/or Heat Treatment procedure Hardness Test Procedure Running/Performance Test Procedure Factory Acceptance Procedure Material Traceability Procedure Surface Painting Procedure Rust Prevention Procedure Packing and Marking Procedure Inspection and Test Plan Vendor document index and schedule Master Schedule for Design, Procurement,
Fabrication, Test, Painting, Packing & Etc. List of Sub-Vendors/Sub Orders And Country
Of Origin Data Sheets DEVIATION AND CLARIFICATION LIST Inspection and test plan (ITP) Inspection and Test Procedure Test Equipment List Catalog or Product Specification Protection and Preservation
VENDOR shall not permit to perform any
activities/fabrication before PIM.
For PIM arrangement, VENDOR shall request IPMI to attend
PIM at Vendor’s shop in advance. After receiving PIM
VENDOR / IPMI
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 6 of 22
No. Description Action by Due Date
attendance request from VENDOR, IPMI will give a notice to
related parties including Company, TPA, etc.
Hold/Witness points by IPMI, Company and/or TPA for
materials shall be finalized / agreed prior to commencement of
fabrication at pre-inspection meetings.
9. Calibration Control
(1) Vendor shall define measurement points, accuracy
and scope of measurement required, and selection of
appropriate equipment and provided equipment.
(2) Vendor shall establish methods of calibration,
adjustment, and interval of calibration. Vendor shall
control equipment by attaching a suitable indicator to
show calibration status, and maintain calibration
record. The equipment shall be subject to re-
calibration when Contractor's inspector deems it
necessary.
(3) TPA’s inspector will review the Vendor's procedure
of calibration of measuring and test equipment.
All instruments shall have current valid calibration certificates.
VENDORDuring
inspection stage
10. Documentations
1
0.1
Material Test Certificate
VENDOR shall prepare and submit all required test
certificates/test reports according to the approved ITP/QCP
and 14-ONS-PO-IP-0001: MATERIALS AND EQUIPMENTS
INSPECTION PROCEDURE which shall be available during
inspection stage.
Only original, “orginal” material test reports (MTR), as per EN
10 204 “3.1” (ISO 10474-3.1 ), from the source of supply shall
VENDORDuring
inspection stage
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 7 of 22
No. Description Action by Due Date
be acceptable from the mill.
10.2 Manufacturer's Certificate of Compliance
VENDOR shall prepare/submit Certificate of Compliance duly
signed by VENDOR QA/QC Manager and his Sub-Vendor
QA/QC Manager using the attachment – 6 Formats to specify
relevant equipment and materials for each purchase order, if
they:
- Conform to Purchase Order requirements,
- Have no irremediable nor injurious defects,
- Have completed necessary fabrication/manufacturing,
inspection and testing work,
- Have completed necessary documentation work,
- Are approved by TPA,s inspector.
VENDOR
For each shipment and after
completion of Vendor
own inspection at the shop and before
final inspection
and issuance of
IRN by inspector
10.3
Non- Conformance Report
VENDOR shall submit a non-conformance application
immediately to IPMI for evaluation and getting approval, if any
non-conformity were found during inspection and tests or
fabrication using the Attachment –8 Format.
Any Non-conformance against project requirements shall be
avoided. But if non-conformance was found as unavoidable,
Vendor shall submit to IPMI for approval during fabrication or
inspection according to the Non-Conformance Control
Procedure (14-ONS-QA-PR-0001).
IPMI shall bring all Non-conformities to the attention of
Company, for its approval along with recommended corrective
action.
When any non-conformance applications are issued, Vendor
shall not proceed with their work until getting written approval
from Contractor & Company against its disposition plan for
VENDOR
If un-avoidable
Non-conformance has been
found
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 8 of 22
No. Description Action by Due Date
resumption. Depending on the nature of non-conformance, and
upon IPMI’s decision and/or Company proposal to clear the
non-conformance, a quality audit may be performed at Vendor
or sub-vendor to verify compliance of the QA program and to
establish reasons for the non-conformance.
10.4
Vendor's Organization Chart
Within two (2) weeks from receipt of IPMI order or letter of
intent Vendor shall submit his project organization chart which
shall include QA/QC organization for the execution of related
work (Head and Shop office), with Vendor's key personnel
within the organization indicated thereon.
- Detailed Organization Chart of VENDOR and Job Title, scope of work and responsibilities of every position of that chart.
-- Name and CV of Personnel for the position shown on the
Chart with indication if on pay roll or from Subsidiary or contracted personnel.
VENDORBefore Pre-Inspection Meeting
10.5 Inspection Records
a) VENDOR is required to compile all the latest approved
drawings and which shall be available to the Company,
IPMI’s and TPA Inspectors during inspection activities at
Vendor /Sub Vendor’s shop.
b) VENDOR shall submit the final "Test Reports" confirming
that the materials/equipment is inspected and tested in
accordance with the relevant Material Requisition and
applicable documents.
Vendor’s Inspection records shall be reviewed and signed by
TPA inspectors when progressive and final witness inspection
was made as per approved vendor ITP/QCP.
VENDOR /IPMI
During inspection
stage
11. NDT Personnel Qualification VENDOR Before PIM
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 9 of 22
No. Description Action by Due Date
All personnel performing NDT functions must be adequately
qualified. The actual certificates shall be reviewed at the
manufacturer works by the inspector.
Note: The manufacturer must bear in mind that the above is
also applicable to all sub-manufacturer.
12. Inspection Release Note(IRN)
The TPA inspector will issue “Inspection Release Note(IRN)”
at the time of final inspection using the attachment – 5 Format
after receiving “Manufacturer's Certificate of Compliance”,
required material certificates and inspection test
certificate/recode in accordance with approved ITP/QCP if all
inspection and tests have been satisfactory completed and the
Inspection Records are acceptable.
TPAAt the time
of final inspection
13. TPA Inspector
TPA inspector will assign and introduce at the time of Pre-
inspection meeting.
IPMI At the time of PIM
14. Pre-Shipment Inspection
1. PSI for all equipment and materials procured shall be
performed by TPA at Vendor’s shop after completion
of packing which is made after satisfactory final
inspection performed by IPMI and TPA.
2. Preparation for Shipment
After approval and before dispatch, each part of the
contract works shall be thoroughly cleaned and
appropriately protected and packed in accordance
with the requirements of carriers and shippers and
suitably for prolonged storage.
Following testing and inspection, prefabricated
materials and non-fabricated materials shall be
IPMI /TPA&
VENDOR
Beforeeach
shipment
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 10 of 22
No. Description Action by Due Date
preserved for shipment and long term outside storage.
Adequate temporary bracing for equipment and
accessories shall be provided to avoid overstressing
or damage during shipping, transportation and
erection, as required.
- VENDOR shall prepare and submit the following
documents with required copies inside the packing
of the package, separately from VDRS based on
MR No. :
- DI- Full package of final drawings.
- Copy of all certificates.- Inspection Release Note (IRN) & Shipping Release
Note(SRN) issued by TPA- Approved packing list.- Spare parts list
3. VENDOR shall submit application for PSI to IPMI and
TPA as project TPA at the same time seven 7 days in
advance subject to prior IPMI’s approval using the
attachment – 8.
4. TPA will check and confirm below at PSI stage.
Quantity check of goods with packing list and item
list in purchase order
Shipping mark
Packing condition
5. Third Party Inspector will issue Shipping Release
Note (SRN) to Vendor and submit a copy to IPMI
using TPA Format.
Note: In case of wooden box packing, do not fix the
wooden plate located on top side.
6. Vendor shall provide below documents at PSI stage.
Vendor’s inspection and test records
IRN issued by TPA
Packing List
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 11 of 22
No. Description Action by Due Date
Purchase Order including item list
7. Vendor shall not proceed with shipping without
"Shipping Release Note" issued by TPA at the time
of inspection.
15. Inspection Certificate (IC)
This document will be issue by TPA, using TPA Formats
according to the L/C terms.
IC will be issue by TPA after issuing:
Inspection Release Note(IRN)
Shipping Release Note (SRN)
And completion of shipping documents.
This certificate will be issue on the security paper with serial
numbers.
Inspection Certificate (IC) issued by TPA shall include in
Manufacturer's Data Record (MDR).
If Required If Required
16. Manufacturer's Data Records (MDR)
VENDOR shall submit Fourteen (14) numbers (1 original +4
CD + 9 Copies) of Manufacturers Data Records (MDR) with
identification and traceability in bookbinding file written in
English within two (2) weeks from the date of the final
inspection.
In addition, Vendor shall submit proposed MDR index/order of
contents in accordance with the data specified in Shop Quality
Control procedure and Supplementary attachment (B) hereto.
As a minimum, the following items shall be included (if
applicable)
- Cover sheet (P.O. No., Item No. and etc.)
- Table of Contents
- Inspection Certificate
- Shipment Release Note
- Inspection Release Note
- Manufacturer's Certificate of Compliance
- Material list
VENDOR
within two (2) weeks from the
date of the final
inspectionMDR index
will be submitted
before PIM
SOUTH PARS GAS FIELD DEVELOPMENT
PHASE 14 N I O C
Pars Oil and Gas CompanyMinutes of kick of Meeting
Vendor : Date: Page 12 of 22
No. Description Action by Due Date
- Mill certificate
- Each inspection NDE/Test record, as specified
- Heat treatment chart, as specified and procedure as
approved by IPMI & TPA
- Pressure test record, as specified and procedure as
approved by IPMI & TPA
- Other inspection and test records as specified
- W PS / PQR's
- NDE Inspection Qualifications
- ITP/QCP
Attachment 1 – Typical/Sample Form of ITP/QCP
N I O C Pars Oil and Gas Company
Inspection and Test Plan/Quality Control Plan
Project : South Pars Gas Field Development Phase 14, Onshore Facilities
Company : P.O. No : Vendor Document No. :
IPMI : Req. No : Date :
Vendor : Sub-Vendor (S) : Rev. No. :
No. ActivityCharacteristic to be Verified
Test Frequency
Reference Procedure
Acceptance Criteria
Verifying Document
Involved Parties
S.V VCM/CL
TPA O
Abbreviation: S.V : Sub Vendor S/
W: Spot Witness V : Vendor R : Document Review
H : Hold Point W : Witness PointCM
: Contractor (MEMBER)N/A
: Not Applicable
TPA : Third Party O : Company (POGC) CL : CONTRACTOR (LEADER)
Page 13 of 22
Attachment 2 - Monthly Inspection ScheduleMonthly Inspection Schedule
Project Title : South Pars Gas Development Phase - 14, Onshore Facilities
P/O No. : Vendor : Doc No. :
Description : P/O Delivery Date : Date :
EST’D Shipping Date : Page : of
Item No.QT’Y(Unit)
Month
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 REMARKS
Remarks:
Abbreviation For Inspection And Test
DI = Dimensional Check LT = Leak Test (Air, Helium) ATR = Air Leak Test On Reinforcing Pad
VI = Visual Inspection AT = Pneumatic Test OST = Over-Speed Test
MI = Material Identification HT = Hydrostatic Test NDT = Non-Destructive Test (RT, UT, Mt And Pt, Etc)
MM = Material Mechanical Test DA = Disassembly Test PI = Painting Inspection, EP = Edge Preparation FT = Performance Test (Functional Test) SP = Shipping Preparation
FU = Fit-Up MRT = Mechanical Running Test H.T = Hardness Test
BC = Back Chipping/ Gauging BAL = Dynamic / Static Balance P.T = Production Test
WQ = Welding Procedure Test ERT = Electrical Resistance Test
WP = Welder Performance Test ECT = Electrical Characteristic Test * Note : Please Specify Any Inspection And Test Item Which
WM = Mechanical Test For WP And WQ PWHT = Post-Weld Heat Treatment Is Not Listed.
Page 14 of 22
Attachment 3 – INSPECTION DISPACH REQUEST (IDR )
South Pars Gas Field Development Phase 14
INSPECTOR DISPATCH REQUEST
To Ariya-SGS Date: IDR No:Attn. Mr.Mousavi Tel No:
Fax. No.:
+9821-66919055+9821-66424748
ReferenceNo.& DATE:
FROM
Vendor: Address :
IPMI To Ariya-SGS:Address: 4th Floor,No.6, Kian St., Saadat abad St., Tehran, IranTel.:Fax.: E-mail: To: CC:
According to the mutual inspection service agreement, you are kindly requested to dispatch your inspector to carry out the inspection services as followsProject South Pars Phases 14 Subproject TOMBAK-ONHSORE FACILITIES
MR. No.P.O No.Material NameInspection Date/TimeName of Vendor/ SubvendorLocation/Address of Inspection Place SubVendor(if any) Tel. No/Fax No. IPMI Contact Person(if needed)/
Tel.No.: Mr.Bahrami -+982129181380Vendor Contact person & Tel. No.
Requested inspection Activities
Subject QTYKind of Inspection Applicable
Drawing/Procedure/standard/…
Responsibilities of the inspector
Inspector shall submit flash reports and visit reports. Flash Reports Shall be submitted immediately.
Visit Reports shall be submitted within 3 days after completion of inspection activities.
Inspector shall apply a suitable marker device to indicate inspected materials
Attachment
Assigned inspector Inspection Report No.Inspection
Inspection Coordinator
Contractor Signature
Date:
Approved:
Sign:
Date:
Page 15 of 22
Attachment 4 - Suborder Status Report
Project : (FOB/CFR/ …..) :
P/O No. : Vendor :
Requisition No. : Person In Charge :
Item No. : TEL No. :
Description : FAX No. :
P/O Delivery Date: : Checked Date :
Description of Sub-Order
Type of Material
Q'TYIssued Date of
B.M.
Vendor's P/O No. &
Order Date
Name & Location of Sub-Vendor
Delivery Date In Vendor's ShopRemarks
REQ'D Current Actual
Page 16 of 22
Attachment 5– Inspection Release Note
INSPECTION RELEASE NOTE N I O C
Pars Oil and Gas Company
No: date: PROJECT TITLE South Pars Gas Field Development Phase 14, onshore facilities project
P/O NO. Vendor Name Report No.
Vendor Person Contacted Inspector Name Date & Place
Purpose : Release for Pre-Shipment Inspection of Order completed ( ), Partial ( ). Estimated Shipping Date :
Note to Vendor
1. This is to certify that the itemized materials have satisfactorily passed inspection and complying with the inspection and test requirements specified in the relative Purchase order.
2. It is understood that nothing contained herein relieves the Vendor of any Purchase Order requirements.
Item NO. (TAG NO.) Item Description PO Q'TY Unit Release Q'TY Balance Q'TY
Certified byInspector’s Name (Sign/ Stamp) Date
Page 17 of 22
Attachment 6 – Manufacturer’s Certificate of Compliance
Manufacturer’s Certificate of Compliance
CERTIFICATE No.
PROJECT TITLE South Pars Gas Development Phase - 14, Onshore Facilities
PURCHASE ORDER No.
This is to certify that the materials and goods listed below have been
inspected and tested in accordance with inspection and test requirements
specified in Purchase Order, conform in all respects to the specifications.
Drawings and other requirements relevant thereto, and have to no
irremediable nor injurious defects.
ITEM NO. /TAG NO. ITEM DESCRIPTION TOTAL Q'TY UnitRELEASE
Q'TYBALANCE
Q'TY
Manufacturer’s Name
Certified by
Vendor’s QA/QC Manager Date
Page 18 of 22
Attachment 7 - Non-Conformance Report
Non-Conformance Report Pars Oil and Gas Company
South Pars Gas Field Development — Phases 14 Onshore FacilitiesNCR No. Rev. Date
1. Non-Conformity With Contract
1.1 Source of Nonconformity*
□ parties/ leader
(NCE)□ Vendor (NCV) □ Construction(NCC) □ Construction Subcontractor (NCSC)
1.2 Contract Reference
□ Agreement Section □ Project Specification Doc Ref □ Contract Requirement Part
2. 2. Subject
Requisition No. Item No. Vendor Name
3. 3. Description of Non-Conformity
Issued by(Sign/date) Reviewed by the QA/QC Manager(Sign/date)4. 4. Corrective Actions Taken to Avoid Non-Conformity
5. 5. Details of Proposed Concession
Benefit To Company (specify which and give details ) □Cost □Quality □Schedule □Other
6. 6. Decision of IPMI Engineering on Proposed remedial actionRework □ Repair □ Reject □ Use-as-is □
Sign/Date by:
7. 7. Company Approval
Accept □ Reject □ Signed By:
Acceptance by Company does not relieve IPMI of Its responsibility for the Quality of work carried out for the project in connection with
this Non- conformity.
8. . Verification
Target Completion Date: Actual Completion Date: Signed (IPMI):
Verification of Completion by Company Date: Signed:
9. . Notes
Page 19 of 22
9-1 Non-Conformity to Include All Back-Up Data, Justification & Proposed Contract Addendum Where Applicable.9-2 NCE = IPMI Engineering Office9-3 NCV = Vendor9-4 NCC = IPMI Construction Office9-5 NCSC = Site Subcontractor9-6 *check ‘x’ in □ as appropriate
Page 20 of 22
Attachment 8– Application for Pre-Shipment Inspection
Pars Oil and Gas Company
APPLICATION FOR PRE-SHIPMENT INSPECTION
OBJECT Project Title SPGD 14/Onshore Facilities Project Shipping Date
P/O NO. Vendor Name
Item No. Commodity/Item Name P/O Q'TY INSP. Q'TY BALANCE Q'ty
* For various Items No., please attach the item list.
APPLICANTSUB-VENDOR If Any PSI Date/Time
PSI Place (Address)
Contact Point
Person In Charge TEL. NO. FAX. NO.
Purchaser’s Final Inspection Performed (IRN) [ ] YES, [ ] NO IRN No.
Photograph Of Packing [ ] YES, [ ] NO
PACKING CONDITIONPacking Style
Packing Size
Packing Q'TY
Others
ATTACHMENT [ ] YES : Packing List
Remarks:
* This application shall be submitted to IPMI and TPA nominated by IPMI at the same time.