Los Angeles County Metropolitan Transportation Authority
Key Project Elements – Status Report presented to the
Corridor Advisory CommitteeSeptember 22, 2016
![Page 2: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/2.jpg)
2
Background
Motion 22.1 elements are grouped into four general categories:
I. Defines those elements to be included in the technical work scope in the I-710 EIR/EIS process [Technical Work Scope Items]
II. Identifies elements that Metro and its partner agencies should consider for mitigation during construction, parallel to the I-710 EIR/EIS process
III. Specifies actions Metro and its partner agencies should take, parallel to the I-710 EIR/EIS process
IV. Defines a set of bicycle alignments that the technical team is to undertake as a study separate from the I-710 EIR/EIS process
![Page 3: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/3.jpg)
Complete by 2016
Integrating Technical Work Scope Items
Scoping(Sept 2008)
Alternative Screening
1st Admin. Draft EIR/EIS
Alts Revisions
and Updated Tech Studies
Draft EIR/EIS
(June 2012)
Prepare Response to Comments& ID Pref.
Alternative
Final EIR/EIS
Define Alts to be Analyzed in RDEIR/SDEIS
Update Technical Studies
(We Are Here)
Circulate RDEIR/SDEIS
for Public Review (Incl.
proposed mitigations)
I-710 Corridor Recirculated Draft EIR Supplemental Draft EIS
Recirculate in 2017*
Completed Summer 2015
Motion 22.1 Technical Work
Scope Items and Analysis
3
![Page 4: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/4.jpg)
Other Elements
Environmental(EIR/EIS)
Phase Construction
Phase
Design / Pre-Construction
Phase
710 Project Opens
I-710 Corridor Project
II.Implement Mitigation
Other Motion 22.1 Elements
III.Additional Studies, Proposals, Policy
Criteria
IV.
Independent Bikeway Projects
Studies & Environmental
Approval4
III.Implement
Local/Targeted Hire Policy and
PLA
II.Identify as Potential Mitigation
II.Develop Detailed
Monitoring, Outreach, Safety
Plans Specific to I-710 Construction
Plans
IV.
Design Phase
IV.
Con-struction
Phase
IV.
Bikeway Projects
Open
Increasing Level of Detail
III.Refinements,
Approvals
![Page 5: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/5.jpg)
5
I. Technical Work Scope Items
Adds the following in the evaluation of Alternatives 5C and 7 within the RDEIR/SDEIS:
• Right-of-way avoidance designs / evaluation (Alternative 7)• Zero Emissions Truck–Only Option for Freight Corridor
(Alternative 7)• Use of best available green construction equipment• Maximize drought-resistant greenscape coverage, stormwater
best management practices [BMPs] and water quality measures
• High frequency Express Bus Transit along I-710• Additional transit service analysis• Upgrades to the existing LA River Bike Path
![Page 6: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/6.jpg)
Included in the evaluation of Alternatives 5C and 7 within the RDEIR/SDEIS [Continued]
• Replacement / enhancement of 28 existing bridges / underpasses to provide access for pedestrians/bikes across the I-710 / LA River
• Construction of at least five new pedestrian/bike bridges /underpasses [reduce remaining gaps]
• Complete Streets treatments embedded within freeway design (overcrossings, ramp termini, intersections)
• Complete Streets treatments for local projects [congested intersections] pursued as part of the I-710 Corridor Project
• Adding transit service on the bus and rail lines serving the I-710 Project Area
• Traffic Control Measures [ITS/TSM/TDM]• Minimize impacts to LA River
6
I. Technical Work Scope Items
![Page 7: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/7.jpg)
Upgrades to the Existing LA River Bike Path
(Alternatives 5C and 7)
![Page 8: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/8.jpg)
Motion 22.1 (J.)
Upgrades to the existing Los Angeles River Bike Path between Ocean Blvd and its northern terminus at SlausonAvenue consisting of safety, landscaping, hardscape, lighting, and access enhancements.
Los Angeles River Bike Path
![Page 9: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/9.jpg)
Approach
• Agency Coordination/ Literature Review
• Field Review
• Examined Ingress/ Egress Locations
• Identified Need for Fix-It Stations
• Identified Safety Concerns
• Assessed opportunity areas for landscaping/ hardscaping improvements.
9
Pavement Rehabilitation Area (Near Willow Street)
Landscape / Hardscape Opportunity Area(Near Randolph St.)
![Page 10: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/10.jpg)
Rehabilitation and Enhancement
• Crack Repair and Slurry Seal96% of length
• Grind and Overlay3.5% of length
• Full Depth Replacement
0.5% of length
Los Angeles River Bike Path
![Page 11: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/11.jpg)
Fix-It Stations
• Fix-It Stations15 Key locations
• Average Distance between Fix-It Stations
1.1 miles
• Longest Gap1.6 miles, between Florence Ave and Atlantic Blvd
![Page 12: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/12.jpg)
Fix-It Stations
![Page 13: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/13.jpg)
Lighting Options
• Design Spacing100 feet (Roughly 54 Light Poles/Mile)
• Lighting TypeSolar LED Pedestrian Lights
![Page 14: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/14.jpg)
Proposed Bike Path Access Points
Potential Access PointsEvaluated = 9
Feasible Access Points:• Chester Place• 23rd Street• Spring Street• 31st Street• Artesia Boulevard• Atlantic Avenue
Infeasible Access Points:• Century Boulevard• South Street• 52nd Street
Existing
Feasible
Infeasible
![Page 15: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/15.jpg)
Example: Infeasible Access Point
52nd StreetImprovements would alter existing terrain within wetlands
52nd
St
Line of Sight View from Bike Path to 52nd Street
Existing Condition: Plan View
![Page 16: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/16.jpg)
31st Street• Existing Ingress / Egress Location• Located Within LA County ROW• No Existing Landscaping• No or Few Obstructions
Existing Condition
Location: 31st Street in the City of Long Beach
Example: Feasible Access Point
![Page 17: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/17.jpg)
17
Landscaping / Hardscaping
Building Blocks for the Bike Path Corridor Theme
![Page 18: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/18.jpg)
18
Landscaping / Hardscaping
Introduce Corridor Theme
![Page 19: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/19.jpg)
Introduce Corridor Theme
Landscaping / Hardscaping
![Page 20: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/20.jpg)
Introduce Corridor Theme
Landscaping / Hardscaping
![Page 21: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/21.jpg)
Introduce Corridor Theme
Landscaping / Hardscaping
![Page 22: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/22.jpg)
Landscaping / Hardscaping
Access Points:
Red Priority Landscape Area = (No Existing Landscaping)
Yellow Priority Landscape Area = Augment Existing Landscaping and Provide Hardscape Improvements
Green Priority Landscape Area = Landscaping and Hardscaping Exist; Requires Corridor Theme
Using Landscaping to Encourage Connections and Accessibility
Along Alignment:
Black = Requires Hardscaping and Corridor Theme
![Page 23: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/23.jpg)
Example: Green Priority Landscape Area
Conceptual Landscape / Hardscape PlanLocation: Slauson Ave. in the City of Vernon
Existing Condition
![Page 24: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/24.jpg)
Example: Yellow Priority Landscape Area
Conceptual Landscape / Hardscape PlanLocation: Randolph Street in the City of Bell
Existing Condition
![Page 25: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/25.jpg)
Example: Red Priority Landscape Area
• Existing Ingress / Egress Location• Located Within LA County ROW• No Existing Landscaping• No or Few Obstructions
Existing Condition
Location: 31st Street in the City of Long Beach
![Page 26: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/26.jpg)
Example: Red Priority Landscape Area
Conceptual Landscape / Hardscape PlanLocation: 31st Street in the City of Long Beach
![Page 27: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/27.jpg)
What’s Next
September:• Develop cross-sections, landscape sketches and treatments• Prepare cost estimates (capital costs, operating &
maintenance costs)
October:• Develop conceptual plan exhibits• Finalize costs and technical data to provide inputs to I-710
RDEIR/ SDEIS.
![Page 28: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/28.jpg)
Look Ahead
![Page 29: Key Project Elements –Status Report · I. Technical Work Scope Items. Upgrades to the Existing LA River Bike Path (Alternatives 5C and 7) Motion 22.1 (J.) Upgrades to the existing](https://reader034.fdocuments.us/reader034/viewer/2022043020/5f3c73f2e907866304433bc0/html5/thumbnails/29.jpg)
Highway Landscaping Concept
Example: Imperial Highway Interchange Area