Kevin O'Malley, Connecting Bristol, INCA Ultra-Connected Cities presentation
-
Upload
independent-networks-co-operative-association -
Category
Travel
-
view
214 -
download
2
Transcript of Kevin O'Malley, Connecting Bristol, INCA Ultra-Connected Cities presentation
Slide 1
Bristol Futures
Future City Team
Gigabit Bristol
Kevin O’Malley, Future City Team Manager, Bristol City Council
Slide 2
Bristol Futures
Future City Team
GB Bristol - Updated Programme & Key Projects
Key Projects
• Growth Hub• Gigabit voucher scheme including Cloud
vouchers• TQEZ duct• Gigabit Fibre R&D showcase overlaid
with RF mesh• Wi-Fi and 4G
4 main work streams
• Demand Stimulation• Fixed Broadband Infrastructure• Wireless Connectivity• Opportunity & Innovation
Slide 3
Bristol Futures
Future City Team
GB Bristol Coverage
Fixed Broadband Infrastructure
• Growth Hub: connected• Vouchers: 4,240 premises “final” mile connectivity• TQEZ duct: 250 premises• R&D testbed (inc. RF mesh): 20+ premises
WiFI, 4G & RF
• 54 business growth areas: 100% coverage• RF mesh: 80% coverage• Cloud service vouchers: 600
Slide 4
Bristol Futures
Future City Team
Smart Spaces• Reducing energy demand in public buildings using ICT
STEEP (Systems Thinking for comprehensive city Efficient Energy Planning )• Better understanding of systems impacting upon energy use including energy supply/
distribution, buildings, digital infrastructure etc
Smart Transport• Linked to remote comms room via B-Net. • Vehicles monitored & signals alter to enhance traffic flow
ICT services for Electric Vehicles• Enables related services to be deployed making use of interconnected infrastructures
e.g. charging points, control centres and vehicles
GB Bristol Supports - Smart City Projects
Slide 5
Bristol Futures
Future City Team
Immediate Next Steps
• Grant funding agreement required• Expect partial agreement by 3rd May which will ensure;
Growth Hub equipment can be purchased/installedBNet survey can start – supports TQEZ duct, R&D testbed inc. RF mesh/ WiFi
• Currently seeking funding agreements for TQEZ duct, R&D testbed inc. RF mesh & Wi-Fi concession.
• Projects are ready to go as soon as agreement(s) signed• Await outcomes of voucher schemes non notification. Potential agreement by
October• Programme ends March 2015
Slide 6
Bristol Futures
Future City Team
Thanks
@ConnectBristol