Page 2: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

2

THE SITE

Page 3: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

3

SOUTH STREET SEAPORT // THE SITE ( OCTOBER 2012)

Page 4: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

4

SOUTH STREET SEAPORT // THE SITE (MARCH 2016)

Page 5: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

5

SOUTH STREET SEAPORT // THE SITE (JULY 2016)

Page 6: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

6

SOUTH STREET SEAPORT // PIER 17 - 2015 APPROVAL

Page 7: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

7

PIER 17

LINK BUILDING

TIN BUILDING HEADHOUSE

SOUTH STREET SEAPORT // PIER 17 - 2013 APPROVAL

Page 8: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

8

SOUTH STREET SEAPORT // PIER 17 DEMOLITION

PIER 17

TIN BUILDING ELIMINATE HEADHOUSE

DEMO OF LINK BUILDING

Page 9: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

9

SOUTH STREET SEAPORT // PIER 17 - 2015 LPC APPROVAL

WEST FACADE

TIN BUILDINGACCESS DRIVE AND

HARDSCAPE ALTERATIONS

Page 10: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

10

RECONSTRUCTED TIN BUILDING

ACCESS DRIVE AND HARDSCAPE

ALTERATIONS

SOUTH STREET SEAPORT // PIER 17 - NEW PROPOSAL

Page 11: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

11

DESIGNTIN BUILDING

Page 12: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

18

1940: The Tin Building’s historic context in the wide expression of South Street. Today, the building is isolated from its historical connections to the street by the FDR (ca. 1954). (NYC MA)

SOUTH STREET SEAPORT // HISTORY

1940: The Tin Building’s historic context in the wide expression of South Street. Today, the building is isolated from its historical connections to the street by the FDR (ca. 1954). (NYC MA)

2012: Flood waters on South Street from Superstorm Sandy.

12

SOUTH STREET SEAPORT // TIN BUILDING // REASON FOR MOVE

Page 13: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

SOUTH STREET SEAPORT // TIN BUILDING // REASON FOR MOVE // 2013 APPROVED SITE CONDITION

ACCESS DRIVE

FEMA 100 YEARFLOODPLAIN(NAVD88 EL 12)

SOUTH ST.ELEVATION4.29’

APPROVEDPIER 17

APPROVEDPIER

17 HEAD HOUSE

FDR DRIVE TIN BUILDING

REFRIGERATION SHED

13

Page 14: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

PIER 17

REMOVED HEAD HOUSE

PIER 17 WEST FACADE

SOUTH STREET SEAPORT // TIN BUILDING // REASON TO RELOCATE THE BUILDING

TIN BUILDING RAISED 1’ ABOVE FEMA 100 YEAR FLOOD PLAIN

FEMA 100 YEARFLOODPLAIN(NAVD88 EL 12)

SOUTH ST.ELEVATION4.29’

FDR DRIVE TIN BUILDING

ACCESS DRIVE

REFRIGERATION SHED

14

Page 15: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

PIER 17

SOUTH STREET SEAPORT // TIN BUILDING // REASON FOR MOVE // PROPOSED SITE CONDITION

15’-11” - 16’-11”

TIN BUILDING(RAISED 1’ ABOVE FEMA 100 YEAR FLOOD PLAIN)

(WE NEED TO MITIGATE AN 8.8’ HEIGHT CHANGE IN 107’FROM SOUTH STREET TO TIN BUILDING)

RAISED 6.07’ (FROM THE EXISTING TIN

BUILDING ELEVATION)

SETBACK 32’-00” (FROM THE EXISTING TIN

BUILDING LOCATION)

107’

FEMA 100 YEARFLOODPLAIN(NAVD88 EL 12)

SOUTH ST.ELEVATION4.29’

ACCESS DRIVE

FDR DRIVE

15

Page 16: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

1" = 50'-0"DSK-012

1BUILD HEADHOUSE + RENOVATE LINK BUILDING

APPROVED SITE PLAN

PIER 16 PIER 16

FULTONPLAZA

LINKBUILDING

FULTONPLAZA

NORTHPORCH

NORTHPORCH

SOUTH STREET SOUTH STREET

PIER 17BUILDING

PIER 17BUILDING

PROPOSED SITE PLAN

NEW CONSTRUCTION

PIERS AND PLATFORMS

HISTORIC DISTRICT LINE

SOUTH STREET SEAPORT // SITE PLAN

FDR DRIVEFDR DRIVE

ACCESS DRIVEPIER 17 HEAD HOUSE

RECONSTRUCTED TIN BUILDING

EXISTINGTIN BUILDING

16

AC

CES

S D

RIV

E

Page 17: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

17

SOUTH STREET SEAPORT // APPROVED + PROPOSED LANDSCAPE MATERIALS

COL.

COL.

COL.COL.

COL.

COL. COL.

COL.

COL.COL.

COL.

COL.

COL.

PIER 17BUILDING NORTH

PORCH

FULTONPLAZA

EAST RIVER ESPLANADE

FULTON MARKET BUILDING

SOUTH STREET

FULT

ON

STR

EET

PIER 16

BEE

KM

AN

STR

EET

AC

CES

S D

RIV

E

SERVICE AREA

ESPLANADE HEX PAVER WOOD DECKING WOOD FURNITURE CONCRETE PAVERBLUESTONEPRECAST CONCRETE PAVER - ROAD

FULTON MARKET BUILDING

SOUTH STREET

FULT

ON

STR

EET

TIN BUILDING

LINKBUILDING

PROPOSED SITE PLANAPPROVED SITE PLAN

COL.

COL.

COL.COL.

COL.

COL. COL.

COL.

COL.COL.

COL.

COL.

COL.

PIER 17BUILDING NORTH

PORCH

FULTONPLAZA

EAST RIVER ESPLANADE

FULTON MARKET BUILDING

SOUTH STREET

FULT

ON

STR

EET

PIER 16

BEE

KM

AN

STR

EET

ACCESS DRIVE

FULTON MARKET BUILDING

SOUTH STREET

FULT

ON

STR

EET

TIN BUILDING

PIER 17PIER 17

Page 18: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

18

PIER 17 // ACCESS DRIVE DESIGN // PROPOSED SITE PLAN

P rem Krishn am ur thyP rem Krishn am ur thyP rem Krishn am ur thyP rem Krishn am ur thy

1799.7111

P rem Krishn am ur thyP rem Krishn am ur thy

WESTERN BORDER OF SOUTH STREET

73

R

RC

M

M

M M M M M M M M M RC

BEE

KM

AN

STR

EET

SOUTH STREET

PIER 16

PIER 17BUILDING

(TAX LOT 10)

4s 5.5s 4s 4.5s 4.5s 4.5s 2s 4s 4.5s 4.5s 5s 5s

4s

4s

C

3s

C

3s

C5s

Tu

2s

TIN BUILDING(TAX LOT 11)

NEW MARKET BUILDING(TAX LOT 14)

C4-6/LM

C6-2A/LM

Primary Building Entrance

Zoning Line/DistrictC4-6

Zoning Lot

3575 Tax Block

Street Direction Arrows

60 Street Width

4s Number of Stories

R ResidentialRC Mixed Commercial/Residential

CommercialCManufacturing/IndustrialMTransportation/UtilityTuPublic Facilities & InstitutionsPfOpen Space/ParkPParking FacilitiesPkgVacant LandV

FULT

ON

STR

EE

T(P

EDE

STR

IAN

ZO

NE

)

US PIERHEAD AND BULKHEAD LINE

Visual Corridor Extents

0' 80' 120' 160'40'

GRAPHIC SCALE

KEY

P

1s

FDR ABOVE

FDR ABOVE

SIGNAL

NOTE: ANY ELEMENTS OUTSIDE THE ZONING LOT ARE SHOWNFOR ILLUSTRATIVE PURPOSES ONLY.ALL ELEVATIONS MARKERS ARE IN MANHATTAN HIGHWAYDATUM, WHICH IS 2.75 FEET ABOVE THE NATIONAL GEODETICSURVEY DATUM OF 1929, MEAN SEA LEVEL, SANDY HOOK, NEWJERSEY.

Beekman Extension

SOUTH STREET

Legal Street BoundaryNon Valid Visual Corridor Extents

32' - 0"

24' -

0"

STAGELOCATION

BIKE LANE

FULTONPLAZA

NORTHPORCH

28' -

4"

29' -

8"

SIGNAL

76' - 1"

87' - 6"

87' - 6"

101' - 1"

83' - 8"

38' - 0"

200'

- 8"

42' - 2"

130' - 6"

34' - 5"

268'

- 8"

360'

- 9"

46' - 2"

263'

- 5"

42' - 2"

130' - 6"

34' - 5"

267'

- 7"

411' - 5"

194' - 10"

316' - 8"

EXISTINGBIKE LANE

MARGINAL STREET EAST RIVER WATERFRONTESPLANADE EXTENSION

LAY-BY LANE

BUS STOP

ACCESS DRIVE

64' -

8"

57' - 6"

20' - 0"

25' -

0"

15' - 0"

35' - 4"

SHoP ARCHITECTS, P.C.

11 PARK PLACE, PENTHOUSENEW YORK, NY 10007

tel 212.889.9005

ARCHITECT

DRAWING TITLE

DRAWING NUMBER

DATE

DRAWN BY

CHECKED BY

PROJECT NO.

THESE DRAWINGS AREINSTRUMENTS OF SERVICE ANDAS SUCH MAY NOT BE USED FOROTHER PROJECTS, FORADDITIONS TO THIS PROJECT ORCOMPLETION OF THIS PROJECTBY OTHERS.

MEP ENGINEER

SCHNACKEL ENGINEERS53 WEST 36TH STREETNEW YORK, NY 10018

212.366.4813tel

tel

STRUCTURAL ENGINEER

BURO HAPPOLD100 BROADWAYNEW YORK, NY 10005

212.334.2025

LIGHTING DESIGNER

L'OBSERVATOIRE INTERNATIONAL120 WALKER STREET 7TH FLOOR EASTNEW YORK, NY 10013

212.255.4463tel

DATE ISSUE/REVISION

DOB NO. 000000000

LANDSCAPE ARCHITECT

James Corner Field Operations475 10th Ave, 10th floorNew York NY 10018

212.433.1450tel

CODE CONSULTANT

Code Consultants Inc215 West 40th Street 15 floorNew York NY 10018

212.216.9596tel

VERTICAL CIRCULATION

Van Deusen and Associates5 Regent StreetLivingston, NJ 07440

973.994.9220tel

SIGNAGE AND IDENTITY

Pentagram200 Fifth AvenueNew York, NY 10010

212.683.7000tel

07.13.14 SUBSTANTIAL COMPLIANCE

02.05.13 ULURP SUBMISSION

02.05.16

06.08.16 MINOR MODIFICATION

NOT FOR CONSTRUCTION

7/15

/201

6 11

:34:

02 A

M

ASK-001

Illustrative SitePlan

101015

Author

Checker

PIE

R 1

789

SO

UTH

STR

EE

TN

EW

YO

RK

, NY

1003

8

1" = 40'-0"ASK-001

1Copy of 00. SITE PLAN -

Page 19: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

1’ 20' - 0" 1’ 16’-3”

ACCESS DRIVE SIDEWALK WOOD DECK

TINBUILDING

TINBUILDING

TINBUILDING

30’-0”

SIDEWALK

1’ 20' - 0" 1’ 16’-3”

ACCESS DRIVE SIDEWALK WOOD DECK

33’-0”

SIDEWALK

36’-0” 1’ 20' - 0" 1’ 16’-3”

ACCESS DRIVE SIDEWALKSIDEWALK HEX PAVERS

SOUTH STREET SEAPORT // HARDSCAPE / ACCESS DRIVE / SECTIONS

SECTION 1

SECTION 2

SECTION 3

1

2

3

19

Page 20: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

TINBUILDING

10’-0” 27' - 5" 12' - 0" 8'-6" - 20’-0”

EAST RIVER ESPLANADE

FDR DRIVE

BIKE LANE SIDEWALK SOUTHSTREET

39’-0”

TIN BUILDING ENTRY SEAT-STEPS

TIN BUILDING

6"

SOUTH STREET SEAPORT // HARDSCAPE / ESPLANADE / SECTION

20

Page 21: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

21

4” CURB

20’

1’

1’

ACCESS DRIVE

SIDEWALK / PLAZA

ESPLANADE

SOUTH STREET SEAPORT // HARDSCAPE // ACCESS DRIVE TYPICAL SECTION

Page 22: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

22

SOUTH STREET SEAPORT // HARDSCAPE // SEATING STEPS

*FDR OMITTED FOR CLARITY

Page 23: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

2321

PIER 17 // GENERAL LANDSCAPE DESIGN // LIGHTING // EXISTING CONDITIONS

APPROX. 16’

APPROX. 25’-30’

SOUTH STREET SEAPORT // LIGHTING // EXISTING CONDITIONS

Page 24: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

24

SOUTH STREET SEAPORT // LIGHTING // PROPOSED

16’

Page 25: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

25

SOUTH STREET SEAPORT // VIEW OF EAST FACADE FROM THE SOUTH

Page 26: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

26

SOUTH STREET SEAPORT // VIEW OF EAST FACADE FROM THE NORTH

Page 27: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

27

SOUTH STREET SEAPORT // VIEW FROM SOUTH STREET

Page 28: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

28

SOUTH STREET SEAPORT // BEEKMAN STREET VIEW

Page 29: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

29

SOUTH STREET SEAPORT // VIEW FROM BEEKMAN STREET AND SOUTH STREET

Page 30: JULY 19, 2016 - nyc.gov · col. c ol. col. c l. c ol. c ol col . c ol. col . col. col . pier 17 building north porch fulton plaza east river esplanade fulton market building t t pier

30

SOUTH STREET SEAPORT // LIST OF ACTIONS

• Modification of 2013 special permits to enlarge the zoning lot and modify the site plan subject to the special permits:

• Waterfront Authorization (ZR Section 62-822(b)): design of waterfront public access areas – to approve new design on the Tin Building site and the former Link Building site.

• Waterfront Certification (ZR Section 62-811): to approve the design for the waterfront public access areas, as modified by the new Authorization.

o Waterfront height and setback special permit (ZR Section 62-834): shift in Pier 17 building;

o Large-scale signage special permit (ZR Section 74-744(c)): Pier 17 Building west façade and Tin Building signage; and