Julius Berger’s piling and geotechnical services
Offshore / onshore soil investigations
Pile driving
Bored piling works
Construction pits
Wall and slope engineering
Well drilling
Testing and monitoring
Julius Berger offers piling and geotechnical engineering services for projects of varying scope and complexity to clients within the Julius Berger group as well as to third parties. The scope of services includes soil investigation, soil improvement, pile driving, bored piling works, wall and slope engineering as well as water well drilling.
Highly specialized engineers and skilled staff apply up-to-date technology, strong logistic capabilities and experience-based knowhow to investigate even the most extreme soil conditions and provide suitable solutions to meet individual project needs.
With extensive experience in Nigeria, the company’s piling and geotechnical specialists are experts in executing complex works for building, infrastructure and industrial construction projects, for both public and private clients.
“Julius Berger offers clients quality solutions for special foundation engineering works”
Piling & Geotechnical Specialists
3
DrillingDry drilling, hammer drilling, wireline coring, hollow auger drilling, inclinometer drilling, extensometer
SamplingDisturbed and undisturbed samples, hammer cores in PVC liner, environmental testing, hard rock sampling with coring
SoundingDynamic Probing Light (DPL), Dynamic Probing Heavy (DPH), Cone Penetration Tests (CPT), Standard Penetration Tests (SPT), settlement testing, compaction testing, slump tests
Julius Berger has the capacity to provide in-depth soil investi-gation including both surface and subsurface exploration, utilizing a variety of specialized approaches.
Geotechnical investigation to obtain information on the physical properties of rock, soil and subsoil prior to execution of works is a critical component to the success of every construction project.
Exploring the underground of a construction site allows the assessment of the subsoil conditions and informs earthwork and foundation design for proposed new structures or repair of distressed structures.
Laboratory testing
Soil classification (USCS)
Sieve analyses of soil samples
Water quality analyses and moisture content tests
Specific gravity and relative density tests
Hydrometer test
Atterberg limits test
Soil Investigation
4
Technical specifications Diameter:
400 mm - 3,000 mm (piles)
400 mm - 1,000 mm (CFA)
Pile length:
max. 47.50 m (piles)
max. 28 m (CFA)
Usage Applied vertically, declined, inclined,
onshore and offshore
Foundation for bridges and buildings
Support of port facilities and construction pit structures
Anchoring systems
To provide foundation support for buildings and other structures, Julius Berger offers a range of displacement piling methods.
Based on individual project requirements, pile driving methods such as vibrating, impact driving and pressing are implemented to install foundation elements by an experienced project team that selects the solution required for the project scope.
Types of displacement piles
Cast-in-situ driven piles
Pre-cast concrete piles
Steel pipes/profiles
Steel sheet piles
Pre-cast concrete sheet piles
Continuous flight auger (CFA) piles
Displacement-injected piles
Displacement Piling
5
Technical specifications Diameter:
600 mm - 2,000 mm (cased)
600 mm - 3,000 mm (uncased)
Pile length:
max. 60 m (cased)
max. 92 m (uncased)
Usage Applied vertically, inclined, onshore
and offshore
Foundation for bridges and buildings
Support of port facilities and construction pit structures
Applicable across various soil types
Replacement piling methods support structures with high structural loads such as retaining walls, foundations of multi-storey buildings or watertight excavation pits. Even under difficult soil conditions, the rotary drilling techniques applied by Julius Berger deliver high performance rates through customizable drilling tools that penetrate obstacles like reinforced concrete, steel or wood.
The result is an opportunity for high performance deep foundation solutions, applicable for a wide range of soil types and suitable for restrictive work environments.
Types of replacement piles
Bored piles: cased rotary drilling with Kelly-System
Bored piles: cased/uncased and slurry-supported rotary drilling with Kelly-System
Large diameter piles by grab excavation
Replacement Piling
6
Retaining systems
Soil nails with or without shotcrete application
Sheet piles
Bored pile walls: tangential, intermittent with intermediate infill, secant
Diaphragm wall
Especially in urban areas, superstructures are often planned with underground floors or carparks and a minimum clear distance to neighbouring structures.
In order to secure a construction pit or slope from collapsing, as well as to protect adjacent structures from possible negative impact, Julius Berger offers wall and slope engineering to implement sufficient retaining systems. Retaining systems are also required for grounds with poor soil properties or high groundwater tables and for quay walls, to resist heavy impact loads and chemical attack.
“Julius Berger plans and supplies high performing retaining systems”
Wall and Slope Engineering
7
Reverse rotary drilling Diameter: max. 1,000 mm
Depth: max. 1,000 m
Direct mud circulation drilling Diameter: max. 400 mm
Depth: max. 400 m
Down-the-Hole (DTH) hammer drilling Diameter: max. 254 mm
Depth: max. 200 m
Dry drilling Diameter: max. 168 mm
Depth: max. 200 m
Julius Berger’s piling and geotechnical specialists are experts in drilling highly productive wells for town and infrastructure water supply projects, including aquifer separations with a proprietary method. In addition, exploration drillings with continuous coring for mineral prospecting is available.
Julius Berger offers holistic well drilling solutions, such as geotechnical measurements to define the ideal location for a water well, design based on international standards, material procurement, manufacturing and installation.
Usage of wells
Groundwater level measurement
Artificial groundwater recharge wells
Exploration core drillings for minerals
Dewatering wells
Regeneration and rehabilitation of existing wells
Well Drilling
8
Load bearing tests Axial static load tests: dead loads,
anchor heads, reaction piles, Osterberg cells
Lateral static load tests
High strain dynamic tests
Integrity tests Low strain integrity tests
Cross hole sonic tests
Ultrasonic inspections
Julius Berger conducts advanced testing and monitoring methods that comply with international and domestic standards.
For optimization and quality assurance of special deep foundation works, pile tests are performed for the evaluation and/or verification of load bearing capacity in relation to the settlement behaviour of a pile. The tests are evaluated to enhance foundation design and/or after pile production for the confirmation of design assumptions.
“State-of-the-art methods ensure compliance with international geo-measurement standards”
Testing and Monitoring
10
For the construction of a cable-stayed bridge, Julius Berger’s piling and geotechnical scope included the foundation of the ramps, the foreshore bridges and the main pylon, as well as testing and monitoring of the special deep foundations works.
Method:
Displacement piling and bored piling, onshore and offshore
531 driven steel piles
Pile diameter: 914 mm
Pile length: up to 45 m
39 bored piles
Pile diameter: 1,524 mm
Pile length: up to 76 m
Equipment:
Liebherr HS 895HD with fixed leader LRH 600 and impacthammer IHC-S150
Liebherr HS 875HD
Manitowoc 4100 SII
Vibro-hammer Müller MS 200 HHF
Lekki-Ikoyi Link Bridge, Lagos
”The challenge of driving 76 m long piles into 18 m deep water in a highly demanding marine environment was mastered by skilled experts using quality equipment”
11
During the construction of a multi-functional stadium complex, Julius Berger’s piling and geotechnical specialists were responsible for the pile foundation of the grandstands.
Method:
Displacement piling
375 CFA piles
Pile diameter: 780 mm
Pile length: up to 21 m
779 precast reinforced concrete piles
Pile dimensions: 350 x 350 mm
Pile length: up to 18 m
Equipment:
Liebherr LRB 255
Fundex F14
Akwa Ibom Stadium Complex, Uyo
“To deliver on the range of required foundation loads for the stadium, several pile types were customized and executed in quick time”
For two large-scale drainage projects, Julius Berger’s piling and geotechnical specialists created the start and finishing shafts, through usage of closed pipe-jacking technology.
Method:
Kelly-drilled secant pile wall
50 bored piles
Pile diameter: 880 mm
Pile length: up to 24 m
Equipment:
Liebherr LRB 255
Trenchless Discharge Drain, Uyo
“The establishment of secant pile walls enabled the construction of a pioneer drainage project, utilizing pipe-jacking technology”
12
For the construction of a 100 m high-rise building, Julius Berger’s geotechnical scope included the production of a watertight construction pit and horizontal jet grouting layer as a water barrier.
Method:
Kelly-drilled secant pile wall, bored piling
205 bored piles
Pile diameter: 1,500 mm
Pile length: up to 63 m
Equipment:
Liebherr LB28 (secant pile wall)
Liebherr HS 855 (grab excavation)
Central Bank of Nigeria, Lagos
“Working in the center of a densely populated megacity required utilization of state-of-the-art low noise and vibration piling methods”
13
“To meet the immediate need for new jetty construction, a king-pile wall with inter-mediate sheet pile walls was effectively installed”
Julius Berger’s geotechnical scope of a jetty construction at Warri Port involved the construction of a combined sheet pile wall in form of a king-pile wall (HZ-Profiles) with intermediate sheet pile walls (AZ-Profiles), anchored with a sheet pile wall.
Method:
HZ-King piling and intermediate piling, offshore; installation of an anchor wall, onshore; complete steel construction works connecting the main wall with the anchor wall
250 HZ piles
Pile dimensions: HZM 880 / HZM 1080
Pile length: up to 28 m
Jetty length: 510 m
Equipment:
Liebherr HS855HD and HS875HD
Vibro-hammer ICE 815
Jetty Construction, Warri Port
14
“Modern equipment is available to offer clients the complete range of piling and geotechnical solutions”
Drilling rig Liebherr LB 44
Operating weight: 173 t
Max. torque: 510 kNm
Engine output: 505 kW
Max. drilling depth: 92 m
Max. drilling diameter cased/uncased: 2.5 m/3.0 m
Drilling rig Nordmeyer DSB 3/30
Operating weight: 28 t
Max. torque: 30 kNm
Engine output: 205 kW
Max. drilling depth: 700 m
Max. drilling diameter cased/uncased: 0.4 m/1.1 m
Drilling rig Liebherr LRB 255
Operating weight: 115 t
Max. torque: 250 kNm
Engine output: 670 kW
Max. drilling depth: 28 m
Max. drilling diameter cased/uncased: 1.8 m/2.2 m
Key Equipment
16
“All equipment is maintained by in-house mechanics according to manufacturers’ guidelines”
CPT-measuring system Shark
Max. technical operational water depth: 25 m
Max. thrust force (CPT rams): 200 kN/pull 250 kN
Sounding rods: 36 mm
Sounding casing: 55 mm
Transportation weight: 26 t
Self-elevating platform “Ilse”
Length over all: 40 m
Width: 20 m
Pontoon depth: 3 m
Allowable deck load: 650 t
Crawler crane Liebherr HS 895 + LRH 600
Operating weight: 172 t
Max. boom length: 84 m
Max. fixed leader length: 50 m
Max. swinging leader length: 60 m
Max. capacity: 65 t
Key Equipment
17
Contact
For more information on Julius Berger‘s geotechnical and piling services contact:
Julius Berger Piling & Geotechnical Specialists
10 Shettima A. Munguno Crescent
Utako 900 108 | Abuja FCT
Phone: +234 803 906 7000
Email: [email protected]
www.julius-berger.com
18