JTLS 5.0

Version Description

Page 2: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 2

• Currently– Contract With JS/J7

• Research and Development – Ends May 2013

– Contract With PACOM Through Booz Allen• Development – Ends April 2013

– Contract With NATO JCW• Development – Completed March 2012

Contract Status

December 2012

Page 3: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 3

• Nothing Definite – But It Is Early– JS/J7 Intends To Extended Contract

• Operations and Maintenance (O&M)• Be Able To Fix Anything• Be Able To Upgrade Anything

– JS/J7 Development SOA Contract• Service For Translation and Scheduling ATO

– Internal Research and Development Work

Future Contracts

December 2012

Page 4: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 4

• Obviously Large Job• Terrain Service

– How To Get The Data• No Problem For U. S. Government Users• Foreign Customers - Combatant Command Access

– Time Consuming and Not Flexible– Limited To Military Customers– Civilian Customers Have No Choice

– Allows Coordinate Terrain Data – JCATS / VBS2

Remove Hex Terrain

December 2012

Page 5: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 5

Remove Hex Terrain

No Restrictions To Tiles

December 2012

Page 6: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 6

Remove Hex Terrain

Nested Tile Restriction

December 2012

Page 7: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 7

• Committed To Network Overlay– Types Of Networks

• Road• River

– May Be In 4.1, If Automated Generation Method Available

• Rail– Already In JTLS, Still No Automated Generation Method

• Air Corridor– Already In JTLS, Still No Automated Generation Method

– Smooth Movement

Remove Hex Terrain

December 2012

Page 8: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 8

• Web Services Manager Uses “ssh”– Connects To Remote Machines– Starts / Stops Processes

• Current Freeware Is No Longer Supported– Need To Find New Capabilbity– Proactive Upgrade

JTLS 2012-11195Update SSH Package

December 2012

Page 9: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 9

• New Version Of TBMCS– Many Of ICC Improvements– Also Accomplish In TBMCS

• Differences Between– Airbase Status– Mission Status– Mission Results

JTLS 2011-10923Improve Link To TBMCS

December 2012

Page 10: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

AmphibOps

Joint Interd

SpecialOps

Joint Urban Ops

Stability Ops

PeaceOps

Interorg CoordDuring Joint Ops

CloseAir Spt

Joint SecurityOps in Theater

InfoOps

SpaceOps

MultinatOps

Joint ForcibleEntry Ops

ForeignInt Def

CounterInsurgency Ops

Deployment &Redeployment Ops

JointLog

Anti-terrorism

Joint CounterdrugOps

Ops inCBRN Envirns

ElectronicWarfare

Military InfoSupport Ops

OpsSecurity

Air MobilityOps

Foreign HumanitarianAssist

Joint EngineerOps

Combating WeaponsMass Destruction

CBRN ConsequenceManagement

Joint AirspaceControl

Civil MilitaryOps

JLOTSJoint Doct LogisticSpt Multinat Ops

Joint CommSystem

Geospatial IntellSpt to Joint Ops

MilitaryDeception

Barriers, Obst, MineWarfare for Joint Ops

Counter-ImprovisedExplosive Device Ops

Sealift Support To Joint Ops

Health ServiceSupport

JTTP for Common-UserLogistics During Joint Ops

DistributionOps

OperationalContract Spt

Joint Electron SpectrumMgmt Ops

JointFire Spt

PersonnelRecovery

Joint Mission Models (JMM)

JointIntel

JointOps

C2 for Joint Air Ops

C2 for Joint Land Ops

C2 for Joint Maritime Ops

JTFHQ

JointTargeting

Joint OpsPlanning

Cyber Ops

Counter Air & Missile

ExecutingPartialFuture Work

NoncombatantEvac Ops

Page 11: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

Quick Review Of Web Site

December 2012 ROLANDS & ASSOCIATES Corporation 11

Page 12: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

What Is Available This Afternoon

December 2012 ROLANDS & ASSOCIATES Corporation 12

Page 13: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 13

• Downstairs In Training Room– New Order Panels– New IMT Freeze Panel– New MSEND Capability– DDS With Map Capability

• Full GDP Functionality Not Available

Demonstrations

December 2012

Page 14: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 14

• Upstairs – Development Conference Area– MUSE Development Testing Demonstrations– They Will Explain What They Have

Demonstrations

December 2012

Page 15: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

ROLANDS & ASSOCIATES Corporation 15

Directions

December 2012

Safeway

Sign Pointing To Del Rey Gardens Drive

Police Station

Page 16: JTLS 5.0 Version Description. Currently –Contract With JS/J7 Research and Development – Ends May 2013 –Contract With PACOM Through Booz Allen Development.

Questions

December 2012 ROLANDS & ASSOCIATES Corporation 16