    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    REVISION DESCRIPTION SHEET

    REV.

    .

    PARA.

    REVISION DESCRIPTION

    A Issued for Comment

    0 Approved for construction

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    3/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    TABLE of CONTENTS

    1.0 SCOPE OF WORK

    1.1 Introduction

    1.2 Scope

    1.3 Project Specific Requirements

    1.4 Scaffolding

    2.0 LIST OF REFERENCE DOCUMENTS

    2.1 Equipment (Vessel, Pump, Compressor, Tank etc) Specif ications

    2.2 Pipe Material Specifications

    2.3 Pipe Fabrication and Installation Specifications

    2.4 Testing and Inspection Requirements

    2.5 Paint ing and Insulation Specifications

    2.6 TCO Procedures

    2.7 General

    2.8 National Standards and Codes

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    4/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.0 SCOPE OF WORK

    1.1 INTRODUCTION

    Tengizchevroil, a joint venture company between Chevron, Exxon-Mobil, Lukoil andKazakhstan government (hereinafter called as COMPANY), intend to upgrade theirexisting Fire Water Systems to make these compliant with current RoK regulationsand to overcome operational problems faced by TCO.

    The existing Firewater (FW) System at Tengiz was originally designed, installed and

    commissioned for KTL-1 in 1990/91. Although the original pumping and pipingsystems remain in service, the system has been expanded and modified toincorporate new on-plot and off-plot facilities. This FW system services variousfacilities in Tengiz complex and also meets the Utility Water (UW) requirements atthese facilities.

    The scope of work of this job pack related to following piping item.

    a) Installing all Piping in Pump House (to include coatings and insulation).b) Piping Tie Ins and relocation of existing and all new installation external to the

    pump house (Utility Water System, Technical Water Storage and TechnicalWater Re-Cycle lines).

    c) Testing of all new piping system.

    The scope of work of the present job pack shall be carried out in conjunction withthe other UW supply lines piping Job Packs and with the works described in thefollowing Job Packs:

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    5/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    order to ensure performance of works in accordance with all appropriate safetynorms.

    1.2.1.3 CONTRACTOR shall develop the demolition work procedure in accordance withSafety Regulations. The procedure is subject to TCO approval.

    1.2.1.4 CONTRACTOR shall comply with all TCO Safety measures and procedures

    1.2.1.5 Before start of any specific work CONTRACTOR shall verify that the inspectionQA/QC plan is prepared according to the specific activity ready to be used by the

    CONTRACTORduring each stage of the specific job. The work shall not be startedwithout COMPANY Site Representative (QA/QC Manager) confirms that theCONTRACTORcan proceed with the construction activities.

    1.2.1.6 CONTRACTOR shall carry out the following preparatory and enabling works ateach location. All inspection packages and CQI Packages are to be prepared inadvance, prior to the start of the construction activities. A Request For Inspection(RFI) will be submitted 24 hrs in advance, to allow the TCO Inspectors to review theinspection package prior to the inspection hold point.

    1.2.1.7 CONTRACTOR shall remove all remaining redundant materials from the site to thestorage area allocated by TCO.

    1.2.1.8 CONTRACTOR shall erect temporary barriers around the construction site. Barriersaround excavations to be at least 1m from excavation edges, where the barriersrestrict access to equipment and stairways an alternative access shall be providedincluding scaffold stairways as necessary and agreed by TCO operations.

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    6/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    Minimum Flow Recycle line shall be provided at tie-in PR05607-001 fromthe UW pumps(G-081A/B) discharge lines to connect to the Raw Water

    supplied from Kulsary.

    Line # 3000-WD-4004-2-150HDPE from existing 8 Potable Water(B1) at Tie-inPR05607-012 to New UW/TW Pump House.

    Line # 3000-VI-4002-1-150H04 from existing 2 Instrument Air Line at Tie-insPR05607-019A/019B to Instrument Manifold in the New UW/TW Pump House.

    Line # 3000-WP-4043-6-150H01-HCW5 from New Technical Water Pump(G-107A/B) to existing line#300-WBL-4000-6-150H03(Scot Cooler) at Tie-inPR05607-042A/B.

    Line # O-000-WF-4022-8 from existing 8 Technical Water Header at Tie-inPR05607-3082A/B to Fire Reel Cabinets in New UW/TW Pump House. The lineshall be commissioned as soon as Pump House building is constructed.

    Tie-ins PR05607-046(New 4 Process Water connection to OBH), Tie-insPR05607-047(New 10 Process Water connection to No.1 TW line to Train 5),Tie-ins PR05607-048(New 10 Process Water connection to No.2 TW line toTrain 5), Tie-ins PR05607-049(New 6 Process Water connection to ChemicalWater treatment shall be provided but those Tie-ins will not be commissioned.

    Existing process water pumps G1/2/3/4 suction lines at Tie-ins PR05607-004/005,existing pump by pass line 3000-WP-4035-8-600H01 at Tie-inPR05607-006,existing line no 300-WBL-4000-6-150H03 to Scot cooler at Tie-insPR05607-045 and existing Pump House demolition work shall be conducted afterUtulity Water system is fully in operational.The demolishing work of existing

    p mp ho se is co ered in job pack JPK 056 07 S 0335 Ne P mps ill be

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    7/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.2.2.5 CONTRACTOR will be responsible for transportation of all the prefabricated pipespools, valves and equipments to site for erection. CONTRACTOR shall ensure that

    all the nozzle flange faces are not damaged during transportation.

    1.2.2.6 CONTRACTOR develop and provide lifting plans for all lifting activities for TCOConstruction approval, prior to start of any lifting activity. The Lifting work shall beperformed in accordance with RoK Document Cranes and Lifting Equipment, TCOSafety Instruction SI 119 and COPSULE Code of practice for Safe use of liftingEquipment.

    1.2.2.7 CONTRACTOR shall provide all equipment and accessories for lifting (such ascranes, slings, shackles, lifting beams, temporary supporting, barricades signageetc) transportation and handling, to facilitate safe, efficient installation of identifiedmaterials from the jobsite.

    1.2.2.8 CONTRACTOR shall pre-fabricate pipe spools as per Isometrics and PipingGeneral Arrangements listed in Attachment Aand standard pipe supports as perTCO Standard Drawings listed in Attachment B and in accordance with TCOSpecification L-ST-2004. The pre-fabricated pipe spools must be permanentlyidentified by means of line number and consecutive spool number. Pre-check of thedimensions on site shall be performed prior to fabrication.

    1.2.2.9 CONTRACTOR shall ensure pre-fabricated pipe spools are protected againstcorrosion, damage or ingression of dirt/foreign matter. This applies especially toflange faces and weld ends. All uncovered outlets are to be sealed up withheavyweight paper or cardboard so that they can be removed easily.

    1 2 2 10 D t t k h ll b i d t d t t P&ID i i l

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    8/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    testing is pure and does not contain suspended solids or other substances.Chlorides shall not exceed 50 ppm. Hydro-test water temperature shall be +5C min.

    to +40C max. The hydro test equipment must be provided with a safety valve of therelevant flow capacity and set pressure exceeding the hydro test pressure at notmore than 10%. Immediately after hydro test water shall be drained and the piping

    shall be dried. Line instruments such as control valves, orifice plates,strainer,indicators,transmitters and flow meter shall be removed before hydrotest

    1.2.2.17 CONTRACTOR on approval from TCO Construction Representative shall installinsulation on associated piping according to isometric drawings and in accordance

    with TCO Specification N-ST-2001.

    1.2.2.18 Existing pipe work shall be demolished as required to allow installation and tie-inof new piping. CONTRACTOR shall remove existing pipe work and install all newtie-in spools and valves as per attached drawings and in accordance with TCOSpec. L-ST-2004 and L-ST-2007. Work to be carried out after existing section of linehas been isolated.

    1.2.3 REINSTATEMENT

    Remove from site all temporary works and unused materials to locationsadvised by TCO Site Representative

    Clear and make good site area

    Any equipment or instrument removed or isolated during hydrostatic test

    h ll b i t ll d

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    9/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.3 PROJECT SPECIFIC REQUIREMENTS

    1.3.1 NatureUse Permit (Emission Payments)

    A) Unless otherwise notified during the bid process, TCO requests the Contractor touse his Republic of Kazakhstan (RoK) approved Nature Use Permit (NUP) coveringthe current calendar year estimated emissions. In compliance with this NUP, theContractor is responsible for payment of any fees associated with emissionsgenerated during the execution of a TCO project. All costs related to late paymentpenalties or interest is for Contractor's account.

    B) Some TCO projects will require the Contractor to apply for a project specific RoKNUP. When applicable, the Contractor will be notified during the bidding process,either by specific instructions in the Job Packs, or other written communication, thata Project specific RoK NUP is required to execute the Project. In these instances,the Contractor shall submit documentation of their Project specific RoK NUP to theTCO Construction Engineer prior to the start of work. Contractor shall provide proofof fee payment(s) at the end of the project, and prior to submitting final invoice for

    works completed. All costs related to late payment penalties or interest is forContractor's account.

    1.3.2 Communication

    Communication to TCO Projects Engineering or Construction EngineeringRepresentatives shall be:

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    10/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    FE-A-JP-0001 Addendum to Standard Job Pack for All Disciplines Latest

    2.1 EQUIPMENT (VESSEL, PUMP, COMPRESSOR, TANK ETC)SPECIFICATIONS

    Specification No. Title Rev.

    All TCO Safety Instructions Latest

    2.2 PIPING MATERIAL SPECIFICATIONS

    Specification No. Title Rev.

    L-ST-2003 Piping Material Classes 9

    L-ST-2003A Piping and Material Classes for SGP / SGI Plant and fieldfacilities

    1

    L-ST-2003B Vent, drain and instrument connection details for SGP / SGIPlant and field facilities.

    0

    2.3 PIPING FABRICATION AND INSTALLATION SPECIFICATIONS

    Specification No. Title Rev.

    L-ST-2004 Piping Fabrication 2

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    11/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    2.6 TCO PROCEDURESSpecification No. Title Rev.

    PRO-056-07-A-0215 PFU Mechanical Completion Checklist Procedure 0

    PRO-056-07-A-0140 PFU Turnover Work Process Procedure 4

    PRO-056-07-A-0182 PFU Red Line As-Built Procedure 1

    PRO-056-07-A-0153 PFU Project Site Engineering Query Procedure (SEQ) 4

    X-000-L-PRO-0001 Procedure for hydrostatic testing of piping system B

    Q001 Documentation Requirements for welding ,PWHT andNDE of piping

    0

    Q002 Qualification of welders 0

    Q003 Receipt Inspections, Storage, Handling and Control of

    Project Material

    1

    _ _ _ _ TCO Welding Procedures Selection Spreadsheet ForKTL Pipe Classes

    Feb2010

    2.7 GENERAL

    Specification No. Title Rev.

    ASME B31.3 Chemical Plant and Petroleum Refinery Piping Latest

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    12/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    SNIP RK 2.02-05-2009 Fire Safety of Buildings and Constructions Latest

    VNTP 3-85 Norms for the Technical Design of Facilities for theCollection, Transport, and Treatment of Oil, Gas andWater at Oil Fields.

    Latest

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    13/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    3.0 ATTACHMENTSATTACHMENT "A"

    Project Drawings (For Construction)

    Drawing No. Rev. No. Drawing Title

    O-3000-L-5329 0 PIPING MATERIAL TAKE OFF. PH.

    O-3000-L-5301 PIPING MATERIAL TAKE OFF. SUPPLY LINES

    O-3000-L-5186 0PIPING GENERAL ARRANGEMENT. UW &TW PUMPSG-081A/B, G-107A/B

    O-3000-L-5187 0PIPING GENERAL ARRANGEMENT. UW &TW PUMPS-SECTIONS.

    O-3000-L-5188 0 PIPING GENERAL ARRANGEMENT. UW &TW PUMPS-SECTIONS.

    O-3000-L-5191 PIPING GENERAL ARRANGEMENT.TECHNICAL &UTILITY WATER LINES

    O-3000-L-5193 PIPING GENERAL ARRANGEMENT.TECHNICALWATER LINES AND TIE-INS

    PIPING GENERAL ARRANGEMENT TECHNICAL

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    14/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    O-3000-L-5246 0 PIPING ISOMETRIC. 3000-WP-4044-8"-150H01-HCW5

    O-3000-L-5247 PIPING ISOMETRIC. 3000-WP-4050-8"-150H01-HCW5

    O-3000-L-5248 0 PIPING ISOMETRIC. 3000-WP-4053-8"-150H01-HCW5

    O-3000-L-5249 0PIPING ISOMETRIC. 3000-WP-4050-10"-150H01-

    HCW5/HDPE

    O-3000-L-5250 0PIPING ISOMETRIC. 3000-WP-4050-10"-150H01-HCW5/HDPE

    O-3000-L-5251 PIPING ISOMETRIC. 3000-WU-4004-8"-150H01-HCW5

    O-3000-L-5252 PIPING ISOMETRIC. 3000-VI-4002-2"-150H04

    O-3000-L-5254 PIPING ISOMETRIC. 3000-WP-4043-6"-150H01-HCW5

    O-3000-L-5255 PIPING ISOMETRIC. 000-WF-4022-3"-150H04-HCW5

    O 3000 L 5256 0 PIPING ISOMETRIC 3000 WP 4043 6" 150H01 HCW5

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    15/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    O-3000-L-5273 0 PIPING ISOMETRIC. 3000-WP-4042-6"-150H01

    O-3000-L-5274 0 PIPING ISOMETRIC. 3000-WU-4002-8"-150H01

    O-3000-L-5275 0 PIPING ISOMETRIC. 3000-WU-4002-8"-150H01

    O-3000-L-5276 0 PIPING ISOMETRIC. 3000-WU-4002-8"-150H01

    O-3000-L-5277 0 PIPING ISOMETRIC. 3000-WU-4002-10"-150H01

    O-3000-L-5278 0 PIPING ISOMETRIC. 3000-WU-4003-8"-150H01

    O-3000-L-5279 0 PIPING ISOMETRIC. 3000-WP-4045-8"-150H01

    O-3000-L-5280 0 PIPING ISOMETRIC. 3000-WP-4040-8"-150H01

    O-3000-L-5281 0 PIPING ISOMETRIC. 3000-WP-4040-8"-150H01

    O 3000 L 5282 0 PIPING ISOMETRIC 3000 WU 4005 8" 150H01

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    16/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    Vendor Drawings (For Construction)

    Drawing No. Rev. No. Drawing Title

    Vendor Drawings (For information)

    Drawing No.Rev. No.

    Drawing Title

    Reference Drawings (For Information)

    Drawing No. Rev. No. Drawing Title

    PLL-056-07-B-0028 0 LINE LIST - UTILITY WATER & TECHNICALWATER SYSTEM

    PHL-056-07-B-0100 0 SWITCH OVER PHILOSOPHY

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    17/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    ATTACHMENT "B"

    TCO Standard Drawings (For Construction)

    Drawing No. Rev. No. Drawing Title

    L-ST-2010 ATT. ASheet A9

    5 S3-10 Standard Clamped Shoe, pipe sizes 8- 24

    L-ST-2010 ATT. ASheet A1

    5 S1-8 Standard Length Welded Shoe

    L-ST-2010 ATT. ASheet A9

    5 S3-14 Standard Clamped Shoe, pipe sizes 8- 24

    L-ST-2010 ATT. ASheet A8

    5 S3-3 Standard Clamped Shoe, pipe sizes - 6

    L-ST-2010 ATT. ASheet A8

    5 S3-4 Standard Clamped Shoe, pipe sizes - 6

    L-ST-2010 ATT. ASheet A8

    5 S3-6 Standard Clamped Shoe, pipe sizes - 6

    L-ST-2010 ATT. ASheet A8

    5 S3-8 Standard Clamped Shoe, pipe sizes - 6

    L-ST-2010 ATT. ASheet A1

    5 S1-6 Standard Length Welded Shoe

    L-ST-2010 ATT. ASheet A1

    5 S1-3 Standard Length Welded Shoe

    L-ST-2010 ATT. ASheet A1

    5 S1-14 Standard Length Welded Shoe

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    18/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    L-ST-2010 ATT. BSheet B1

    5 DA1-8 Directional Anchor for Bare pipes

    L-ST-2010 ATT. CSheet C6

    5 BS2-8 Adjustable Base Supports

    L-ST-2010 ATT. CSheet C6

    5 BS2-6 Adjustable Base Supports

    L-ST-2010 ATT. CSheet C5

    5 BS1-6 Non-Adjustable Base Supports

    L-ST-2010 ATT. CSheet C5

    5 BS1-4 Non-Adjustable Base Supports

    L-ST-2010 ATT. CSheet C5

    5 BS1-2 Non-Adjustable Base Supports

    L-ST-2010 ATT. CSheet C13

    5 BG2-6 Base Guide for Adjustable Support

    L-ST-2010 ATT. CSheet C12

    5 BG1-8 Base Guide for Non-Adjustable Support

    L-ST-2010 ATT. CSheet C10

    5 BA1-4 Base Anchor for Non-Adjustable Support

    L-ST-2010 ATT. BSheet B4

    5 DA2-6 Directional Anchor for Insulated pipes sizes 6- 24

    L-ST-2010 ATT. BSheet B4

    5 DA2-8 Directional Anchor for Insulated pipes sizes 6- 24

    L-ST-2010 ATT. GSheet G16

    5F9-8 Pipe Support foundation for non paved areas for 8",10& 12" trunnions

    L-ST-2010 ATT. BSheet B8

    5 HG1-A Guides for Insulated Horizontal pipes

    L ST 2010 ATT B 5 HG1 B G id f I l t d H i t l i

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    19/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    TCO Standard Drawings (For Information)

    Drawing No. Rev. No. Drawing Title

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    20/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    ATTACHMENT "C"

    Index for Scope of Work

    (1) E-Existing / N-New / R-Refurb ished / -Modified / D-Disinvest

    Mechanical Static Equipment

    Rev. P&ID No Tag No Service N/R/M/D1)

    Rotating Equipment

    Rev. P&ID No Tag No Service N/R/M/D1)

    Piping

    Rev. P&ID No Title / Descr ipt ion System

    Will be completed by Pre-

    Comm/OPS

    E/N

    1)

    0 O-3000-B-5037P&ID. NEW TECH.WATER PUMPS

    N

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    21/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    22/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    ATTACHMENT " E"

    Purchase Orders / Material Requisi tions / MWRs

    PO / MR No. Title / Descript ion Date in Tengiz

    MR-056-07-L-69-1 Isolation Kits for Utility Water PumphouseMR-056-07-L-80-1 Valves for Utulity Water Pump House

    MR-056-07-L-81-1LTCS gaskets and stud-bolts for Utility waterpumphouse

    MR-056-07-L-82-1 LTCS Pipes, flanges and fittings for Utility WaterPump House

    MR-056-07-L-83-1HDPE Pipes and fittings for areas Utility WaterPump House

    MR-056-07-L-84-1 Pipe supports for Utility water PumphouseMR-056-07-L-85-1 Piping Insulation For Utulity Water Pumphouse

    MR-056-07-L-86-1 Painting For Utulity Water Pumphouse

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    23/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    ATTACHMENT " F"

    Mechanical / Piping Datasheets

    Data Sheet Number Rev No. Data Sheet Title

    DS-SP-10153 B DATA SHEET FOR SWING TYPE CHECK VALVE SP-10153

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    24/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    ATTACHMENT "G"

    TCO CoatingSystem

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    25/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    26/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.0

    1.1

    1.2

    1.3

    1.4

    2.0

    2.1 ( ,, , .)

    2.2

    2.3

    2.4

    2.5

    2.6

    2.7

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    27/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.0

    1.1 , , , (- ), , .

    () , -1 1990/1991 . , , . , .

    :

    ) ( ).b) , ( , ).

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    28/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.2.1 1.2.1.1

    - .

    1.2.1.2 , , . , , , - , .

    1.2.1.3 . .

    1.2.1.4 .

    1.2.1.5 , , . ( /)

    .

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    29/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.2.2

    1.2.2.1 , . , . ,

    .

    : , , .

    PR05607-002/003 (G-107A/B,G-081A/B).

    PR05607-001 (G-081A/B) , .

    3000-WD-4004-2-150 8

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    30/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    3000-WP-4035-8-600H01 PR05607-006, 300-WBL-4000-6-150H03 Scot

    PR05607-045 . JPK-056-07-S-0335. , .

    , , , JPK-056-07-L-1761.

    c PHL-056-07-B-0100

    .

    1.2.2.2 , -, , . PRO-056-07-A-0215 PRO-056-07-A-0140

    ( ).

    1.2.2.3 .

    1.2.2.4 ,

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    31/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    "" L-ST-2004. .

    .

    1.2.2.9 , , . . , .

    1.2.2.10 , . O-3000-L-5399.

    1.2.2.11 , ( ) .

    1.2.2.12 W-ST-2000.

    150H01 5%

    1.2.2.13 ,

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    32/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    33/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1.3.

    1.3.1 ( )

    A) , , () () . , , ,

    . , , .

    B) . , ,

    , , . , , . () , . ,

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    34/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    2.0

    FE-A-JP-0001

    2.1 ( ,

    , , .)

    .

    .

    2.2

    .

    L-ST-2003 9

    L-ST-2003A /

    1

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    35/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    W-ST-2025

    0

    2.5 ( )

    .

    X-ST-2000 6

    N-ST-2001 , 2

    2.6

    .

    PRO-056-07-A-0215

    0

    PRO-056-07-A-0140 4

    PRO-056-07-A-0182

    1

    PRO-056-07-A-0153 (SEQ)

    4

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    36/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    O-ST-2011

    0

    056-07-PRG-A-0001 . 1 0

    056-07-PRG-A-0002 . 2

    0

    056-07-PRG-A-0003 . 3

    0

    2.8

    .

    K 3.05-09-2002

    .

    K 1.03-05-2001

    .

    K RK 5.04-18-2002

    .

    K 2.02-05-2009 .

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    37/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    3.0

    "A"

    ( )

    .

    O-3000-L-5329 0 ..

    O-3000-L-5301 .

    O-3000-L-5186 0 . . G-081A/B, G-107A/B

    O-3000-L-5187 0 . .

    .

    O-3000-L-5188 0 . . .

    O-3000-L-5191 . .

    O-3000-L-5193 .

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    38/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    O-3000-L-5246 0 . 3000-WP-4044-8"-150H01-HCW5

    O-3000-L-5247 . 3000-WP-4050-8"-150H01-HCW5

    O-3000-L-5248 0 . 3000-WP-4053-8"-150H01-HCW5

    O-3000-L-5249 0 . 3000-WP-4050-10"-150H01-HCW5/150HDPE

    O-3000-L-5250 0 . 3000-WP-4050-10"-150H01-HCW5/150HDPE

    O-3000-L-5251 . 3000-WU-4004-8"-150H01-HCW5

    O-3000-L-5252 . 3000-VI-4002-2"-

    150H04

    O-3000-L-5254 . 3000-WP-4043-6"-150H01-HCW5

    O-3000-L-5255 . 000-WF-4022-3"-150H04-HCW5

    O-3000-L-5256 0 . 3000-WP-4043-6"-

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    39/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    O-3000-L-5273 0 . 3000-WP-4042-6"-150H01

    O-3000-L-5274 0 . 3000-WU-4002-8"-150H01

    O-3000-L-5275 0 . 3000-WU-4002-8"-150HCW5

    O-3000-L-5276 0 .. 3000-WU-4002-8"-150H01

    O-3000-L-5277 0 . 3000-WU-4002-10"-150H01-HCW5

    O-3000-L-5278 0 . 3000-WU-4003-8"-150H01

    O-3000-L-5279 0 . 3000-WP-4045-8"-

    150H01

    O-3000-L-5280 0 . 3000-WP-4040-8"-150H01

    O-3000-L-5281 0 . 3000-WP-4040-8"-150H01

    O-3000-L-5282 0 . 3000-WU-4005-8"-

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    40/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    ( )

    .

    ( )

    .

    ( )

    .

    PLL-056-07-B-0028 0 - . .

    PHL-056-07-B-0100 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    41/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    "B"

    ( )

    .

    L-ST-2010 ATT. ASheet A9

    5S3-10 , 8- 24

    L-ST-2010 ATT. ASheet A1

    5 S1-8

    L-ST-2010 ATT. ASheet A9

    5S3-14 , 8- 24

    L-ST-2010 ATT. ASheet A8

    5S3-3 , - 6

    L-ST-2010 ATT. ASheet A8

    5S3-4 , - 6

    L-ST-2010 ATT. ASheet A8

    5 S3-6 , - 6L-ST-2010 ATT. ASheet A8

    5S3-8 , 8- 24

    L-ST-2010 ATT. ASheet A1

    5 S1-6

    L-ST-2010 ATT. ASheet A1

    5 S1-3

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    42/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    L-ST-2010 ATT. BSheet B8

    5HG1-14

    L-ST-2010 ATT. BSheet B1 5 DA1-8

    L-ST-2010 ATT. CSheet C6

    5 BS2-8

    L-ST-2010 ATT. CSheet C6

    5 BS2-6

    L-ST-2010 ATT. CSheet C5

    5 BS1-6

    L-ST-2010 ATT. CSheet C5 5 BS1-4

    L-ST-2010 ATT. CSheet C5

    5 BS1-2

    L-ST-2010 ATT. CSheet C13

    5BG2-6

    L-ST-2010 ATT. CSheet C12

    5BG1-8

    L-ST-2010 ATT. CSheet C10 5 BA1-4

    L-ST-2010 ATT. BSheet B4

    5DA2-6 6" - 24"

    L-ST-2010 ATT. BSheet B4

    5DA2-8 6" - 24"

    L-ST-2010 ATT. GSheet G16

    5F9-8 8, 10 12

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    43/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    L-ST-2010 ATT. ESheet E17

    5 P26-B2

    ()

    .

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    44/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    "C"

    -

    (2) C- / H- / - / - / B-

    . / 2)

    . /

    2)

    . (

    )

    2)

    0 O-3000-B-5037.

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    45/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    1 O-000-B-5015. . -.

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    46/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

    "D"( - )

    -

    ( ,

    )

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    47/245

    MECHANICAL AND PIPING JOB PACK JPK 056 07 L 1754 REV 0

    "E"

    / /

    PO / MR /

    MR-056-07-L-69-1

    MR-056-07-L-80-1

    MR-056-07-L-81-1

    MR-056-07-L-82-1,

    MR-056-07-L-83-1

    MR-056-07-L-84-1

    MR-056-07-L-85-1

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    48/245

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    49/245

    C C G JO C J 056 0 5 0

    "G"

    MECHANICAL AND PIPING JOB PACK JPK-056-07-L-1754 REV-0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    50/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    51/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    52/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    53/245

    MTO REVI-

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    54/245

    MTO REVI

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    ISOMET- 285

    284

    283

    265

    286

    277

    279

    269

    270

    282

    281

    288

    287

    268

    280

    278

    272

    275

    276

    274

    267

    266

    271

    273

    RIC

    NoITEM

    No

    STOCK

    CODELENGTH

    UNIT

    1 EA 1 1 1 1 2 1

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    150H01

    8" SWING TYPE CHECK VALVE A352LCB CL150 SRF STDF B16.34 316PLT7 (SP-10153)

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    " I

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    O-3000-L-

    DESCRIPTION

    3 EA 1 1 3

    4 EA 1 1 1 1

    5 EA 4 2 3 2 1 2 3 3 2

    6 EA 4 1 7 EA 3

    12" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    4" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    8" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    6" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    14" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    I . ( - )

    8 EA 1 1 1 4 4 3 1 4 3 1 4 4 2 3 3

    9 EA 2 2 2 2 2 2 2

    10 EA 1

    11 EA 1

    3/4" GATE VALVE SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW

    1/2" GATE VALVE SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW

    3" GATE VALVE FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    150H04

    4" GLOBE VALVE PLGDSRS A352LCB CL150 RF STDF B16.34/API6 OBB TRM12 HW

    12 EA 1

    13 EA 1 13/4" GATE VALVE SLDWDGIS A350LF2 CL.1 CL800 SW API6020 BB TRM12 HW

    3/4" GATE VALVE SLDWDGRS A350LF2 CL.1 CL800 SW FNPT API602 OBB TRM12 HW

    MTO REVI-0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    55/245

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    ISOMET-

    I -5273

    -5272

    -5281

    -5285

    -5277

    -5274

    -5271

    -5278

    -5286

    -5282

    -5280

    -5288

    -5283

    -5284

    -5287

    -5276

    -5275

    -5269

    -5270

    -5279

    -5265

    -5268

    -5267

    -5266

    I

    NoITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT

    1 EA 4 4 4

    2 EA 4 4 4 4

    O-3000-L

    O-3000-L

    12"GASKET SPWND 316L-FG 1/8"SSSS CL150 B16 20 B165 LS

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    DESCRIPTION O-3000-L

    O-3000-L

    150H01

    O-3000-L

    14" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    O-3000-L

    3 EA 10 7 3 8 8 7 2 10 7 6 7

    4 EA 2

    5 EA 1 2 1 1 10 3 1 1

    6 EA 1 1 1 1 7 EA 4 1 7

    , , , , , . , . ,

    6" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    5" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    8" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS

    " "

    8" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    9 EA 2

    10 EA 2 2 2 8 8 6 2 8 6 2 8 8 4 6 6

    11 EA 4 4 4 4 4 4 4 1/2" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    , , - , / , , . , . ,

    3/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    1 1/2" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS

    150H04

    12 EA 2

    13 EA 13/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    3" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    MTO REVI-0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    56/245

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    ISOMET-

    RIC -5272

    -5279

    -5285

    -5287

    -5266

    -5280

    -5268

    -5271

    -5265

    -5269

    -5288

    -5278

    -5274

    -5286

    -5275

    -5276

    -5282

    -5283

    -5277

    -5281

    -5284

    -5270

    -5267

    -5273

    I

    No

    ITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT

    1 EA 12 12

    2 EA 24 24 48

    M27x160LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    O-3000-L

    O-3000-L

    DESCRIPTION O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    150H01

    O-3000-L

    M27x130LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    3 EA 12 12 12 12

    4 EA 24

    5 EA 24 24 12 24

    6 EA 8 8 8 8

    7 EA 32

    8 EA 80 32 40 24 64 8 40 16 64 56 48 40 16

    M24x140LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M24x150LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M24x120LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M20x135LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M20x115LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M20x110LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    9 EA 8 16 8 8 80 24 8 8

    10 EA 8 8 8 8

    11 EA 8

    12 EA 8 56

    13 EA 8 8 8 32 32 24 8 32 24 8 32 32 16 24 24

    EA

    M20x95LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M16x90LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M14x65LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    ,

    M20x100LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M20x90LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M14x60LGSTUD-BOLT A320GR L7M/A194GR 7MNUTS

    15 EA 8

    16 EA 4M14x65LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    150H04

    M16x90LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    ,

    MTO REVI-

    SION NO0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    57/245

    SION NO

    ISOMET-

    I5266

    5267

    5269

    5277

    5279

    5268

    5283

    5284

    5285

    5282

    5278

    5288

    5286

    5287

    5274

    5280

    5270

    5265

    5271

    5273

    5272

    5281

    5275

    5276

    I

    NoITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT

    1 EA 2

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    DESCRIPTION O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    STANDARD PIPE SUPPORT S3-10"

    I " A 1

    3 EA 1 4 1

    4 EA 1

    5 EA 2 2 2

    6 EA 1 1 1 7 EA 1 STANDARD PIPE SUPPORT P41-E4

    STANDARD PIPE SUPPORT S1-14"

    STANDARD PIPE SUPPORT S1-6"

    STANDARD PIPE SUPPORT P42-C2

    STANDARD PIPE SUPPORT S1-3"

    I -

    8 EA 1 1

    9 EA 2 3 2 1

    10 EA 1 2

    11 EA 2 4 5 4 2 5 2 2

    12 EA 2 2 1

    STANDARD PIPE SUPPORT P41-E2

    STANDARD PIPE SUPPORT P41-D3

    STANDARD PIPE SUPPORT P41-D4

    I

    STANDARD PIPE SUPPORT P41-E3

    STANDARD PIPE SUPPORT P41-D2

    14 EA 1

    15 EA

    16 EA 1 3

    17 EA 1 1 1 1 2 1

    18 EA 1

    STANDARD PIPE SUPPORT P21-C1

    STANDARD PIPE SUPPORT HG2-8"

    STANDARD PIPE SUPPORT HG1-14"

    STANDARD PIPE SUPPORT P41-A1

    STANDARD PIPE SUPPORT P21-C2

    I -

    19 EA 1 2

    20 EA 1 1 1 1

    21 EA 1 1 2 1 1

    22 EA 4 1 1 1

    23 EA 4 1 1 1 STANDARD PIPE SUPPORT BS1-4"

    STANDARD PIPE SUPPORT BS2-6"

    STANDARD PIPE SUPPORT BS1-6"

    STANDARD PIPESUPPORTBS1-2"

    STANDARD PIPE SUPPORT BS2-8"

    STANDARD PIPE SUPPORT DA1-8"

    25 EA 1 1

    26 EA 1 1

    27 EA 1

    28 EA 1

    29 EA 1

    STANDARD PIPE SUPPORT BG2-6"

    2" PIPE A333-6, SMLS, XS, BBE (L=0.7m)

    2" PIPE A333-6, SMLS, XS, BBE (L=1m)

    I

    STANDARD PIPE SUPPORT BA1-4"

    STANDARD PIPE SUPPORT BG1-8"

    31 6" PIPE A333-6, SMLS, STD WT, BBE (L=0.6m) EA 2 1 1 1

    32 6" PIPE A333-6, SMLS, STD WT, BBE (L=0.5m) EA 2

    33 6" PIPE A333-6, SMLS, STD WT, BBE (L=0.4m) EA 4 1

    34 4" PIPE A333-6, SMLS, STD WT, BBE (L=0.3m) EA 4 1 1 1

    35 8" PIPE A333-6, EA 1 1 1 1

    36 STANDARD PIPE SUPPORT F8N-2 EA 1 1 1

    MTO REVI-

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    58/245

    SION NO

    ISOMET-

    I5265

    5266

    5267

    5268

    5269

    5270

    5271

    5272

    5273

    5274

    5275

    5276

    5277

    5278

    5279

    5280

    5281

    5282

    5283

    5284

    5285

    5286

    5287

    5288

    I

    NoITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT

    1 LITRES 0.9 1.8 2.0 0.9 5.2 2.2 4.5 2.0 1.5 0.8

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    O-3

    000-L-

    DESCRIPTION

    "AD" SYSTEM

    LOW TEMPERATURE CURE HIGH SOLIDS EPOXY (2-COATS)

    2 LITRES 2.4 2.4 2.1 2.5 2.6 3.0 1.5 4.0 1.7 0.5 1.5 0.5 1.7 1.1 2.3 2.4 1.4 1.3 1.9 0.8 0.9 1.3 0.1

    3 LITRES 4.2 4.2 3.7 4.4 4.5 5.2 2.7 7.0 3.0 1.0 2.6 0.9 3.0 1.9 3.9 4.2 2.5 2.2 3.4 1.5 1.6 2.3 0.1

    4 LITRES 1.8 1.8 1.6 1.9 1.9 2.2 1.1 3.0 1.3 0.4 1.1 0.4 1.3 0.8 1.7 1.8 1.1 1.0 1.4 0.6 0.7 1.0 0.1

    TIE-COAT (POLYAMIDE EPOXY(HIGH BUILD))

    TOPCOAT (ALIPHATIC POLYURETHANE)

    "CA" SYSTEM

    PRIMER (ZINC RICH EPOXY)

    PAINT QUANTITY IS WITH 100% MARG

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    59/245

    .

    . . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    / . .

    O-3

    000-

    L-5

    283

    O-3

    000-

    L-5

    284

    O-3

    000-

    L-5

    287

    O-3

    000-

    L-5

    288

    O-3

    000-

    L-5

    286

    O-3

    000-

    L-5

    273

    O-3

    000-

    L-5

    274

    O-3

    000-

    L-5

    275

    O-3

    000-

    L-5

    276

    O-3

    000-

    L-5

    282

    O-3

    000-

    L-5

    277

    O-3

    000-

    L-5

    278

    O-3

    000-

    L-5

    279

    O-3

    000-

    L-5

    280

    O-3

    000-

    L-5

    281

    O-3

    000-

    L-5

    285

    O-3

    000-

    L-5

    271

    O-3

    000-

    L-5

    272

    O-3

    000-

    L-5

    265

    O-3

    000-

    L-5

    266

    O-3

    000-

    L-5

    269

    O-3

    000-

    L-5

    270

    O-3

    000-

    L-5

    267

    O-3

    000-

    L-5

    268

    1 2.5 4.0 9.0

    2 1 1. 3 1 1.0 1 0. 3 1 1.3

    3 12.0

    4 22.0 16.7 12.5 3.0 8.2 9.5 6.0 12.5 19.2 8.0 7.0

    5 1.3 11.0 29.0 14.0 9.0

    6 4.0

    8" A333-6, SMLS, SCH 20, BBE

    6" A333-6, SMLS, STD WT, BBE

    4" A333-6, SMLS, STD WT, BBE

    10" A333-6, SMLS, SCH 20, BBE

    12" , A333-6, SMLS, SCH 20, BBE

    14" A333-6, SMLS, SCH 10, BBE

    7 0.3

    8 0.2 0.2 0.2 0.8 0.7 0.6 0.2 0.4 0.6 0.2 0.8 0.8 0.4 0.6 0.6

    9 18.2

    10 34 .0 2 .02" A333-6, SMLS, XS, BBE

    4" -

    3" A333-6, SMLS, STD WT, BBE

    1 1/2" A333-6, SMLS, XS, PE

    3/4" , A333-6, SMLS, XS, PE

    150H04

    . . . - , , ,

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    60/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    61/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    / . .

    000-L-5287

    000-L-5288

    000-L-5281

    000-L-5282

    000-L-5283

    000-L-5284

    000-L-5285

    000-L-5286

    000-L-5275

    000-L-5276

    000-L-5277

    000-L-5278

    000-L-5279

    000-L-5280

    000-L-5269

    000-L-5270

    000-L-5271

    000-L-5272

    000-L-5273

    000-L-5274

    000-L-5265

    000-L-5266

    000-L-5267

    000-L-5268

    1 2 2 4

    2 1 1

    3 1 1 1 1 12" WN FLANGE, A350LF2 CL.1 CL150, SCH 20, RF, STDF, B16.5

    "

    150H01

    14" WN FLANGE, A350LF2 CL.1 CL150, SCH 10, RF, STDF, B16.5

    14" FLG WN, A350LF2 CL.1 CL150, SCH 10, RF, STDF, B16.5 C/W

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    5 1 1 1 1

    6 1

    7 9 5 3 8 1 5 2 8 8 6 5

    8 2

    9 1 1 1 1

    , . , , , , . /

    12" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.5

    10" WN FLANGE A350LF2 CL.1 CL150 SCH 20 RF STDF B16.5

    8" WN FLANGE, A350LF2 CL.1 CL150, SCH 20, RF, STDF, B16.5

    8" WN FLANGE, A350LF2 CL.1 CL300, SCH 20, RF, STDF, B16.5

    8" FLG WN, A350LF2 CL.1 CL150, SCH 20, RF, STDF, B16.5 C/W JACKSCREWS

    10 2

    11 1 2 1 1 8 3 1 1

    12 2

    13 1 7

    14 4

    15 4 2

    6" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.5

    4" WN FLANGE, A350LF2 CL.1 CL150, STD WT, RF, STDF, B16.5

    4" WN FLANGE, A350LF2 CL.1 CL300, STD WT, RF, STDF, B16.5

    3" WN FLANGE, A350LF2 CL.1 CL300, STD WT, RF, STDF, B16.5

    6" WN FLANGE, A350LF2 CL.1 CL150, STD WT, RF, STDF, B16.5

    8" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.5

    16 2

    17 1 1 1 4 4 3 1 4 3 1 4 4 2 3 3

    18 1 2 1 1 2 1 1

    19 1 1 1 4 4 2 1 2 2 2 3 2 2 2 220 2 2 2 2 2 2 2

    3/4" FLANGE BLD, A350LF2 CL.1 CL150, RF, STDF, B16.51/2" SW FLANGE, A350LF2 CL.1 CL150, XS, RF, STDF, B16.5

    "

    3/4" SW FLANGE, A350LF2 CL.1 CL150, XS, RF, STDF, B16.5

    3/4" FLANGE THRD, A350LF2 CL.1 CL150, RF, STDF, B16.5

    1 1/2" SW FLANGE, A350LF2 CL.1 CL300, XS, RF, STDF, B16.5

    22 3

    23 13/4" SW FLANGE, A350LF2 CL.1 CL150, XS, RF, STDF, B16.5

    , . , , , .

    150H04

    3" WN FLANGE, A350LF2 CL.1 CL150, STD WT, RF, STDF, B16.5

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    62/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    / . . 0-L-5282

    0-L-5283

    0-L-5284

    0-L-5288

    0-L-5285

    0-L-5286

    0-L-5287

    0-L-5276

    0-L-5277

    0-L-5278

    0-L-5279

    0-L-5280

    0-L-5281

    0-L-5265

    0-L-5266

    0-L-5267

    0-L-5268

    0-L-5269

    0-L-5270

    0-L-5271

    0-L-5272

    0-L-5273

    0-L-5274

    0-L-5275

    1 1 1 1 1 2 12 1

    3 1 1 3 14" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    150H01

    O-30

    O-30

    O-30

    8" SWING TYPE A352LCB CL150 SRF STDF B16.34 316PLT7 (SP-10153)

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    6" SWING TYPE A352LCB CL150 SRF STDF B16.34 316PLT7 (SP-10153)

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    4 1 1 1 1

    5 4 2 3 2 1 2 3 3 2

    6 4 1

    7 3

    8 1 1 1 4 4 3 1 4 3 1 4 4 2 3 3

    9 2 2 2 2 2 2 2

    6" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    4" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    3/4" SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW

    1/2" SLDWDGIS A350LF2 CL.1 CL150 RF STDF API602 OBB TRM12 HW

    12" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    8" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    10 1

    11 1

    12 1

    4" PLGDSRS A352LCB CL150 RF STDF B16.34/API6 OBB TRM12 HW

    150H04

    3/4" SLDWDGRS A350LF2 CL.1 CL800 SW FNPT API602 OBB TRM12

    " I F I

    3" FLXWDGRS A352LCB CL150 RF STDF API600 OBB TRM12 HW

    I . I

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    63/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    / . . 0-L-5284

    0-L-5285

    0-L-5286

    0-L-5287

    0-L-5288

    0-L-5278

    0-L-5279

    0-L-5280

    0-L-5281

    0-L-5282

    0-L-5283

    0-L-5272

    0-L-5273

    0-L-5274

    0-L-5275

    0-L-5276

    0-L-5277

    0-L-5268

    0-L-5269

    0-L-5270

    0-L-5271

    0-L-5265

    0-L-5266

    0-L-5267

    1 4 4 4 2 4 4 4 4

    3 10 7 3 8 8 7 2 10 7 6 7

    12" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    150H01

    14" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    8" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    4 2

    5 1 2 1 1 10 3 1 1

    6 1 1 1 1

    7 4 1 7

    8 4 2

    9 2

    6" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    5" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    3" , SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS

    1 1/2" , SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS

    8" , SPWND, 316L-FG, 1/8"SSSS, CL300, B16.20, B16.5, LS

    10 2 2 2 8 8 6 2 8 6 2 8 8 4 6 6

    11 4 4 4 4 4 4 4

    12 2

    150H04

    3" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    3/4" SPWND 316L-FG 1/8"SSSS CL150 B1620 B165 LS

    3/4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    1/2" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    , , , , , , ,

    , , , , , . , . ,

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    64/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    65/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    /

    . .

    3000-L-5284

    3000-L-5285

    3000-L-5286

    3000-L-5272

    3000-L-5273

    3000-L-5282

    3000-L-5283

    3000-L-5287

    3000-L-5288

    3000-L-5270

    3000-L-5271

    3000-L-5278

    3000-L-5279

    3000-L-5280

    3000-L-5281

    3000-L-5274

    3000-L-5275

    3000-L-5276

    3000-L-5277

    3000-L-5266

    3000-L-5267

    3000-L-5268

    3000-L-5269

    3000-L-5265

    1 2

    2 1 3 1 4 1

    4 1

    O-

    O-

    O-

    O-

    O-

    S1-8"

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    O-

    S1-3"

    S3-10"

    S1-6"

    5 2 2 2

    6 1 1 1

    7 1

    8 1 1

    9 2 3 2 1

    P41-E3

    P41-E2

    S1-14"

    P42-C2

    P41-E4

    2 2 4 5 4 2 5 2 2

    12 2 2 1

    13 1

    14 1

    15

    P41-D2

    -

    P41-D3

    P41-B2

    P21-C2

    P41-A1

    16 1 3

    17 1 1 1 1 2 1

    18 1

    19 1 2

    20 1 1 1 1

    21 1 1 2 1 1

    DA1-8"

    BS2-8"

    BS2-6"

    P21-C1

    HG2-8"

    HG1-14"

    22 4 1 1 1

    23 4 1 1 1

    24 1 1

    25 1 1

    26 1 1

    27 1 BA1-4"

    BG2-6"

    BS1-6"

    BS1-4"

    BS1-2"

    BG1-8"

    28 1

    29 1 1

    31 6" A333-6, SMLS, STD WT, BBE (L=0.6m) 2 1 1 1

    32 6" A333-6, SMLS, STD WT, BBE (L=0.5m) 2

    33 6" A333-6, SMLS, STD WT, BBE (L=0.4m) 4 1

    "

    2" A333-6, SMLS, XS, BBE (L=1m)

    2" A333-6, SMLS, XS, BBE (L=0.7m)

    - , , , ( = . m)

    35 1 1 1 1

    36 F8N-2 1 1 1

    8" A333-6, SMLS, SCH 20, BBE (L=0.2m)

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    66/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    -5265

    -5266

    -5267

    -5268

    -5269

    -5270

    -5271

    -5272

    -5273

    -5274

    -5275

    -5276

    -5277

    -5278

    -5279

    -5280

    -5281

    -5282

    -5283

    -5284

    -5285

    -5286

    -5287

    -5288

    / . .

    1 0.9 1.8 2.0 0.9 5.2 2.2 4.5 2.0 1.5 0.8

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    O-3000-L

    "AD" SYSTEM, (2-)

    2 2.4 2.4 2.1 2.5 2.6 3.0 1.5 4.0 1.7 0.5 1.5 0.5 1.7 1.1 2.3 2.4 1.4 1.3 1.9 0.8 0.9 1.3 0.13 4.2 4.2 3.7 4.4 4.5 5.2 2.7 7.0 3.0 1.0 2.6 0.9 3.0 1.9 3.9 4.2 2.5 2.2 3.4 1.5 1.6 2.3 0.14 1.8 1.8 1.6 1.9 1.9 2.2 1.1 3.0 1.3 0.4 1.1 0.4 1.3 0.8 1.7 1.8 1.1 1.0 1.4 0.6 0.7 1.0 0.1

    "CA"

    ()

    ()

    ()

    100%

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    67/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    68/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    69/245

    MTO REVI-

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    ISOMET-

    RIC

    NoITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT O-3000-L-5239

    O-3000-L-5244

    O-3000-L-5257

    O-3000-L-5252

    O-3000-L-5243

    O-3000-L-5245

    O-3000-L-5254

    O-3000-L-5255

    O-3000-L-5256

    O-3000-L-5247

    O-3000-L-5250

    O-3000-L-5251

    O-3000-L-5242

    O-3000-L-5246

    O-3000-L-5240

    O-3000-L-5249

    O-3000-L-5248

    DESCRIPTION

    1 EA 1 1

    2 EA 1 2 2 1 3 4 1 1 1

    3 EA 1 1 1

    4 EA 2

    5 EA 3

    6 EA 1

    10" WN FLG, A350LF2 CL.1, CL150, SCH 20, RF, STDF, B16.5

    8" WN FLG, A350LF2 CL1 CL150, SCH 20, RF, STDF, B16.5

    4" WN FLG, A350LF2 CL.1, CL150, STDWT, RF, STDF, B16.5

    8" FLG BLD, A350LF2 CL.1, CL150, RF, STDF, B16.5

    2"WNFLG A350LF2CL1 CL150 XS RF STDF B165

    6" WN FLG, A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5

    7 EA 1

    8 EA 2 2 2 1

    9 EA 2 2 2 1

    10 EA 1 1

    2" FLG BLD, A350LF 2 CL1, CL150, RF, STDF, B16.5

    3/4" SW FLG, A350LF2 CL1, CL150, XS, RF, STDF, B16.5

    3/4 FLG BLD, A350LF2 CL1, CL150, RF, STDF, B16.5

    150HDPE

    , , , , , , .

    10" STUB FLANGE ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RING PP WITH STEEL CORE CL150 B16.5 (250mm)

    11 EA 1

    12 EA 2

    13 EA 1

    14 EA 1

    8" WN FLG, A350LF2 CL1, CL600, XS, RTJ, B16.5

    6" STUB FLG ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RING PP WITH STEEL CORE CL150 B16.5 (160mm)

    2" STUB FLANGE ASSY LS HDPE PN16 PE100 SDR11 C/W BACKING RING PP W ITH STEEL CORE CL150 B16.5 (63mm)

    8" FLG WN, A350LF2 CL1, CL600, SCH20, RTJ, B16.5

    600H01

    15 EA 1

    16 EA 1

    17 EA 2

    18 EA 3 3" WN FLG, A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5

    150H04

    6" WN FLG, A350LF2 CL1, CL150, STD W T, RF, STDF, B16.5

    3/4" FLG SW, A350LF2 CL1, CL600, XS, RTJ, B16.5

    3/4" FLG BLD, A350LF2 CL1, CL600, RTJ, B16.6

    19 EA 1

    20 EA 1

    3/4" SW FLG, A350LF2 CL1, CL150, XS, RF, STDF, B16.5

    3/4" FLG BLD, A350LF2 CL1, CL150, RF, STDF, B16.5

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    70/245

    MTO REVI-

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    ISOMET-

    RIC

    NoITEM

    No

    STOCK

    CODELENGTH

    UNIT DESCRIPTION O-3000-L-5247

    O-3000-L-5250

    O-3000-L-5251

    O-3000-L-5249

    O-3000-L-5242

    O-3000-L-5240

    O-3000-L-5246

    O-3000-L-5248

    O-3000-L-5243

    O-3000-L-5256

    O-3000-L-5254

    O-3000-L-5244

    O-3000-L-5245

    O-3000-L-5252

    150H01

    O-3000-L-5257

    O-3000-L-5255

    O-3000-L-5239

    1 EA 1 1 1 2 1 1

    2 EA 1

    3 EA 1

    4 EA 1

    5 EA 1

    6" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW

    8" SWING TYPE CHECK-VALVE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)

    8" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW

    4" SWING TYPE CHECK-VALVE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)

    4" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW

    " I6 EA 1

    7 EA 1

    8 EA 2 2 2 1

    600H01

    " I

    2" VALVE-GATE, FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM 12, HW

    - - - - - I

    LONG FROM CENTER LINE OF VALVE TO HANDWHEEL TYPE-1

    3/4" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL150, RF, STDF API602OBB, TRM12, HW

    10 EA 1

    11 EA 1

    12 EA 1

    - , , , , I , , ,

    8" SWING TYPE CHECK-VALVE, LUGTHRU, A352LCB, CL600, RJ, B16.34, 316PLT7 (SP-10221)

    150H04

    3/4" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL600, RTJ, API6 02OBB, TRM12, HW

    3" VALVE-GATE FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW

    13 EA 2

    14 EA 1 3/4" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW

    1" VALVE-GATE SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    71/245

    MTO REVI-

    SION NO 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1

    ISOMET-

    RIC

    NoITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT -3

    000-L-5255

    DESCRIPTION -3

    000-L-5239

    -3000-L-5243

    -3000-L-5242

    -3000-L-5240

    -3000-L-5251

    -3000-L-5250

    -3000-L-5244

    -3000-L-5245

    -3000-L-5256

    -3000-L-5257

    -3000-L-5252

    -3000-L-5249

    -3000-L-5246

    -3000-L-5254

    -3000-L-5248

    -3000-L-5247

    I

    1 EA 1 1

    2 EA 1 1

    3 EA 2 1 1

    4 EA 1 2 2 2 1 6 2 2 1

    EA

    8" INSLKT WITHOUT GASKET CL.150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB

    I I

    150H01

    10" INSLKT WITHOUT GASKET CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB

    6"GASKET SPWND 316L-FG 1/8"SSSS CL150 B1620 B165 LS

    8" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    10" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    6 EA 4

    7 EA 2

    8 EA 2

    9 EA 4 4 4 2

    2" GASKET, SPWND, 316L-FG, 1/8''SSSS, CL150, B16.20, B16.5, LS

    3/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    , , , , , . , . ,

    4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    2" INSLKT WITHOUT GASKET CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB

    1

    10 EA 1

    11 EA 3

    12 EA 2

    8" GASKET, OVLRNG, SS135HB, CL600, B16.20, B16.5

    8" INSLKT, CL600, B16.5, PLNPHN, OVLRNG, DPHNWS, ZNWS, PHNS1, NCC

    3/4" GASKET, OVLRNG, SS135HB, CL600, B16.20, B16.5

    13 EA 2

    14 EA 1

    15 EA 3

    16 EA 2

    6" INSLKT WITHOUT GASKET CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWS PHNS1 NCB

    150H04

    3" INSLKT, CL150, B16.5, PLNPHN, 1/8", FLATR, DPHNWS, ZNW S, PHNSL, NCB

    3" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    3/4" GASKET, SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    17 EA 2

    18 EA 2 2" GASKET, RF EPDM STEEL CORE CL 150 PE100-SDR11 B16.21, B16.5

    150HDPE

    6" GASKET, RF EPDM STEEL CORE CL 150 PE100-SDR11 B16.21, B16.5

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    72/245

    MTO REVI-

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    ISOMET-

    RIC

    No

    ITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT O-3000-L-5246

    O-3000-L-5244

    150H01

    O-3000-L-5239

    O-3000-L-5257

    O-3000-L-5254

    O-3000-L-5245

    O-3000-L-5242

    O-3000-L-5250

    O-3000-L-5252

    O-3000-L-5240

    O-3000-L-5256

    O-3000-L-5243

    O-3000-L-5251

    O-3000-L-5249

    O-3000-L-5248

    O-3000-L-5247

    O-3000-L-5255

    DESCRIPTION

    1 EA 16 16 16 8

    2 EA 8

    3 EA 32

    4 EA 8 5 EA 16 8 8

    6 EA

    M16x85 LG STUDBOLTS C/W 2 NUTS A320L7M/7M

    M18x125 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS

    M18x130 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS

    M16x105 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS

    M16x90 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M14x65 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    7 EA 16

    8 EA 8 16 16 16 8 32 8 8 8

    9 EA 12 12

    10 EA 12

    M20x110 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M22x130 LG STUD-BOLT AND TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W W ASHERS

    M30 x205 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M20x100 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    600H01

    11 EA 24

    12 EA 8

    13 EA 8

    14 EA 8

    M30 x190 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    150H04

    M14x65 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M16x90 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M16 x90 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    15 EA 4

    16 EA 16

    M16x105 LG STUD-BOLT, A320 GR L7M/A194 GR 7M NUTS

    M18x125 LG STUD-BOLT & TWO NUTS A182 GR F55 (25%-CR. ALLOY STEEL) C/W WASHERS

    ,

    MTO REVI-

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    73/245

    MTO REVI

    SION NO 1 1 0 1 0 0 0 0 0 0 0 1 1 1 1 0 0

    I39

    46

    48

    47

    57

    50

    51

    43

    54

    49

    56

    45

    40

    42

    44

    52

    55

    I -

    RIC

    NoITEM

    No

    STOCK

    CODE

    LENGTH

    UNIT O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    I ''

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    DESCRIPTION O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    2 EA 1 1

    3 EA 9 3 3 12 1

    4 EA 1

    5 EA 4 5 12 5 6 3 5 8 4 8 2

    6 EA 1 11

    STANDARD PIPE SUPPORT HG1-B

    I -

    STANDARD PIPE SUPPORT F9-8

    STANDARD PIPE SUPPORT HG1-A

    STANDARD PIPE SUPPORT DA2-8''

    STANDARD PIPE SUPPORT P21-B1

    7 EA 1 2

    8 EA 3

    9 EA 1

    10 EA 1 1

    11 EA 2

    12 EA 1

    STANDARD PIPE SUPPORT P52-A1

    STANDARD PIPE SUPPORT P51-F4

    STANDARD PIPE SUPPORT P51-D2

    STANDARDPIPE SUPPORT P61-A1

    STANDARD PIPE SUPPORT P21-B2

    STANDARD PIPE SUPPORT P21-C4

    13 EA 2

    14 EA 1 1

    15 EA 1

    16 EA 10 12

    17 EA 3

    STANDARD PIPE SUPPORT S1-14''

    STANDARD PIPE SUPPORT S3-10''

    STANDARD PIPE SUPPORT P8-A2

    I

    STANDARD PIPE SUPPORT S3-14''

    STANDARD PIPE SUPPORT S3-3"

    18 EA 19 7

    19 EA 31 8 11 7 6 13 8

    20 EA 1 15

    21 EA 1 1 1

    22 EA 5

    23 EA 1

    STANDARD PIPE SUPPORT UG-2"(CS)

    STANDARD PIPE SUPPORT S3-8''

    STANDARD PIPE SUPPORT S1-8''

    STANDARD PIPE SUPPORT F9-7

    STANDARD PIPE SUPPORT S3-6"

    STANDARD PIPE SUPPORT P51-D4

    24 EA 1

    25 EA 1

    26 EA 5

    27 EA 1 STANDARD PIPE SUPPORT P51-D2

    STANDARD PIPE SUPPORT P26-A2

    STANDARD PIPE SUPPORT P21-C5

    STANDARD PIPE SUPPORT S3-4"

    MTO REVI-

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    74/245

    MTO REVI

    SION NO 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0

    52

    54

    55

    56

    57

    46

    47

    48

    49

    50

    51

    39

    40

    42

    43

    44

    45

    ISOMET-

    RIC

    NoITEM

    No

    STOCK

    CODE

    LENGTH

    UNITDESCRIPTION

    "AD" SYSTEM

    I I I

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    O-3

    000-L-5

    2

    . . . . . . . . . . . . . .

    2 LITRES 21.4 26.1 32.2 11.3 11.8 6.5 8.2 15.3 0.4 0.4 7.7 14.6 0.3 6.0

    3 LITRES 1.4 1.4 0.1 0.8 0.2 0.2 1.3 9.3 95.3

    "EH" SYSTEM

    COAL TAR EPOXY (3-COATS)

    I I I

    TOPCOAT (LOW TEMPERATURE CURE HIGH SOLIDS EPOXY)

    4 LITRES 0.1 2.1

    5 LITRES 0.1 3.6

    6 LITRES 0.1 1.5

    PRIMER (ZINC RICH EPOXY)

    TIE-COAT (POLYAMIDE EPOXY(HIGH BUILD))

    TOPCOAT (ALIPHATIC POLYURETHANE OR ACRYLIC)

    "CA" SYSTEM

    PAINT QUANTITY IS WITH 100% MARG

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    75/245

    .. .

    1 1 1 1 0 0 0 0 0 0 0 1 1 1 1 0 1

    0-L-5

    246

    0-L-5

    247

    0-L-5

    242

    0-L-5

    243

    0-L-5

    245

    0-L-5

    239

    0-L-5

    240

    0-L-5

    244

    0-L-5

    252

    0-L-5

    254

    0-L-5

    255

    0-L-5

    256

    0-L-5

    248

    0-L-5

    249

    0-L-5

    250

    0-L-5

    251

    0-L-5

    257

    . .

    1 83.0 99.0 2 2.0 2.0

    O-3

    00

    O-3

    00

    150H01

    14" , A333-6, SMLS, SCH 10, BBE

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    "

    O-3

    00

    10" , A333-6, SMLS, SCH 20, BBE

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    O-3

    00

    1 . 6 .5 6 . 6.1 6. 6.5 .5

    4 114.0 44.05 1.3 6 0.4 0.4 0.4 0.2

    6" , A333-6, SMLS, STD WT, BBE

    150HDPE

    3/4" , A333-6, SMLS, XS, PE

    , - , , ,

    4" , A333-6, SMLS, STDWT, BBE

    7 6 8 2.4 2.4 9 3.5

    10 29.0

    12" , PN16, HDPE, PE PE100-SDR11 (315mm)

    10" , PN16, HDPE, PE PE100-SDR11 (250mm)

    8" , PN16, HDPE, PE PE100-SDR11 (200mm)

    1

    2" PN 16 HDPE PE PE100 SDR11 (63mm)

    11 49.0 12 0.2

    13 175.0

    8" , A333-6, SMLS, XS, BBE

    150H048" , A333-6, SMLS, SCH 20, BBE

    3/4" , A333-6, SMLS, XS, PE

    14 1.0

    15 45.0 16 70.0 17 0.5 18 0.2

    3" , A333-6, SMLS, STDWT, BBE

    1" , A333-6, SMLS, XS, PE

    3/4" , A333-6, SMLS, XS, PE

    6" , A333-6, SMLS, STD WT, BBE

    2' , A333-6, SMLS, XS, BBE

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    76/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    77/245

    / . .

    -3000-L-5239

    -3000-L-5240

    -3000-L-5242

    -3000-L-5243

    -3000-L-5244

    -3000-L-5245

    -3000-L-5246

    -3000-L-5247

    -3000-L-5248

    -3000-L-5249

    -3000-L-5250

    -3000-L-5251

    -3000-L-5252

    -3000-L-5254

    -3000-L-5255

    -3000-L-5256

    -3000-L-5257

    1 1 1

    2 1 2 2 1 3 4 1 1 1

    3 1 1 1

    4 2

    O O O O O O O O O O O O O O O O O

    8" , A350LF2 CL.1, CL150, RF, STDF, B16.5

    6" WN , A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5

    150H01

    10" WN , A350LF2 CL.1, CL150, SCH 20, RF, STDF, B16.5

    8" WN , A350LF2 CL1 CL150, SCH 20, RF, STDF, B16.5

    5 3

    6 1

    7 1

    8 2 2 2 1

    9 2 2 2 1 3/4 , A350LF2 CL1, CL150, RF, STDF, B16.5

    4" WN , A350LF2 CL.1, CL150, STDWT, RF, STDF, B16.5

    2" WN , A350LF2 CL1, CL150, XS, RF, STDF, B16.5

    2" , A350LF 2 CL1, CL150, RF, STDF, B16.5

    3/4" SW , A350LF2 CL1, CL150, XS, RF, STDF, B16.5

    10 1 1

    11 1

    12 2

    150HDPE

    10" ASSY LS HDPE PN16 PE100-SDR11 C/W BACKRING PP CL150 B16.5 (250mm)6" ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RINGPP CL150 B16.5 (160mm)

    2" ASSY LS HDPE PN16 PE100-SDR11 C/W BACK RING

    13 1

    14 1 15 1

    PP CL150 B16.5 (63mm)

    8" WN , A350LF2 CL1, CL600, XS, RTJ, B16.5

    8" WN, A350LF2 CL1, CL600, SCH20, RTJ, B16.5

    600H01

    3/4" SW, A350LF2 CL1, CL600, XS, RTJ, B16.5

    16 1

    17 2

    18 3

    19 1

    150H04

    6" WN , A350LF2 CL1, CL150, STD WT, RF, STDF, B16.5

    3" WN , A350LF2 CL1, CL150, STDWT, RF, STDF, B16.5

    3/4" SW , A350LF2 CL1, CL150, XS, RF, STDF, B16.5

    3/4" , A350LF2 CL1, CL600, RTJ, B16.5

    20 1 3/4" , A350LF2 CL1, CL150, RF, STDF, B16.5

    .

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    78/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    / . . 00-L-5244

    00-L-5245

    00-L-5246

    00-L-5247

    00-L-5248

    00-L-5249

    00-L-5250

    00-L-5239

    00-L-5240

    00-L-5242

    00-L-5243

    00-L-5251

    00-L-5252

    00-L-5254

    00-L-5255

    00-L-5256

    00-L-5257

    1 1 1 1 2 1 1

    2 1

    3 1

    8" SWING TYPE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    8" FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW

    " I

    6" FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW

    150H01

    4 1

    5 1

    6 1

    7 1

    8 2 2 2 1

    4" FLXWDGRS, A352LCB, CL150, RF, STDF API600, OBB, TRM12, HW

    4" SWING TYPE, A352LCB, CL150, SRF, STDF, B16.34, 316PLT7 (SP-10153)

    2" AS PER DATE SHEET DS-SP-056-07-102 C/W EXTENDED SPINDLE2500mm LONG FROM CENTER LINE OF VALVE TO HANDWHEEL TYPE-1

    2" , FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM 12, HW

    3/4" SLDWDGIS, A350LF2 CL1, CL150, RF, STDF API602OBB, TRM12, HW

    9 1

    10 1

    11 1

    600H01

    8" FLXWDGRS, A352LCB, CL600, RTJ, API600, OBB, TRM12, GO

    8" SWING TYPE, LUGTHRU, A352LCB, CL600, RJ, B16.34, 316PLT7 (SP-10221)

    8" SLDWDGIS, A350LF2 CL1, CL600, RTJ, API602OBB, TRM12, HW

    12 1

    13 2

    14 1

    3" FLXWDGRS, A352LCB, CL150, RF, STDF, API600, OBB, TRM12, HW

    3/4" SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW

    150H04

    1" SLDWDGIS, A350LF2 CL1, CL800, SW, API602OBB, TRM12, HW

    .. .

    0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    79/245

    / . .

    -3000-L-5239

    -3000-L-5240

    -3000-L-5242

    -3000-L-5243

    -3000-L-5244

    -3000-L-5245

    -3000-L-5246

    -3000-L-5247

    -3000-L-5248

    -3000-L-5249

    -3000-L-5250

    -3000-L-5251

    -3000-L-5252

    -3000-L-5254

    -3000-L-5255

    -3000-L-5256

    -3000-L-5257

    1 1 1

    2 1 1

    3 2 1 1 8" CL.150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWSPHNS1NCB

    150H01

    10" CL150 B16.5 PLNPHN 1/8"FLATR DPHNWS ZNWSPHNS1 NCB

    10" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    4 1 2 2 2 1 6 2 2 1

    5 2

    6 4

    7 2

    8 2

    8" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    2" SPWND, 316L-FG, 1/8''SSSS, CL150, B16.20, B16.5, LS

    6" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    2" CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWSPHNS1 NCB

    9 4 4 4 2

    10 1

    11 3

    12 2

    3/4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    600H01

    8" , CL600, B16.5, PLNPHN, OVLRNG, DPHNWS, ZNWS, PHNS1, NCC

    8" , OVLRNG, SS135HB, CL600, B16.20, B16.5

    3/4" , OVLRNG,SS135HB, CL600, B16.20, B16.5

    13 2

    14 1

    150H04

    6" CL150 B16.5 PLNPHN 1/8" FLATR DPHNWS ZNWSPHNS1 NCB

    3" , CL150, B16.5, PLNPHN, 1/8", FLATR, DPHNWS, ZNWS, PHNSL, NCB

    , , , , . , .

    15 3

    16 2

    17 22" RFEPDMSTEEL CORE CL150PE100-SDR11B1621 B165

    150HDPE

    , , , , , , , , ,

    3" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    3/4" , SPWND, 316L-FG, 1/8"SSSS, CL150, B16.20, B16.5, LS

    6" RF EPDM STEEL CORE CL 150 PE100-SDR11 B16.21, B16.5

    . , .

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    80/245

    /

    . .

    -3000-L-5

    239

    -3000-L-5

    240

    -3000-L-5

    242

    -3000-L-5

    243

    -3000-L-5

    244

    -3000-L-5

    245

    -3000-L-5

    246

    -3000-L-5

    247

    -3000-L-5

    248

    -3000-L-5

    249

    -3000-L-5

    250

    -3000-L-5

    251

    -3000-L-5

    252

    -3000-L-5

    254

    -3000-L-5

    255

    -3000-L-5

    256

    -3000-L-5

    257

    1 16 16 16 8

    2

    8

    3 32

    4 8

    M16x85 LG STUDBOLTS /2 A320L7M/7M

    O O O O O O O O O O O O O O O O O

    150H01

    M16x90 LG , A320 GR L7M/A194 GR 7M

    M16x105 LG A182 GR F55 (25%-CR. . ) /

    M14x65 LG , A320 GR L7M/A194 GR 7M

    5 16 8 8

    6

    7 16

    8 8 16 16 16 8 32 8 8 8

    9 12 12

    M18x125 LG A182 GR F55 (25%-CR. . ) /

    M18x130 LG A182 GR F55 (25%-CR. . ) /

    M20x100 LG , A320 GR L7M/A194 GR 7M

    M20x110 LG , A320 GR L7M/A194 GR 7M

    M22x130 LG A182 GR F55 (25%-CR. . ) /

    10 12

    11 24

    12 8

    600H01

    M30 x205 LG , A320 GR L7M/A194 GR 7M

    M30 x190 LG , A320 GR L7M/A194 GR 7M

    M16 x90 LG , A320 GR L7M/A194 GR 7M

    13 8

    14 8

    15 4

    16 16

    M16x90 LG , A320 GR L7M/A194 GR 7M

    M16x105 LG , A320 GR L7M/A194 GR 7M

    M18x125 LG A182 GR F55 (25%-CR. . ) /

    150H04

    M14x65 LG , A320 GR L7M/A194 GR 7M

    .. .

    1 1 0 1 0 0 0 0 0 0 0 1 1 1 1 0 0

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    81/245

    /

    . .

    000-L-5

    239

    000-L-5

    252

    000-L-5

    240

    000-L-5

    242

    000-L-5

    243

    000-L-5

    244

    000-L-5

    245

    000-L-5

    246

    000-L-5

    254

    000-L-5

    255

    000-L-5

    256

    000-L-5

    257

    000-L-5

    247

    000-L-5

    248

    000-L-5

    249

    000-L-5

    250

    000-L-5

    251

    1 1 1

    2 1 1 3 9 3 3 12 1

    DA2-6''

    F9-8

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    O-3

    DA2-8''

    O-3

    O-3

    O-3

    O-3

    O-3

    5 4 5 12 5 6 3 5 8 4 8 2

    6 1 11

    7 1 2

    8 3

    9 1

    P21-C4

    -

    P21-B1

    HG1-B

    P21-B2

    P52-A1

    10 P51-D2 1 1

    11 2

    12 1

    13 2

    14 1 1

    S3-10''

    P61-A1

    S1-14''

    P51-F4

    P8-A2

    16 10 12

    17 3

    18 19 7

    19

    31 8 11 7 6 13 8

    20 1 15

    S3-14''

    S3-3"

    S3-6"

    S3-8''

    UG-2"(CS)

    21 1 1 1

    22 5

    23 1

    24 1

    25 1

    26 5

    S1-8''

    P51-D4

    F9-7

    S3-4"

    P21-C5

    P26-A2

    27 1 P1-D2

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    82/245

    .. .

    0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0

    / 00-L-5257

    00-L-5250

    00-L-5251

    00-L-5252

    00-L-5254

    00-L-5255

    00-L-5256

    00-L-5244

    00-L-5245

    00-L-5246

    00-L-5247

    00-L-5248

    00-L-5249

    00-L-5239

    00-L-5240

    00-L-5242

    00-L-5243

    . .

    1 21.4 26.1 32.2 11.3 11.8 6.5 8.2 15.3 0.4 0.4 7.7 14.6 0.3 6.0

    2 21.4 26.1 32.2 11.3 11.8 6.5 8.2 15.3 0.4 0.4 7.7 14.6 0.3 6.0

    ,

    ,

    "AD"

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    O-30

    3 1.4 1.4 0.1 0.8 0.2 0.2 1.3 9.3 95.3

    4 0.1 2.1 ()

    "EH"

    (3-)

    "CA"

    5 0.1 3.6

    6 0.1 1.4

    (())()

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    83/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    84/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    85/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    86/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    87/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    88/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    89/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    90/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    91/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    92/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    93/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    94/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    95/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    96/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    97/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    98/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    99/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    100/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    101/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    102/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    103/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    104/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    105/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    106/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    107/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    108/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    109/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    110/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    111/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    112/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    113/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    114/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    115/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    116/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    117/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    118/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    119/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    120/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    121/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    122/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    123/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    124/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    125/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    126/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    127/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    128/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    129/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    130/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    131/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    132/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    133/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    134/245

    :

    PROJECT NUMBER / : X-000-056-07

    AFE NUMBER / : 6310110271DOCUMENT TITLE: LINE LIST - UTILITY WATER & TECHNICAL WATER SYSTEM

    : - . .

    TENGIZCHEVROIL /

    PROJECT TITLE: PLANT FIREWATER UPGRADE PROJECT

    DOCUMENT NUMBER / : PLL-056-07-B-0028

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    135/245

    REV/ PG TP

    REVISION DESCRIPTION /

    REVISION DESCRIPTION SHEET

    A 4Issued for IFRC

    B 4Approved for design

    C 4 Re-Issued for review and comment (Phase-4)-(-4)

    0 4Approved for construction

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    136/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    137/245

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    138/245

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    139/245

    REVISION DESCRIPTION SHEET

    REV..

    PARA.

    REVISION DESCRIPTION

    AIssued for Comment

    0Approved for Implementation

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    140/245

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

    TABLE OF CONTENTS /

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    141/245

    TABLE OF CONTENTS /

    Section

    Description

    Page.

    1 INTRODUCTION.............................................................................................................................................. 6

    2 ABBREVIATIONSANDDEFINITIONS................................................................................................................. 7

    3 BACKGROUND................................................................................................................................................ 8

    3.1 EXISTINGFWSYSTEM............................................................................................................................................ 83.2 UW&TWSYSTEM.............................................................................................................................................. 8

    3.3 MAINMODIFICATIONSUNDERPFUPROJECT.............................................................................................................. 94 SWITCHOVERPHILOSOPHY.......................................................................................................................... 10

    4.1 STEP1:MAINCONSTRUCTIONPHASE.................................................................................................................... 104.2 STEP2 :COMMISSIONINGOFNEWPUMPS............................................................................................................ 114.3 STEP3:IMPLEMENTTHE SWITCHOVER OFTWSUPPLYTOCONSUMERSFROMNEWTWSYSTEM....................................124.4 STEP4:IMPLEMENTTHESWITCHOVEROFUWSUPPLYTOCONSUMERSFROMTHENEWUWSYSTEM............................124.5 STEP5:MIGRATIONOFEXISTINGMAINSITEDIESELFWPUMPANDCTFFWPUMPSTOTHEINTEGRATEDSTARTUPLOGIC134.6 STEP6:ISOLATETHEOBHFWRINGMAINFROMTHEEXISTINGTWPUMPDISCHARGE.................................................134.7 STEP7:INTEGRATETHEFWRINGMAINATOBHAREAWITHTHEMAINFWHEADER.....................................................144.8 STEP8:STOPPINGOPERATIONOF FWJOCKEYPUMPS(G77/5.5ANDG77/5.6).....................................................144.9 STEP9:ISOLATE REDUNDANTEQUIPMENTFORDEMOLITION.................................................................................... 14

    5 REFERENCES................................................................................................................................................. 16

    1 .................................................................................................................................................... 21

    2 .................................................................................................................. 22

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    142/245

    Attachment

    1. List of Reference P&IDs for PFU project

    1.

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

    1 INTRODUCTION

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    143/245

    1 INTRODUCTION

    Tengizchevroil (TCO), a joint venture company between Chevron, Exxon-Mobil, LUKoil, andKazakhstan government, intend to upgrade their existing Fire Water Systems to make thesecompliant with current RoK regulations and to overcome the operational problems faced bythem. The PFU project is being implemented towards this.

    In addition to upgrade of FW network (including replacement of FW pumps andmodification of pump start-up sequence/controls, this project also envisages installation ofnew UW pumps and distribution network. The existing TW Pumps are also being replaced.

    Considering critical importance of FW,UW and TW systems for the plant operation, newpumps for each service are to be operational before the existing pumps for the sameservice can be decommissioned. This document details the philosophy to be adopted tointegrate the FW, UW and TW systems with the upgraded equipment and distributionnetworks without affecting operation of the main facilities.

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

    2 ABBREVIATIONS AND DEFINITIONS

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    144/245

    2 ABBREVIATIONS AND DEFINITIONS

    The following abbreviations & definitions are used in this document.

    CR Control RoomCCR Central Control RoomCTF Crude Tank farmERT Emergency Response TeamFEED Front End Engineering DesignF&G Fire & gasFW Fire WaterHDPE High Density Poly Ethylene

    HVAC Heating, Ventilation & Air Conditioning systemJSC Joint Stock CompanyKTL Complex Technological Line, production area in which

    the sour crude and gas is sweetened, excluding DMCMFB Minimum Flow BypassMCF Minimum Continuous FlowOBH Off-plot Boiler HousePCV Pressure Control valve

    PFU Plant Firewater Upgrade projectP&ID Piping & Instrumentation DiagramPLC Programmable Logic ControllerPSN Production Services NetworkPSV Pressure Safety ValveSCOT Sulphur Claus Off-gas TreatmentSDV Shutdown ValveSoW Scope of Work

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    145/245

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    146/245

    3.3 Main Modifications under PFU project

    Main modifications envisaged as a part of this project are:

    Providing new Electric FW pumps (G-106 A/B) to replace existing Electric FW pumps

    (G-97 1/2/3). These new pumps will be housed in a new FW pump house.

    Providing new Jockey pumps (G-105 A/B) to replace the existing pumps (G-77/5.5 &

    77/5.6 presently being used as Jockey Pumps as well as UW Pumps). These new

    Jockey pumps also will be installed in the new FW pump house.

    Providing new Utility Water Pumps (G-081A/B) and a UW distribution system,segregated from the FW system. These new pumps will be housed in a new UW/TW

    Pump house.

    Providing new TW Pumps (G-107A/B) to replace the existing Technical Water Pumps

    (G-77/6.1, 6.2, 6.3 and 6.4). These new pumps will be housed in the new UW/TW Pump

    house

    Installation of suitable overpressure protection for FW network and for underrated

    HDPE piping for FW network in Sulphur pads area.

    Replacement of existing hydrants / monitors, isolation valves and sections of headers.

    Implementation of integrated auto-startup sequence for the revamped FW pump

    battery.

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

    4 SWITCH OVER PHILOSOPHY

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    147/245

    4 SWITCH-OVER PHILOSOPHY

    Refer Attachment-1 for the list of reference P&IDs prepared for this project.

    This section describes the philosophy to be followed for implementation of proposedmodifications without hampering plant operations and jeopardising safety of the systemswhile switching over operation to the new systems after upgrade. Those existing systems,which will become redundant after upgrade, will be dismantled ONLY after correspondingnew systems start functioning satisfactorily.

    The outline of philosophy for enabling switch-over to the upgraded system is divided intothe following 9 distinct steps:

    4.1 Step-1 : Main Construction Phase

    a) Construction of project scope that does not involve any work on the existing system: likenew pump-houses, pumps and connected piping etc.

    There is no impact on working of the existing systems while construction of pump-houses goes on including installation of new pumps and connected pipes up to therespective tie-in locations.

    This part of the work also includes the following :

    installation of new hydrants/monitors

    construction of hydrant/monitor/valve pits at new locations (replacing existinghydrant/monitor/valve pits)

    installation of new UW network

    installation of Anti s rge control al es / relief al es (e cl ding those in S pads

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    148/245

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    149/245

    No. Tie-in No. Location P&ID No.

    1 046 New 4 Process Water connection to OBHO-000-B-5020;O-000-B-5015

    O-000-B-2006-05607D

    2 047New 10 Process Water connection to No.1TW line to Train 5

    O-000-B-5020;

    O-000-B-5015

    O-000-B-2006-05607D

    3 048New 10 Process Water connection to No.2TW line to Train 5

    O-000-B-5020;

    O-000-B-5015O-000-B-2006-05607D

    4 049New 6 Process Water connection toChemical Water treatment

    O-000-B-5020;

    O-000-B-5015

    O-000-B-2006-05607D

    4.3 STEP-3 : Implement the switch over of TW supply to consumers from new TWsystem

    Commission Tie-ins 46, 47, 48 and 49 one by one by opening the isolation valve from thenew TW header and then closing the isolation valve from the existing TW header. Theexisting TW pumps can be stopped one by one, as the TW/PW demand switches to thenew system. Once Process water supply to all the delivery points is switched over to thenew TW system, all existing TW pumps can be stopped, and the existing TW ring main

    Doc No. PHL-056-07-B-0100

    PHL-056-07-B-0100

    Once the Tie-ins are implemented supply can be commissioned from the new UW

  • 8/9/2019 JPK-056-07-L-1754_rev 0

    150/245

    Once the Tie-ins are implemented, supply can be commissioned from the new UWdistribution network, and the temporary supply disconnected.

    The following UW consum