G.V.L Satya Kumar Executive Director(Perspective Planning) Railway Board Ministry of Railways, Government of India
13th June 2017, Busan, South Korea
![Page 2: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/2.jpg)
Structure of Presentation
1. The Scale and The Scope
2. Long Term Planning
3. TAR - Status
![Page 3: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/3.jpg)
IR – Network and Resources
• 66,030 Route km and 120,000 Track km
4th largest in World
• Predominantly Broad Gauge (1676mm) – 58,825 km (88%)
• 33.65% of total route km Electrified (22,224 Km) carrying 51% of
passenger and 65% of freight traffic
• 7,137 Stations
• 10,773 Locomotives 5th in the world
• 254,006 wagons & 68,558 coaching stock including EMU’s &
DEMUs 3rd
highest in the world
• 3 Passenger Car Manufacturing Units, 2 Locomotive Manufacturing
Units, 2 Wheel and Axle Plant and 1 Locomotive Rebuilding Plant
• 1.33 Million Employees
![Page 4: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/4.jpg)
Source : www.mapsofindia.com
High Density
Corridor
Golden
Quadrilateral
+ Diagonals
16% of route
Km carries
52% of
passenger &
58 % of
freight
![Page 5: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/5.jpg)
IR – Role & Characteristic
• Lifeline of the nation – IR carries one third of the total
freight traffic (tonne kilometers) of the country
It carries…
• 70% of all Coal
• 81% of all Fertilizer
• 56% of all Iron Ore
• 46% of all Cement
• 22% of all POL
• 18% of all Food grains
• Complexity of Operations
• Intense Freight-Passenger interaction on common infrastructure
• High Density Corridor (Golden Quadrilateral + Diagonals) 16% of
route Km carries 52% of passenger & 58 % of freight
![Page 6: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/6.jpg)
Transportation Statistics
Freight Operations
• 1095 million Ton
• 682 billion Net Ton KM
4th highest in world
• 9200 + freight trains
per day
Passenger Operations
• 8224 million Originating
Passengers
55% suburban, 45% non
suburban
• 1147 billion Passenger KM
(Highest in world)
• 13,000+ passenger trains
per day (23 m pass /day)
Revenue (2015-16) : Rs 1,67,834
crore (US$ 25.28 billion)
![Page 7: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/7.jpg)
Investment Plan
Item 5 years
USD bn
Network Decongestion (including Dedicated
Freight Corridor + electrification, Doubling +
electrification & traffic facilities)
33.22
Network Expansion (including electrification) 32.17
National Projects (North Eastern & Kashmir
connectivity projects) 6.50
Safety (Track renewal, bridge works, Road Over
Bridge, Road Under Bridge and Signal &Telecom) 21.17
Information Technology / Research 0.83
Rolling Stock (Locomotives, coaches, wagons –
production & maintenance) 17.00
Passenger Amenities 2.08
High Speed Rail & Elevated corridor 10.83
Station redevelopment + logistic parks 16.67
Others 2.20
TOTAL 142.67
![Page 8: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/8.jpg)
Capacity Augmentation for future with
Technology Upgradation
Network Expansion
– About 2000 km new lines, 8000 km doubling, 3000
km gauge conversion and two High axle load Dedicated
Freight Corridors of 2800 km in next five years.
– 10000 km electrification in next five years
Rolling Stock
– Enhanced level of rolling stock procurement and new
manufacturing facilities for High Horse Power electric &
diesel locomotives
– High axle load and high capacity wagon development
& procurement
– Introduction of train set technology
![Page 9: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/9.jpg)
Focus Areas
• Development of Freight Corridors on the Golden Quadrilateral
routes (over 9,500 km)
• Development of High Speed Corridors – Diamond Quadrilateral
Project
• Speed Raising on 9 routes
– Delhi-Agra, Delhi-Chandigarh-Delhi-Kanpur, MumbaI-Goa,
Mumbai-Ahmedabad, Nagpur-Secunderabad, Nagpur-
Bilaspur, Chennai-Hyderabad, Chennai-Bangalore-Mysore
• Modernisation of stations
• Rolling stock manufacturing facilities
• Resource mobilisation
• Foreign Direct Investment (FDI)
![Page 10: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/10.jpg)
Corridors – HSR Studies Prefeasibilty study
1 – Pune-Mumbai-Ahmedabad, 650 km
approx. (completed)
2 – Delhi-Chandigarh-Amritsar, 450 km
3 – Hyderabad-Dornakal-Viajayawada-
Chennai, 665 km (completed)
4 – Chennai-Bangalore-Coimbatore-
Ernakulam, 650 km (completed)
5 – Howrah-Haldia, 135 km
(completed)
6 – Delhi-Agra-Lucknow-Varanasi-Patna,
990 km (completed)
Feasibility Study
1. - Mumbai-Ahmedabad 500 km
(completed by JICA)
2. – Delhi-Chennai 2000 km
3.- Mumbai-Kolkat 1970 km
4. – Delhi-Mubai 1400 km
5. – Delhi Kolkata 1400 km
6. – Mumbai-Chennai 1260 km
![Page 11: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/11.jpg)
FDI in Rail Sector
• FDI is now permitted in
Construction, operation and maintenance of the
following:
– Suburban corridor projects through PPP.
– High speed train projects
– Dedicated freight lines
– Rolling stock including train sets and
locomotives/coaches manufacturing and maintenance
facilities.
– Railway Electrification.
– Signaling systems
– Freight terminals
– Passenger terminals
– Infrastructure in industrial park pertaining to railway
line/sidings including electrified railway lines and
connectivity to main railway line
– MRTS
![Page 12: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/12.jpg)
Station redevelopment through PPP
• Scheme approved by the Union Cabinet
• Developing over 400 stations to international standards
with modern facilities & passenger amenities on lines of
PPP airports
• Land and space-rights of station buildings to be leveraged
• To seek participation of private entities
• Over USD 16.5 bn of investment potential in next 4-5
years
• Technology collaboration with foreign railways
for development of world class terminals
![Page 13: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/13.jpg)
• 2 corridors:
Eastern &
Western under
construction
• Target for
commissioning:
2018-19
• Expected
completion
cost: US$ 14
billion
Dedicated Freight Corridors
![Page 14: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/14.jpg)
Axle Load
Track Loading density
22.9 t / 25 t
32.5t/25 t
7.67 t/m 12 t/m
75 Kmph 100 Kmph
Indian Railway DFC Routes
Maximum Speed
Grade Upto 1 in 100
1 in 200
Average speed
25 kmph 70 kmph
Technology in DFC
![Page 15: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/15.jpg)
Future DFCs
Feasibility study for additional
four corridors:
• North-South corridor (Delhi-
Chennai – 2343 km,
completion cost USD 17.4
bn)
• East-West corridor (Howrah-
Mumbai) – 2328 km USD
18.42 bn)
• East Coast corridor
(Kharagpur Vijayawada) –
1123 km project report
October 2015
• Southern corridor (Chennai-
Goa) – 899 km project
report March 2016
![Page 16: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/16.jpg)
Make in India:
JV Electric Locomotive Factory/Madhepura, Bihar (for
12000 HP locomotives)
• 800 Locos over 11 years, financial bids received
on August 31, 2015
JV Diesel Locomotive Factory/ Marowhra, Bihar (for
4,500 & 6000 HP locomotives)
• 1,000 locos over 11 years, financial bids received
on September 1, 2015
Western DFC – RSP7- 9000 HP (200 Electric
Locomotives)
• 100 Locomotives to be manufactured at Dankuni,
bid received
Manufacturing of light-weight wagons
Train sets – 15 nos., RFQ received from 7
Modern Technology Based Rolling Stock
![Page 17: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/17.jpg)
Train Sets
Process initiated for procurement of Train Sets for 20%
saving in journey time and superior riding comfort
While introduction of High Speed (Bullet) trains may take
8-10 years to implement, these Train Sets can be
introduced in 2 years time with no changes in the
existing infrastructure.
![Page 18: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/18.jpg)
Train Sets
• 315 cars (15 train sets)
• Rs 2500 crore
• 160 km/h can be upgraded to 200 km/h in future
18
![Page 19: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/19.jpg)
MoUs with Foreign Railways
• China – National Rail Administration
• Republic of Korea – Ministry of Land, Infrastructure & Transport
• Germany – DB International
• France – French National Railways (SNCF)
• Spain – RENFE OPERADORA & ADIF
• Czech Republic - Czech Railways & ACRI
• Austria – Federal Ministry For Transport, Innovation & Technology
• Japan – Ministry of Land, Infrastructure & Transport
• Canada – Department of Transport
• Kazakhastan- Kazakhastan TemirZholi
• Slovak – Ministry of Transport, Construction and Regional
Development
• UK - Department for Transport
• Japan - Ministry of Land, Infrastructure, Transport and Tourism
• Russia - Joint Stock Company “Russian Railways”
• Sweden - Ministry of Enterprise and Innovation
![Page 20: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/20.jpg)
Cooperation Areas
• Heavy haul Infrastructure/operations
• HSR
• Operations control systems
• Rolling stock manufacturing including train sets
• Training
• Speed raising (160/200-250 kmph)
• Advanced signalling technologies
• Station development (multilevel arrival/departure
facilities, commercial/retail space, intermodal
integration)
• Freight terminals/Logistics facilities including
automobile logistics
• Freight movement and Railway safety regulations
including level crossing
• Modernisation of infrastructure and rolling stock
![Page 21: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/21.jpg)
Regional Transport Connectivity in Southern Asia
- Focus on TAR
![Page 22: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/22.jpg)
Major Initiatives in the Region
• UN-ESCAP-Istanbul-Tehran-Islamabad Container train already operational : proposed to be extended to Kolkata and Dhaka- the South Asian region may become a major trade hub.
• SAARC – Regional Railway Agreement: draft under finalisation at the SAARC Forum; presents standard governing principles for SAARC nations, and will supplement the existing bilateral agreements → stimulus to economic development of the region
• BIMSTEC – 7 Nation Grouping of Bay of Bengal region
• Exploring the feasibility of running container trains on Nepal – India – Bangladesh circuit
![Page 23: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/23.jpg)
Challenges for development of International Corridor
Technical (Inter-operability)
- Gauge
- Axle load
- Holding capacity in yards /stations
- Moving dimension of rolling stock
- Traction system
- Braking system
- Maintenance particulars
Non Technical
- Documentation – Multiple v/s Single
- Revenue sharing
- Customs/immigration
- Visas and other legal issues
- Safety and security
![Page 24: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/24.jpg)
Trans Asian Railway (TAR) - India
• Concept of TAR originated with UN-ESCAP’s Project, Asian Land Transportation Infrastructure Development (ALTID) in 1992
• The TAR Agreement came into force 11th June 2009
• 22 countries signed and 18 countries ratified the agreement
• India signed the agreement on 29th June 2007 and ratified the same on 13th September 2007
![Page 25: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/25.jpg)
TAR Routes • UNESCAP study identified three broad routes:
Northern Corridor: Passing through China, Kazakhstan, Mongolia, Russian Federation And Korean Peninsula;
TAR on Indo-China: Starting from Chinese border to Laos, Thailand, Malaysia
Southern Corridor: Connecting Turkey through Myanmar, Bangladesh, India, Pakistan, Iran with Sri Lanka also part of the Corridor
• The total Route length of TAR is 80,900 kms.
involving 28 countries out of which 22600 are in South Asia, Iran and Turkey
![Page 26: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/26.jpg)
Trans-Asian Railway Corridor in India
- On the Eastern side TAR link enters India at Moreh, exits at Mahisasan in Assam re-enters India at Gede and exits at Attari
- The Missing link between Jiribam to Imphal under construction. Reconnaissance Engineering cum Traffic Survey (RETS ) undertaken for construction of a new rail link between Imphal to Moreh in Manipur on the Indo-Myanmar border.
- M/s. RITES Ltd. submitted its offer for DPR to MEA for the rail link for the Moreh (India) – Tamu (Myanmar) – Kaley (Myanmar)
![Page 27: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/27.jpg)
Identified International Railway Network for Development in TAR - SAARC region
1. Pakistan-India Karachi (Pakistan) – Khokhrapar (Pakistan) – Munabao (India)
– Jodhpur (India) 2. Pakistan-India-Bangladesh-India i. Lahore(Pakistan) - Wagah (Pakistan) - Atari (India) -
Delhi(India)- Kolkata(India)- Gede/Petrapol (India) - Darshana / Benapol (Bangladesh) - Dhaka(Bangladesh)- Shahbazpur (Bangladesh) - Maishashan (India) - Imphal(India)
ii. Lahore(Pakistan) - Wagha (Pakistan) - Atari (India)-
Delhi(India)- Kolkata(India)-Gede/Petrapol (India) - Darshana / Benapol (Bangladesh)–Dhaka(Bangladesh)-Akhaura/Gangasagar (Bangladesh) - Agartala (India)
![Page 28: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/28.jpg)
3. India-Bangladesh Imphal(India) - Agartala (India) – Akhaura/Gangasagar (Bangladesh) –
Chittagong Port (Bangladesh)
4. Nepal-India Birgunj(Nepal) - Raxaul(India) - Kolkata Port/Haldia(India),
5. Nepal-India-Bangladesh
i. Birgunj(Nepal) - Raxaul(India) - Singhabad (India) - Rohanpur
(Bangladesh) - Mongla Port / Chittagong Port(Bangladesh)
ii. Biratnagar (Nepal) - Jogbani (India) - Radhikapur (India) - Birol
(Bangladesh) -Khulna (Bangladesh) - Mongla Port (Bangladesh).
iii. Bardibas(Nepal) – Inarwa (Nepal) - Jaynagar (India) - Radhikapur
(India) - Birol (Bangladesh) - Khulna(Bangladesh) - Mongla Port
(Bangladesh).
Identified International Railway Network for Development in SAARC region.
![Page 29: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/29.jpg)
6. India-Sri Lanka i. Chennai(India) - Rameshwaram(India) -
Talaimannar (Sri Lanka) – Colombo (Sri
Lanka)-Hambanthota(Sri Lanka). ii. Chennai(India) - Rameshwaram(India) -
Talaimannar (Sri Lanka) - Trincomalee (Sri
Lanka); 7. Bangladesh-Bhutan Mongla Port/Chittagong Port (Bangladesh) -
Chilahati (Bangladesh) - Haldibari (India) -
Hasimara(India) - Bhutan.
Identified International Railway Network for Development in SAARC region.
![Page 30: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/30.jpg)
Existing International Links
• With Bangladesh via Gede-Darsana, Singabad-Rohanpur and Benapole-Petrapole
• With Nepal via Raxaul-Birganj
• For Sri Lanka rail cum sea connectivity exists up to Rameswaram, Cochin and Tuticorin
• With Pakistan via Atari-Wagha and via Munabao-Khokharapar
![Page 31: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/31.jpg)
Gede
Moreh
TAR main link
TAR other routes
Missing Links
Mahisasan
Attari
![Page 32: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/32.jpg)
India- Pakistan Rail link
![Page 33: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/33.jpg)
India Pakistan Rail link
![Page 34: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/34.jpg)
Extant practice of Train Operations India - Pakistan
• Bilateral Agreements exist for interchange of traffic at border stations; - Wagah (Pakistan) – Attari (India) and
- Kokrabar (Pakistan) – Munabao (India)
• No break of Gauge issues as both countries have Broad Gauge (1.676 m)
• Customs, Immigration and health checks conducted by the border stations of the respective countries
• BCN wagons used for inter-country traffic
• Freight/Fare collected for the movement from/to border points of the respective country
• Freight interchange however is very minimal
![Page 35: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/35.jpg)
Extant practice of Train Operations India - Pakistan
• The goods service between Atari and Wagah worked by the using Railway
• The rules for the interchange of rolling stock have been mutually agreed upon
• Both Railways provide for loco servicing and running room facilities at respective border stations alternatively on six month basis
• The primary and secondary maintenance of rolling stock provided at Amritsar and Lahore
![Page 36: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/36.jpg)
Extant practice of Train Operations India - Pakistan
• Presently freight movement takes place only at
Attari–Wagah interchange point.
• Munabao –Kokrabar interchange handles only passenger traffic.
• Munabao –Kokrabar can also be opened for
freight especially for container traffic orginating in eastern part of India and Bangladesh for reaching Iran (at Zahedan) as alternate to Attari–Wagah route.
![Page 37: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/37.jpg)
India – Bangladesh Rail Links
![Page 38: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/38.jpg)
Existing Passenger services India Bangladesh
• Maitree Express run between Kolkata – Dhaka since April 2008
• Frequency – Tri-weekly
• Journey Time
– Kolkata – Dhaka 10 hrs. 25 minute
– Dhaka –Kolkata 10 hrs. 30 minutes
![Page 39: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/39.jpg)
• Working of trains governed by the Fundamental and subsidiary Rules and Running Power Agreement for interchange of Traffic
• Both IR and BR contribute equally towards the rolling stock – Locomotives provided by IR and BR on their respective territory
• Each Railway provide for primary maintenance of its rake.
• The crews and guards of IR and BR will man the trains over their respective territory
• Customs and Immigration clearance shall be arranged by IR and BR on their respective border stations
• Revenue apportionment on KM basis
Passenger Train service India - Bangladesh
![Page 40: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/40.jpg)
Freight Operation India - Bangladesh
• Working Agreements govern Train operations between India and Bangladesh
• Broad Gauge links at three locations provide for interchange of traffic viz. 1. Gede-Darshana, 2. Singhabad-Rohanpur and 3. Petrapole-Benapole.
• Rolling stock in good condition (BCN wagons running since 2013) shall be provided by IR and BR
• Joint Train Examination in both directions takes place at a single point
• Customs clearance arranged by IR and BR at their respective territory
• Major commodities moved by rail to Bangladesh are : maize , wheat and stone
![Page 41: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/41.jpg)
India – Bangladesh new links planned / under consideration
• Shahbazpur(BDR)-Mahishasan(IR):
Estimates under preparation from Mahishasan to border with Bangladesh.
Work of up gradation on Bangladesh side is undertaken.
• Haldibari – Chilahati :
Estimates under preparation from Haldibari to border with Bangladesh.
Bangladesh to plan connectivity upto Haldibari
• Belonia – Feni : Under consideration
![Page 42: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/42.jpg)
India – Bangladesh new links planned / under consideration
• Agartala - Akhaura (15 kms):
IRCON has submitted DPR for the link which has been accepted both by India and Bangladesh. Cost approx Rs. 900 crs.
• Radhikapur- Birol :
Bangladesh converting existing meter gauge section into dual gauge.
![Page 43: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/43.jpg)
India Nepal Connectivity
![Page 44: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/44.jpg)
India Nepal New Lines Surveyed
From To Distance
( in Kms.)
1 Jogbani (India) Biratnagar (Birat nagar) 18
2 Jayanagar (India) Bijalpura (Nepal ) & extn. to
Bardibas
69
3 Nepalganj Road (India) Nepalganj (Nepal) 12
4 Nautanwa (India) Bhairahawa (Nepal) 15
5 New Jalpaiguri
(India)
Kakarbhita via Panittanki
( Nepal)
46
6 Khushinagar (India) Kapilavastu (Nepal) Survey in
progress
Projects mentioned in item no. (1) and (2) are under implementation
![Page 45: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/45.jpg)
India Nepal links surveyed
![Page 46: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/46.jpg)
• Bilateral agreement governs the train operation between India and Nepal for the Broad Gauge link between Raxaul (India) and Birganj (Nepal) is operational
• Indian Railways provide rolling stock
• Single waybill for the carriage of goods
• Train operation done by IR crew
• Presently Containers of ISO specifications loaded on flat wagons/Open wagons are interchanged
• BCN, BCNA (Covered wagons) rakes shall also be allowed
• Basic maintenance of wagons at Birganj
• Collection of freight by respective agencies over their respective territory
• Customs facilitation at Raxaul and the Gateway ports
Extant practice of Train Operation India - Nepal
![Page 47: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/47.jpg)
India – Bhutan New lines Surveyed
From
To
Distance
( in Kms.)
Hasimara (India) Phuentsholing (Bhutan) 18
Rangia (India) Samdrupjongkhar Via
Darranga (Bhutan)
48
Kokrajhar (India) Gelephu (Bhutan) 58
Banarhat (India) Samtse (Bhutan) 23
Pathshala (India) Nanglam (Bhutan) 51
![Page 48: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/48.jpg)
Colombo (Sri Lanka) - Chennai (India) 1025 kms.
![Page 49: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/49.jpg)
• For connectivity with Sri Lanka – Ferry service to be established between
Rameshwaram/Tuticorin (India) and Talaimannar (Sri Lanka) -
(The work of reconstruction of Railway line from Talaimannar to Medawachchiya in the northern province of Sri Lanka has been undertaken by IRCON Limited, a Public Sector Undertaking under Ministry of Railways)
New Connectivity Projects
![Page 50: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/50.jpg)
New Connectivity Projects
• For connectivity with Bangladesh – Agartala - Akhaura New Line (Trans Asian Railways
missing link segment) is undertaken.
• For connectivity with Nepal two projects have been sanctioned: – Jogbani-Biratnagar link
– Jayanagar-Bijalpura Gauge Conversion with extension to Bardibas
• For Connectivity with Myanmar – Jiribam-Imphal new link is under construction and a
Survey has also been undertaken for linking Imphal – Moreh - This link will connect Indian Railways with Myanmar Railways in future.
![Page 51: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/51.jpg)
Other possible measures for improvement
• Expanding the railway infrastructure including warehousing and handling yard
• Expanding Bank and forex facilities
• Integrated check posts as a single window facility covering customs, immigration and warehousing , health facilities etc.
• Adopting fast track cargo clearance system
• Promoting regional transit trade
• Simplified Agreement and standard legal regimes
![Page 52: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/52.jpg)
Objectives of the Regional Rail Agreement (RRA)
1. To facilitate cross border transportation of goods and people between and among Contracting States;
2. To facilitate an efficient multimodal transport system for integration and for sustaining the economic growth and competitiveness of the region;
3. To strengthen connectivity and seamless passage for people of the region leading to enhanced trade and intra-regional people-to-people contacts;
4. To establish an effective, efficient, integrated and harmonized rail transportation system in the region;
5. To further the economic integration in the region;
6. To implement relevant provisions of the Agreement on South Asian Free Trade Area (SAFTA);
![Page 53: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/53.jpg)
Regional Rail Agreement
• Proposes to integrate the region by overcoming the physical and non-physical barriers which include :
– Development of missing links/new links - for seamless movement
– A basic standard of technical characteristics common to all the SAARC countries including gauge harmonization and stock compatibility
– Standardization of documentation and customs procedure
– Maintenance and Operating Arrangements
– Communication facilities – Dedicated lines
– Safety & Security of Trains while in Transit
– Aim of having common Railway Receipt/ Passenger Ticket for movement on the regional network
– Visa facilities – Multiple entry visa valid for one year for Railway personnel on duty
![Page 54: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/54.jpg)
Regional Rail Agreement
• Development of missing links/new links - for seamless movement
• A basic standard of technical characteristics common to all the SAARC countries
• Standardization of documentation and customs procedure
• Maintenance and Operating Arrangements
• Communication facilities – Dedicated lines
• Safety & Security of Trains while in Transit
• Aim of having common Railway Receipt/ Passenger Ticket for movement on the regional network
• Visa facilities – Multiple entry visa valid for one year for Railway personnel on duty
![Page 55: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/55.jpg)
55
Rationalization of
Management
practices
Capital Investment
Operational Efficiency
TAR : Levers for Growth
People Marketing /
Pricing
![Page 56: Joint Working Group Meeting on TAR country... · 2018-02-13 · Joint Working Group Meeting on TAR – A Presentation by G.V.L Satya Kumar Executive Director(Perspective Planning)](https://reader033.fdocuments.us/reader033/viewer/2022041509/5e26fb4f020ca558e6753cf6/html5/thumbnails/56.jpg)
56 56