Joint Use Attachment Report for Xcel Energy
Pole # 18.03
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 073-790 (231435845)
Longitude -108.554381279
Latitude 39.06675629
Height 55
Class 2
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 237
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 20.83Middle
Top Charter 22.5
Power 25.2Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 18.75
Charter 18.08
29.5
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 19'10"
GuyingRequired No
18.03
Recommended Modifications
Pole 18.03: Charter is currently in violation and shall lower their attachment 8".
Span Pole 18.03 to Pole 18.02: Unite is currently in violation and shall lower their line 1'8".
Power Type Secondary
Power Type Primary
Tuesday, September 15, 20 Page 21 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 18.04
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo
Longitude -108.554400301
Latitude 39.066387688
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 134
Above Ground Clearance 9.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 20.33Middle
Top Charter 21.42
Power 26.58Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 19.25
Charter 20.25
22
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 19'4"
GuyingRequired No
18.04
Recommended Modifications
Span Pole 18.04 to Pole 18.03: Charter is currently in violation and shall lower their line 9". Unite shall lower their line 9" to maintain clearance.
Power Type Secondary
25.50
Power Type Secondary
Tuesday, September 15, 20 Page 22 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 18.05
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 114-447 (231461983)
Longitude -108.554384409
Latitude 39.065845775
Height 55
Class 4
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 197
Above Ground Clearance 15.5
Comment
Facilities at Pole
Unite 18.92
Position Owner Height
Bottom
Unite 19.17Middle
Top Charter 20.17
Power 23.83Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 18.92
Charter 19.58
30.08
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 17'11"
GuyingRequired No
18.05
Recommended Modifications
Span Pole 18.05 to Pole 18.04: Unite is currently in violation and shall lower their line 4".
Power Type Secondary
Power Type Primary
Tuesday, September 15, 20 Page 23 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 18.06
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 110-314 (231355572)
Longitude -108.554391678
Latitude 39.065419762
Height 55
Class 2
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 155
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Middle
Top
Power 25.17Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel 22
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 21'2"
GuyingRequired No
18.06
Recommended Modifications
Power Type Secondary
Power Type Secondary
Tuesday, September 15, 20 Page 24 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 18.07
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 104-097 (231483482)
Longitude -108.554384139
Latitude 39.064887431
Height 55
Class 2
ExistingRiser Yes
Equipment
NewRiserAllowed No
DistanceToNextPole 194
Above Ground Clearance 15.5
Comment
Facilities at Pole
CenturyLink 18.92
Position Owner Height
Bottom
CenturyLink 19.58Middle
Top Charter 20.58
Power 23.92Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel 30.67
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 17'11"
GuyingRequired No
18.07
Recommended Modifications
Power Type Riser
Power Type Primary
Tuesday, September 15, 20 Page 25 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 18.08
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 096-938 (231482242)
Longitude -108.554366346
Latitude 39.064455228
Height 55
Class 2
ExistingRiser Yes
Equipment
NewRiserAllowed Yes
DistanceToNextPole 157
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
CenturyLink 23.92Middle
Top CenturyLink 23.92
Power 23.67Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
CenturyLink 18.08
CenturyLink 19.42
19.58
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 18'4"
GuyingRequired No
18.08
Recommended Modifications
Pole 18.08: CenturyLink is currently in violation and shall lower their top attachment 3'7" and their bottom attachment 4'7".
Span Pole 18.08 to Pole 18.07: CenturyLink is currently in violation. Make Ready is required.
Power Type Riser
Power Type Secondary
Make Ready Required
Tuesday, September 15, 20 Page 26 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 18.09
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 091-746 (231483487)
Longitude -108.55438436
Latitude 39.063933099
Height 55
Class 2
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 190
Above Ground Clearance 15.5
Comment
Facilities at Pole
CenturyLink 20.58
Position Owner Height
Bottom
CenturyLink 21.17Middle
Top Charter 22.17
Power 24.92Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
CenturyLink 19.92
CenturyLink 21.42
31.17
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 18'7"
GuyingRequired No
18.09
Recommended Modifications
Pole 18.09: Charter is currently in violation and shall lower their attachment 7". CenturyLink shall lower their top attachment 7" and their bottom attachment 12".
Power Type Secondary
Power Type Primary
Tuesday, September 15, 20 Page 27 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 18.10
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 057-739 (231435939)
Longitude -108.55437955
Latitude 39.063851193
Height 40
Class 2
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 29
Above Ground Clearance
Comment
Facilities at PolePosition Owner Height
Bottom
Middle
Top
Power 30.17Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 19'
GuyingRequired Yes
18.10
Recommended Modifications
Power Type Neutral
Power Type
Tuesday, September 15, 20 Page 28 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 19
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 148-364 (231461992)
Longitude -108.554371893
Latitude 39.068370637
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 137
Above Ground Clearance 9.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 20.5Middle
Top Charter 21.5
Power 26.67Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 18.58
Charter 18.58
20.75
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 19'6"
GuyingRequired No
19
Recommended Modifications
Span Pole 19 to Pole 20: Charter and Unite are currently in violation. Charter shall lower their line 4" and Unite shall lower their line 1'4".
Power Type Secondary
26.00
Power Type Secondary
Tuesday, September 15, 20 Page 29 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 20
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 152-504 (231461999)
Longitude -108.554378555
Latitude 39.068746734
Height 55
Class 2
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 212
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 19.83Middle
Top Charter 21.08
Power 24.92Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 18.08
Charter 19.25
29.75
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 18'10"
GuyingRequired No
20
Recommended Modifications
Power Type Secondary
Power Type Primary
Tuesday, September 15, 20 Page 30 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 21
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 160-713 (231462087)
Longitude -108.554368727
Latitude 39.069330178
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 159
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 19.33Middle
Top Charter 20.5
Power 25.83Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 17.75
Charter 19.67
23.17
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 18'4"
GuyingRequired No
21
Recommended Modifications
Power Type Secondary
25.00
Power Type Secondary
Tuesday, September 15, 20 Page 31 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 22
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 166-871 (231463226)
Longitude -108.554367581
Latitude 39.069767675
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 230
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 18.42Middle
Top Charter 19.5
Power 24.67Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 17.17
Charter 17.17
30.25
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 17'5"
GuyingRequired No
22
Recommended Modifications
Span Pole 22 to Pole 23: Unite is currently in violation and shall lower their line 12".
Power Type Secondary
26.75
Power Type Primary
Tuesday, September 15, 20 Page 32 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 23
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 174-103 (231466690)
Longitude -108.554369965
Latitude 39.070400295
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 168
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 19.17Middle
Top Charter 20.42
Power 26.33Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 16.75
Charter 18.17
21.75
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 18'2"
GuyingRequired No
23
Recommended Modifications
Power Type Secondary
25.75
Power Type Secondary
Tuesday, September 15, 20 Page 33 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 24
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 183-272 (231468021)
Longitude -108.554366506
Latitude 39.070862736
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 91
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 18.58Middle
Top Charter 20.25
Power 25.42Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Charter 17.75
24
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 17'7"
GuyingRequired No
24
Recommended Modifications
Power Type Secondary
23.42
Power Type Secondary
Tuesday, September 15, 20 Page 34 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 24.01
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 246-270 (231463219)
Longitude -108.554136611
Latitude 39.070872824
Height
Class
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 65
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Middle
Top Charter 19
Power 24.33Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Charter 19.25
25.25
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 18'
GuyingRequired No
24.01
Recommended Modifications
Power Type Secondary
Power Type Secondary
Tuesday, September 15, 20 Page 35 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 24.02
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 342-267 (231468385)
Longitude -108.55379098
Latitude 39.070870688
Height
Class
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 97
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Middle
Top Charter 20.33
Power 25.17Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Charter 19
23.92
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 19'4"
GuyingRequired No
24.02
Recommended Modifications
Power Type Secondary
Power Type Secondary
Tuesday, September 15, 20 Page 36 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 24.03
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 480-263 (231468151)
Longitude -108.553313141
Latitude 39.070875007
Height 40
Class 4
ExistingRiser No
Equipment Xfmr
NewRiserAllowed Yes
DistanceToNextPole 135
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Middle
Top Charter 17.67
Power 24.58Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Charter 17.67
21.42
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 16'8"
GuyingRequired Yes
24.03
Recommended Modifications
Power Type Secondary
Power Type Secondary
Tuesday, September 15, 20 Page 37 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 24.04
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 188-481 (231466603)
Longitude -108.554367176
Latitude 39.071447596
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 213
Above Ground Clearance 15.5
Comment
Capacitor Bank also on pole
Facilities at PolePosition Owner Height
Bottom
Unite 21.42Middle
Top Charter 22.58
Power 26.75Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 19.33
Charter 20
30.33
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 20'5"
GuyingRequired No
24.04
Recommended Modifications
Span Pole 24.04 to Pole 24.03: Unite is currently in violation and shall lower their line 4".
Power Type Secondary
27.50
Power Type Primary
Tuesday, September 15, 20 Page 38 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 24.05
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 158-625 (85819215)
Longitude -108.554376394
Latitude 39.071831887
Height 60
Class 2
ExistingRiser No
Equipment
NewRiserAllowed Yes
DistanceToNextPole 140
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 19.67Middle
Top Charter 21.67
Power 25.5Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 19.33
Charter 21.08
24.58
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required No
Attachment Height 18'8"
GuyingRequired No
24.05
Recommended Modifications
Power Type Secondary
Power Type Secondary
Tuesday, September 15, 20 Page 39 of 49
Joint Use Attachment Report for Xcel Energy
Pole # 24.06
Company:
City:
Permit #
Date of Field Inspection:
Temperature:
XcelPoleNo 200-833 (231463202)
Longitude -108.554363797
Latitude 39.072421595
Height 55
Class 2
ExistingRiser No
Equipment Streetlight
NewRiserAllowed Yes
DistanceToNextPole 215
Above Ground Clearance 15.5
Comment
Facilities at PolePosition Owner Height
Bottom
Unite 20.75Middle
Top Charter 21.75
Power 26.25Xcel
Facilities at MidspanPosition Owner Height
Bottom
Middle
Top
Power Xcel
Unite 18.67
Charter 18.67
29.8
Zippy Tech
Grand Junction, CO
5523
9/9/2015
80° F
Comment
Modifications Required Yes
Attachment Height 19'9"
GuyingRequired No
24.06
Recommended Modifications
Span Pole 24.06 to Pole 24.05: Unite is currently in violation and shall lower their line 12".
Power Type Secondary
26.50
Power Type Primary
Tuesday, September 15, 20 Page 40 of 49