JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

34
JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA FASIVER Remediation and revalorisation of a brownfield site Responsabilities for the clean-up company

description

FASIVER Remediation and revalorisation of a brownfield site Responsabilities for the clean-up company. JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA. DEME GENERAL PRESENTATION. DREDGING. 5 Axes of Activity creating a string of strengths. HYDRAULIC ENGINEERING. - PowerPoint PPT Presentation

Transcript of JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

Page 1: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

JOHAN MAES – DEC NV

DENIS DROUSIE – EXTRACT- ECOTERRES SA

FASIVER Remediation and revalorisation of a brownfield site

Responsabilities for the clean-up company

Page 2: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 2

DEME GENERAL PRESENTATION

Page 3: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 3

5 Axes of Activity creating a string of strengths

DREDGING

HYDRAULIC ENGINEERING

ENVIRONMENTAL TECHNIQUES

BUILDING MATERIALS

PROJECT DEVELOPMENT & CONCESSIONS

Page 4: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 4

50%

22%

12%

10% 6%

CAPITAL DREDGING MAINTENANCE DREDGINGENVIRONMENTAL OIL AND GASOTHER

50%

23%

16%

5% 6%

CAPITAL DREDGING MAINTENANCE DREDGINGENVIRONMENTAL OIL AND GASOTHER

2006

2004

DEME Group turnover

according to activities

Page 5: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 5

ECOTERRES Holding SA

Turnkey solutions for global environmental needs

Page 6: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 6

DEME NV

ECOTECH FINANCE SA

ECOTERRES HOLDING SA

DEC NV

ECOTERRES SA

EXTRACT-ECOTERRES

Structure

Page 7: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 7

StructureECOTERRES HOLDING SA

de Vries & van de Wiel - NL

GRC Kallo NV - BE

Cvba Fasiver - BE

Silvamo NV - BE

DEC UK Ltd

Terramundo Ltd - UK

SOLDEC - ES

Branch IrelandBranch Italy

Branch Sweden

Cebruval-Bruceval - BE

Ecobiogaz - BE

Sedisol - BE

Cetraval - BE

DEC NV

EXTRACT-ECOTERRES

SA

ECOTERRES SA

Page 8: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 8

ECOTERRES HOLDINGECOTERRES HOLDINGActual turnover 2005 : € 119,9 mioActual turnover 2006 : € 142,8 mioActual turnover 2007 : € 124,7 mioStaff : > 400

Financial info

DECDECActual turnover 2005 : € 59,60 mioActual turnover 2006 : € 77,00 mioActual turnover 2007 : € 62,00 mioStaff : 195

Page 9: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 9

IRELANDIRELAND

FRANCEFRANCE

PORTUGALPORTUGALITALYITALY

BELGIUMBELGIUM

DENMARKDENMARK

NETHERLANDSNETHERLANDS

SWEDEN

FINLANDFINLAND

UNITEDUNITED

KINGDOMKINGDOM

NORWAYNORWAY

SPAINSPAIN

to be further developed

DEME homemarkets

e.g.

Australia

Brazil

DEC - subsidiaries

Page 10: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 10

Remediation techniques : In-situ and ex-situ treatment contaminated soil

Isolation techniques

Treatment and recycling of sediments

Valorization of contaminated sites = Brownfield development

Hydraulic works

Environmental dredging

Knowhow of DEC NV

Page 11: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 11

FasiverFasiverRemediation and revalorisation of the

site ‘Eilandje’ at Zwijnaarde (Ghent), Belgium

Page 12: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 12

Fasiver Project

Remediation of historical ‘black-point’ Disposal and treatment capacity for dredged sediments for the next 10 years Creation of an industrial area

Page 13: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 13

Location

‘Fasiver-project’

Fasiver Project : location

Page 14: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 14

Fasiver Project : location

Page 15: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 15

Fasiver Project : location

Page 16: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 16

Redevelopment brownfield Ghent-Flanders

Decontamination

Black-point priority 1

Historical contamination

Treatment and recycling of sludges

Urgent need maintenance rivers

Unique disposal site (permit)

Fasiver Project

Page 17: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 17

Redevelopment brownfield Ghent-Flanders

Industrial zone Urgent need industrial areas

Unique strategic location

Ecological surplus value Decontamination historical black point

Creation of a new green area

Realisation industrial zone without using new open areas

Fasiver Project

Page 18: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 18

CVBA Fasiver

CVBA FASIVER

STUDY PERIOD

DEC 33 %

DOMO 33 %

PUBLIC 33 %

DOMO DEC

DEC

CITY GHENT

OWNER SLUDGE TREATMENT

AND DISPOSAL

PURCHASE AHEAD DECONTAMINATION

Page 19: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 19

CVBA Fasiver

Study period 1997 – 2000

Public Partner Activities

City Ghent - review regional planning

Province of East Flanders - permits : construction

Flemish Environmental environmental

Holding - decontamination studies

- landscape study

Private Partner

DOMO – owner

DEC – contractor

Page 20: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 20

CVBA Fasiver Exploitation period 2001 – 2010

(put-option public partner)

Private partner

Transfer Ownership DOMO–OWNER DEC–CONTRACTOR

Study Period 100 0

Start Exploitation 50 50

End 0 100

Page 21: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 21

CVBA Fasiver

CVBA FASIVER

DEC 50%

DOMO Real Estate 50%

PROVINCE EAST-FLANDERS

FEE OWNER

Sludge Flemisch Administr

ation

DEC

DECONTAMINATION

DOMO

Private owners

Page 22: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 22

Activities 2001 - 2010 Phase 1 2001 – 2004

Decontamination : 5 basins stabilisation and immobilisation Sludge treatment : 450,000 TDS

Phase 2 2005 – 2007 Decontamination : isolation cement-bentonite wall Sludge treatment : 450,000 TDS

Phase 3 2008 – 2010 Decontamination : groundwater remediation Sludge treatment : 450,000 TDS

Page 23: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 23

Basis of remediation Formulation of the problem

175,000 m³ organic viscose sludge Leaching of heavy metal “Innocent owner”

Page 24: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 24

Basis of remediation Proposed solution

Page 25: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 25

1.

In-situ treatment and isolation of the sludge basins

Stabilisation and immobilisation by mixing the sludge

with steal slag and ‘cement’

Semi-mobile mixing unit

Hydraulic excavator with long reach

o No rotating parts

2. Cement-bentonite wall 30 m below ground level

3. HDPE - membrane of 2,5 mm thick

4. Extraction of groundwater in “hot-spots” around the sludge basins

Basis of remediation Proposed solution

Page 26: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 26

Sludge Recycling Centre

16 ha lagooning surface ‘monodisposal site’ for 1,300,000 m³ dredged sediments

Page 27: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 27

Quay wall Maximum supply by waterway

Sludge Recycling Centre

Page 28: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 28

Sludge Recycling Centre

Installation of lagooning fields and monodisposal site Construction of drainage fields and monodisposal site

Page 29: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 29

Exploitation of lagooning fields

Classification of the sediments depending on the

chemical and physical quality

Dewatering / Treatment

Dry matter content to 65 %

Water treatment

Sludge Recycling Centre

Page 30: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 30

natural clay (k < 10-9 m/s)

dredged sediments (k < 10-9 m/s)

drainage

dredged sediments

dredged sediments (k < 10-9 m/s)

top soil

drainage

drainage

3,0m3,2m

4,2m4,

6m

7,4m7,

9m8,2m8,

9m

Structure Disposal Site

Page 31: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 31

Final destination: industrial area

Making open and contaminated area ready for use

Area for Small and Medium Enterprises and high

technology based industry

Strategic location – policy urgency - new industrial

areas in the South of Ghent

Page 32: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 32

Ecological surplus value

Remediation priority black-point

Creation of new green areas

Continuity of green circles along the

Scheldt- and Leievalley

Avoiding the use of new open areas

Page 33: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 33Surface in ha. Total terrain surface 47,52 ha.

21,28

6,13

2,38

7,49 6,75

companiesblackpoint street & parkinggreennature

21,28 20,37

2,38 CompaniesGreenStreet & parking

Page 34: JOHAN MAES – DEC NV DENIS DROUSIE – EXTRACT- ECOTERRES SA

22/04/23 34

Ecological surplus value