Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 1
Thank you for your interest in purchasing “Job Manager” for Dynamics NAV.
“Job Manager” is designed for:
Machine Shops Tool and Die Shops Remanufacture Metal Fabrication Shops Custom Machine Mfg Maintenance and Repair Shops Custom Packaging Furniture and Cabinets Electronic Assemblers Motors and Pumps Print Shops Plastic Processors Vehicle Converters Production Studios Service and Repair Shops Subcontractors Niche Product Mfg. Computer Installers Equipment Refurbishing Research and Development Industrial Equipment Manufacturer many many more…
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 2
COST ALLOCATION FEATURES – > 5 LEVEL WORK BREAK DOWN (WBS)
1. Level 1 = Master Job = Project Level 2 = Sub-Jobs = Job(s) within the Project (Dash Jobs)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 3
2. WBS Level 3 = Group Tasks (Sub-Totals to a Group of Tasks) WBS Level 4 = Task(s) (The Activity that costs are posted to.) (From Job List)
Use the above list of Tasks as a guide to create your perfect Task List. (Similar to the above sample)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 4
3. WBS Level 5 = Posted Transaction (Each Cost Entry with Details) All stored in the Job Ledger Entries
4. Costs are automatically allocated to nine (9) pre-defined global cost categories. 9 Cost Categories: Shop Labor, Field Labor, Machine, Expense, Material, Outside Processing, Overhead, Misc, Transport This is in addition to the User Defined Task List on Page 3!
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 5
5. “Detailed Statistics” for a Side by Side view of Estimated VS Actual Costs: [F7] Visible Cost breakdowns by Cost Categories: Revenue – Cost = Profitability (top to bottom) Estimated Cost – Actual Cost = Variances (left to right)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 6
Job Templates: Setup your Job Process once.
6. Item Card Improvement: Added Task Lines and Planning Lines Acts as a Job Template for Item Manufacturers
This is why it is so important to define your “Task List” as early in the evaluation process as possible.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 7
7. Service Jobs - Task Lines and Planning Lines added to Resource Card. Acts as a Job Template for any Service Businesses.
Again, please send to us your vision for a perfect Task List.
8. When the Job is created a copy of the Item’s Template or Resource’s Template is put in the Planning Job. This acts as “Demand”. You may also edit the Planning Lines as needed on a Job by Job basis. This is part of the Estimating Worksheet.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 8
9. Job Planning Line with extensive analysis of Parts Requirements vs. JTD Used vs. Remaining Demand.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 9
10. Variable Costs or Fixed Costs can be defined on the Item’s BOM or the Job’s Budget Lines
11. Allows for comments on the Tasks for operation instructions. (Process Instructions)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 10
MASTER JOB / SUB JOB FEATURE
12. Master Job, Sub-Job relationships for Project Accounting 1006 is the “Master Job”, 1006-01 is the first “Sub-Job”
This is a great way to view Sub-Job Costs then see the Roll Up at the Master Job Level.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 11
13. Master Job’s Statistics Window rolls up the associated Sub job costs. View progress of Project at the Master Job Level.
14. Job Advanced Setup: Shop Calendar, Numbering Series, much more. (See User Manual for Descriptions)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 12
15. New Job with Default Values (New in NAV 2015)
16. Job Card: Enhanced Information for Job Costing environments. Assign a Job Type Assign a Job Project No. for grouping similar job for reporting
JOB TYPE ASSIGNMENTS: JOB TYPE = ‘ITEM’ - WHEN MAKING A PRODUCT (FG) JOB TYPE = ‘RESOURCE’ - WHEN JOB IS FOR A SERVICE (Repair or Install)
17. Job Card changes for Scheduling: Enhanced Scheduling and Re-Scheduling. - At Task Level by “Step Duration” and “Shop Calendar” - Job’s Task Lines are Start Date updated with a re-schedule. Change the Start Date: It re-schedules to new “Calculated Finish Date” Change the Finish Date: It backward schedules to a new Start Date. Shows: Working Days to Complete & Calendar Days to complete.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 13
Note: “Resource Planner” for Visual Drag & Drop Scheduling can be easily added to Job Manager. Ask us about: Resource Planner.
18. Additional Job Card improvements: - Job Qty Ordered, Job Qty Produced, Job Qty Remaining - Contract Amount - New Fact Boxes for quick job statistics. (Estimate & Actual Cost)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 14
ESTIMATING COSTS AND PRICES
19. New ‘Estimating’ page to show tasks and related planning lines together. (Split View)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 15
20. Totals on Estimating pages to show immediate result of quantity, cost and price changes.
21. Five (5) additional sections of information added to the Task lines: Task Name and structure Setup (original) Setup and Run times and Scheduling Dates Costs per Cost Category Prices per Cost Category Actual Costs per Cost Category Contract Amount and Margin [The Estimating Worksheet is very wide, and can’t be shown here.]
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 16
22. Allow Contract Amount or Contract Margin entry per Task.
23. Allow Contract Amount entry on Job Card that automatically calculates the Contract Amount per Task based on cost ratios.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 17
24. Copy Budgeted Prices to the Task Contract Amount with one click.
25. Ability to create “One Line” or “Multi-line” Sales Quotes from the Job Estimate. (Also can create a Quote Job from a Sales Quote)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 18
26. Ability to append a Sales Quote from the Job Estimate.
SAVE ORIGINAL ESTIMATE
27. Displays the Original Estimate next to the Current Estimate on the Job Statistics Page w/ “Save the Original Estimate”.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 19
28. Job Card: Enhanced Statistics View w/ all Drill Downs to details.
29. View costs split out by the 9 cost categories shown above.
30. Compare Estimated Cost to Actual cost by 9 cost categories. (Variance & Percent Complete.) (Read Left to Right)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 20
31. View profitability on Original Estimate, Current Estimate, and Actual.
Revenue – Cost = Profit Amount
32. View “Earned Revenue” based on Job’s Percent Complete.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 21
33. Job Analysis of Percent Complete on Cost Dollars. Available at Cost Category Level, Job Level, and Job Task Level.
34. Percent Complete calculations with: Revenue Earned, Over/Under Billed, Projected Cost at Completion, Est Cost to Complete, Profit Projections, and JTD Margins.
35. Field reporting of Percent Complete will now calculate a "Projected Cost at Completion". This is great on long duration Jobs.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 22
36. Job projections (Projected Cost at Completion) available by cost categories.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 23
37. Posting of Job Billings (Invoices) shows on Job’s Statistics. (Revenue)
TASK LINE FEATURES
38. Setup and Run time fields on the Job Tasks Lines
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 24
39. Start Date and Finish Date calculations on the posting Job Tasks Lines. Backward calculated from Job Finish Date to Job Start Date.
40. Load Hours - “Load Hours” per Task are "exploded" into a sub-table that shows hours per day. Compare the Machine's Capacity per day to the Load per Day.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 25
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 26
41. Job Planning Line: Planning Date can be controlled by the Job Start Date or the Job Task Start Date.
42. Task Started and Task Finished status fields for visual status
Automatic Checks by activity.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 27
43. Scheduling report provided. Jobs by Start Date.
(Integrated Visual Drag & Drop Scheduling now available too. Ask.)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 28
ENHANCED PURCHASING
44. Vendor: Default COA and Vendor Default Lead Time field.
45. Purchasing of a Resource now allowed on PO Lines.
46. Purchase Order Line Enhancement: Purchase History Instant access to all previous purchases of this item.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 29
47. “Vendor Performance” Report
48. Open Purchase Orders by Expected Receipt Date. (Report # 14004383)
49. Quick Edit Vendor Page: Puts vendors into “Editable” Tabular Page.
JOB MATERIAL PROCUREMENT FEATURE
50. Procurement of “Resources” enables PO Creation for Sub Contractors.
51. Requisition Worksheet, Calculate Plan, enhancement reacts to the Job Demand for Raw Materials. Generation of Requisition Worksheet Entries utilizes Date Filters for appropriate buying quantities and date ranges. Notice Supply and Demand FactBoxes now show on Req. Worksheet Lines!
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 30
52. Direct Purchasing from the Job's Planning Lines. (Push from Job’s Planning Lines) - Generates Requisition Worksheet lines
FLUSHING OPTIONS FOR JOB MATERIAL CONSUMPTION
53. Flushing Options : - Forward
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 31
- Back
- Partial
- Manual
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 32
LABOR ALLOCATIONS
54. New Labor Entry Journal for rapid Time Card Entry Post Labor to Job/Task for detail allocations
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 33
POSTING PRODUCTION ON JOBS
55. Post Units Produced directly in the Job Production Journal. Finished Goods Inventory is increased. Partial production is allowed w/ optional partial flush of RM. Production Qty recorded to Job.
56. Remaining Qty maintained on Job Card. (Job Qty. Ordered - Job Qty. Produced.)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 34
57. Full support for Serial Number and Lot Number tracking at both the FG Level and RM Level. (Requires: Item Tracking Granule)
58. Option to use the Job's "Estimated" Cost Each for Production Costing. (Or Standard Cost from Item Card setup)
59. Option to “Over” Produce
60. Option to record FG that was scrapped and corresponding RM get flushed
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 35
JOB COMPLETION AND HISTORY
61. “Completed” Jobs separated from: Planning, Quote, Order Jobs
Option to move Completed Jobs to History (Posted Documents)
ENHANCED JOB REPORTS
62. Many enhanced Printing Documents (Sales Quotes, Sales Orders, Purchase Orders, Invoices…) Part of "Reports Pack" option, but recommended. Job Manager comes with its own Purchase Order Document
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 36
67. Key Job Costing Reports: Job Level Summary Task Level Detail and Summary Transaction Level Detail Job Traveler for the Shop w/ Picture and Bar Codes. Job Estimate Cost per Part, Cost per Hour, Price per part, Hours per part.
Job Cost Audit
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 37
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 38
Here is the complete list of the included Reports in Job Manager:
ID Name
14004352 Resource Planning Lines
14004353 Job Sub Assembly Traveler (JM)
14004354 Cost Variance at Job Lvl
14004355 Cost Variance at Task Lvl
14004356 Job Analysis Summary-Estimate
14004357 Job Analysis Summary-Est Cust
14004358 Job Analysis Summary-Actual
14004359 Job Analysis Summary-Act Cust
14004360 Job Analysis Summary-Act Proj
14004361 Job Analysis Summary-Act Maste
14004362 Job Analysis Summary-Act Perso
14004363 Job Quote
14004364 Job Planning Line Demand
14004365 Get Job AR Retainage
14004366 Job Profit Analysis
14004367 Requisition Line Report JM
14004368 Planning Availability - JM
14004369 Batch Replace BOM Item
14004370 Mass Calc Current Cost
14004371 Inventory Purch. Advice JM
14004372 Job Register w/Detail JM
14004373 Job Jnl. Test Report-JM
14004374 Copy Qty to Qty to Req.
14004375 Resource Task List - JM
14004376 Calculate Plan-Req. Wksh. (JM)
14004377 Job Purchase Planning
14004378 Job BOM Shortage Report
14004379 Job Traveler Task/Planning
14004380 Standard Cost Change Audit
14004381 Job Billing Analysis
14004382 Item Tasks and Planning Lines
14004383 Job Purchase Order Lines
14004384 Job Profit by Status
14004385 Capacity Analysis
14004386 Resource Ledger Entries - JM
14004387 JC-Std Item Cost (Job)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 39
14004388 Task Level Detail
14004389 Resource Tasks and Planning
14004390 Indented & Costed BOM
14004392 Job Level Summary
14004393 Job Sales Lines
14004394 Job Traveler (JM3)
14004395 Job Estimate
14004396 Job Schedule by Finish Date
14004397 Hrs Variance at Job Lvl (Job)
14004398 Hrs Variance at Task Lvl (Job)
14004399 Indented Cost BOM Process Onl
14004401 Copy to Job Router (Job)
14004403 Copy Item Router/Tasks
14004404 Change Resource Capacity (Job)
14004405 Exchange Job Planning BOM Line
14004406 Job Budg Matls to Jrn (Job)
14004407 Job Cost Audit Report & Varnce
14004408 Job Schedule by Start Date
14004409 Job Material Audit
14004410 Aged Accts Rec'able w/Retainag
14004411 Customer Retainage Detail
14004413 Resource Hours Remaining by R
14004414 Copy Res. Router/Tasks
14004415 Job Production Quantity Change
14004416 Task Resource Re-assignment
14004418 Expected Receipt Report
14004419 Job Budg Labor to Jrn (Job)
14004424 Substitute Items On Plan Line
14004425 Job Purchase Quote Lines
14004426 Job Purch. Quote Lines by Vend
14004427 Percent Completion at Task Lvl
14004428 Job BOM Variance Summary
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 40
ENHANCED ITEM CARD: SUPPLY AND DEMAND INFORMATION
68. Enhanced Item card: New Fact boxes to show Item’s “Supply” and “Demand” New “Job” Tab "Current Cost" VS. "Standard Cost" Availability by Period. Standard Cost includes the Planning Lines. Enhanced BOM w/ Drill to nested BOM Indented & Costed BOM Reports.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 41
66. Function to calculate the “Current Cost” of the item. Uses Planning Lines to calculate the cost You can then update the Standard Cost Displays the Cost Category break down of costs
67. Option to combine multiple Sales Order demand into one Supply Job.
68. Quick Edit Item page (Enables Global Edits in a Tabular Page)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 42
ENHANCEMENTS TO RESOURCES
69. Additional Resource Types. (Resource Type changed to Cost Category) Resource Cost Types: Shop Labor, Field Labor, Machine, Expense, Outside Processing, Overhead, Misc., Transport Resource Fact Box added to Resource List.
70. Set Job Type = Resource for “Service” type jobs.
71. Default Values for each type of resources. Found in the Advanced Setup.
72. Add Tasks and Planning lines to Service type Resources. (Templates)
73. Ability to use Resources on Purchase Lines and Purchase Orders
74. Resource Capacity auto-fill routine. (Periodic Activity)
75. Resource “Machines” w/ Default Setup, Run Time, and Operator Rates.
76. Quick Edit Resource Page.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 43
ENHANCED SALES TO JOBS
77. Sales Order Line Enhancements: View Qty. Available Sales Invoice History Sales Item History. View Item or Service Task List. View Item Planning Lines
78. Options to “Make Jobs” from the Sales Lines (Just this Line, or All Lines)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 44
79. Direct Lookup to Job Card and Job Estimate from Sales Lines.
80. On “Make Job”; Sales Order becomes the “Master Job” and the Line(s) become the “Sub-Jobs”.
81. Ad hoc create Sales Invoices and Sales Credit Memos without having to create Job Contract Lines.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 45
82. Customer Shipment Performance Report
83. Quick Edit Customer Page.
ACCOUNTS RECEIVABLE RETAINAGE
84. Retainage has been added on the AR side. (Jobs and Customers)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 46
85. Allow Multiple Sales Orders with different Bill to Customers to generate
“Revenue” to a single Job.
This is ideal if you have multiple people contributing revenue to a common Job.
Example: Multiple Students to a common Class/Event.
Option per Master Job:
86. New Job Manager Role Center provided
JOBMANAGER – New for RTC. Ideal for the person managing the Jobs
ENTERPRISE – Ideal for the smaller businesses where everyone wears many hats.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 47
87. “Cost True Up for Completed Jobs” (Optional)
When a Job’s Status is Changed from Order to Completed, the Actual Cost of the FG each =
Job’s Actual Cost Each. You can now set an option in the Advanced Setup to have the previous
“Estimated Cost Each” replaced with the Job’s Actual Cost Each. This “True Up” will update the
Job, the Item’s Value Entries, and related General Ledger entries when you run Adjust
Cost/Post Cost.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 48
Notice above how the $14.455 adjustment is posted to the Value Entries.
88. “Bin Contents” is now supported on the Job Journal Entries.
When you post consumption of RM, you can now specify which “bin” is to be relieved.
The process makes all the associated transactions at the bin entries also.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 49
89. Enhanced Job Statistics Window with Cost Category for “Shop Labor” and
“Field Labor”
We have added a 9th Cost Category “Field Labor” to the 8 existing Categories.
This will allow for an easy split of Shop Labor and Field Labor.
90. Estimate and Actual Fact Box Improvement for Revenue
We have added “Estimated Revenue” and “Actual Revenue” to the List Page Fact Box.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 50
91. Stockeepping Units – Added Supply and Demand per Location
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 51
92. Job’s Picture Box is added as a Fact Box.
93. Added easier access to Job’s Periodic Activities
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 52
94. Completed Jobs now has Fact Boxes for Statistics.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 53
95. Outside Processing Resources can now have “Specific Unit Cost”.
It can now optionally pull the cost from the Planning Lines, not the Resource Card. (Works just like NAV
Mfg) This will allow for a Subcontract Vendor to Quote Specific Cost per process they are working on.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 54
96. “Phase Code” has been added to the Task List. [Work Center View]
This is a means of Grouping Tasks together for a Job Level View of Percent Complete on the Group.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 55
97. Resource “Load” Enhancement. – Matrix Window (P14004430)
You can now view each Resources Load by Day, Week, Month, Qtr, or Year.
From the Resource List choose Res. Hours Allocation (JM). You can sort this by Day, Week, Month,
Quarter, or Year. Drill into the supporting “Resource Load Detail” from the desired resource
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 56
98. CAD import Utility for Bill of Materials using XML Ports. (BOM)
You can now import your Bill of Materials directly from your CAD software. Just create
the TXT file, and use our Import Utility to bring the BOM into the Item’s Planning Lines
or if appropriate, into the Job’s Planning Lines.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 57
99. Requisition Worksheet to generate multiple Purchase Quotes to the
vendors you select.
This is a much requested feature. Enable the Requisition Worksheet to generate
Purchase Quotes. Then review the Vendor’s Quotes, select your desired Vendor, and
“Make Purchase Order” from the Purchase Quote.
If the Requisition Line was related to a Job’s Planning Line, then update that Planning
line with the selected Vendor’s Cost Information. Hence, you are improving the
accuracy of your “Estimate” as you approve Vendor Quotes.
100. PO “Committed Cost” By Task
This feature shows the Open Purchase Order’s Value per Task Line.
(Task Detail Window)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 58
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 59
101. Job Profitability Data by Date.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 60
102. CRM Enhancement: Proper Workflow (as of 12/1/13)
(Watch the 60 min Video Webinar on this topic)
New Contact New Opportunity
New Opportunity New Quote (Generate Price from Job Estimate)
Accepted Quote “Make Order”, “Make Order Job”, Make Customer
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 61
103. Ability to Edit the Customer No. on the Job Card.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 62
104. Change Order Management (New in NAV 2017)
A new button has been added to the job list and job card to create a New Change
Order.
w
When this action is chosen, a window will pop up for the user to choose what
type of change order they want to create. (Item or Resource)
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 63
The two fields for the category table are SubJob Code, Description, and Job Type.
Each item or resource that can be used to create a change order job will have a
corresponding subjob category code assigned to it. This allows the user to
choose from multiple items or resources to create a change order job.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 64
You only need to have the 2 Categories Shown:
COI = Change Order from the Item Table (Making an additional Item)
COR = Change Order from the Resource Table (Additional Service)
After the user has chosen the change order subjob category (item or resource) a
list of the available items or resources will be shown. The user then chooses one,
and a change order job is created. It will use the task and planning lines from the
resource or item (template) that was chosen.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 65
Notice that the Change Order can have its own unique Task List for Cost and
Revenue Tracking.
The new change order job will show up in the job list, and from this point forward,
the change order job is treated like any other job.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 66
All usage and production for a change order job is posted direct to the change
order job. The statistics view is per job. You can see ALL of the statistics for
subjobs and change orders from the Master job Statistics window. The Change
Order Job will hold its own Job Ledger Entries too.
This process is all very point and click automated, providing the end-user with an
easy interface that ties the change order to the parent job and master job, while
following all of the standard NAV processes. The numbering system groups the
jobs together within the job list so that they can be easily viewed in hierarchy.
105. Foundation Pack’s 70+ Enhancement are also included. [NAV 2017 ONLY]
Ask for a similar list of Foundation Pack Feature Set.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 67
Job Manager Road Map and Pending Features:
1. Embed Visual Drag and Drop Scheduling for Job Manager.
Using “PlannerOne” Scheduling Software embedded in Job Manager.
DONE - (Now Available. Ask for a Demo)
2. On-Line Help and Video Help Files Too. (Watch Me Tips) –
ACADEMY CLASS- 24/7 On-Line Course!! DONE
3. Combine Job Manager and Manufacturing Plus for those that need
Pre-Production Costing (JM) + Production Costing (NAV Mfg) + On-Site
Training and Setup Services (JM) = Total Project Cost
DONE – ASK FOR DOCUMENTATION OF PROCESS.
4.
5.
Job Manager 2017 with 105 Features
By: www.CostControlSoftware.com Page 68
Produced and distributed by:
Cost Control Software
12409 Old Meridian Street
Carmel, IN 46032
P: (317) 846-6025
F: (317) 566-1526
Visit: www.CostControlSoftware.com for video presentations or call our office
for a private presentation.