1 /22 JHR – Procurement [email protected] JHR Project A high performance Material Testing Reactor under construction Daniel Iracane JHR program director

Transcript of JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR...

Page 1: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

1 /22 JHR – Procurement 23/11/[email protected]

JHR ProjectA high performance Material Testing

Reactor under constructionDaniel Iracane

JHR program director

Page 2: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

2 /22 JHR – Procurement 23/11/2008

Technological irradiation reactors

Material Testing Reactor - MTRGenerate high neutron fluxes

Study the behaviour of materials & fuelsTo meet assessment, qualification and safety requirements

Reproduce different environments (in pressurised water, gas or liquid metal loops)

Produce transients for safety studies

OSIRIS

JHRPower 100 MW

Page 3: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

3 /22 JHR – Procurement 23/11/2008

JHR

Page 4: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

4 /22 JHR – Procurement 23/11/2008

Site preparation – Access road

Closed-off and independent worksite

Page 5: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

5 /22 JHR – Procurement 23/11/2008

JHR process

Detailed design studies are completed 2003-2005~ 300 man.years, 70M€Preliminary safety options assessed by Regulatory Body April 2003Preliminary safety analysis report, realised in March 2006

Design confirmed and decision to launch the construction End 2006500M€ at the 2005 economical condition

Good public acceptationPublic consultation, Public enquiry 04/2005,12/2006Construction permit delivery 09/2007

Development studies 2006-2007site preparation, calls for tenders, qualifications …

Construction phase & tests 2008-2013Excavation 2007-June 08Erection and tests 2009-2013

Start of operations 2014

Page 6: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

6 /22 JHR – Procurement 23/11/2008

JHR site excavation Spring 2007

at Cadarache

Page 7: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

7 /22 JHR – Procurement 23/11/2008Summer 2008

JHR site excavation

Page 8: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

8 /22 JHR – Procurement 23/11/2008

Nuclear Island

Reactor pool

RB Hall

Experimentalarea (cubicles, labs)

Cooling circuits

Nuclear Auxiliaries Building (NAB)

Reactor Building (RB)

Hot cells

Laboratories

NAB Hall

Storage pools

Mechanical workshop

Control rooms

Intermediarystorage pool

Transfert hatch

Truck hatch

Aseismic bearingpads

Page 9: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

9 /22 JHR – Procurement 23/11/2008

JHR water block3 hot cells + 1 alpha cell + 3 non destructive exams posts

3 storage poolsLarge componentsSpent fuelExperimental devices

Page 10: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

10 /22 JHR – Procurement 23/11/2008

20 simultaneous experiments for Gen 2, 3 (PWR & BWR), 4, material & fuel technologiesIn core

Up to 5.5 1014 n/cm².s > 1MeVUp to 1015 n/cm².s > 0.1MeV

In reflectorUp to 5.5 1014 n/cm².s (Φth)

Fixed positions and displacement systems

Fuel studies: up to 600 W/cm with a 1% 235U PWR rod

Fuel experiment

Material ageing(up to 16 dpa/y)

Small locations (Φ~ 32 mm)Large locations (Φ~ 80 mm)

Displacement systems:• To adjust the fissile power• To study transients

Thermal neutron flux

Fast neutron flux

Page 11: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

11 /22 JHR – Procurement 23/11/2008

General organisationFinancing for project construction

Consortium bringing together public and private partnersCEA responsible for the JHR constructionMaterials & work estimate: €300 M (2005 economical condition)

PlayersCEA in charge of the JHR project

Programme Director: Daniel Iracane; [email protected] Manager: Jean-Philippe Elie; [email protected]

Prime contractor: AREVA TA in association with AREVA NP & EDF

ProcurementUnder CEA responsibility with the support of the Prime Contractor

Page 12: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

12 /22 JHR – Procurement 23/11/2008

Sub-contractors

CONSORTIUM

Construction project team

Simulation tools

Future operator

Inte

rface

s

Starting fuel Qualification (U3Si2)

UMO Development

Experimental Devices (Design and

technological development)

User’s facility interface Manager

JHR Program Director

Construction Project leader

Operation and ServicesProject leader

Project organization

Materials & Fuel Project leader

Engineering support

Page 13: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

13 /22 JHR – Procurement 23/11/2008

Project steering schedule

Page 14: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

14 /22 JHR – Procurement 23/11/2008

JHR Procurement

Technical information available (French)Electricity systems : http://www-cadarache.cea.fr/fr/entreprises/projets/rjh/index1.phpMechanical systems : http://www-cadarache.cea.fr/fr/entreprises/projets/rjh/index2.phpFluids systems : http://www-cadarache.cea.fr/fr/entreprises/projets/rjh/index3.php

Purchasing information onhttps://marches.cea.fr/ (French)http://www.simap.europa.eu (English, Information system for European public procurement )Tender notices are published on this website, the single official source of public contracts in Europe. Most of public procurement notices are sent for publication through an electronic channel.

Page 15: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

15 /22 JHR – Procurement 23/11/2008

JHR FACILITY CANDIDATES – FOLLOW-UP TABLE FOR 2008 -2009

Main contracts STATUS

MECHANICAL PACKAGES

C01b Heavy-duty remote manipulators Publication of candidates call programmed for second quarter 2009

C01c Light-duty remote manipulators Publication of candidates call programmed for last quarter 2009

C01c Shielded windows Publication of candidates call and call for tenders programmed for last quarter 2008

C02 Shielded cells laboratories equipments Publication of candidates call programmed for second quarter 2009

C03 Pool liners Publication of candidates call programmed for last quarter 2008

C04 Cranes for Reactor Building & Nuclear Auxiliaries Building

Publication of candidates call programmed for last quarter 2008

C05 Secondary handling means Publication of candidates call programmed for second quarter 2009

C06 Pool internals & stainless steel mechanically welded equipment

Publication of candidates call programmed for third quarter 2009

C08 Loading machines Publication of candidates call programmed for second quarter 2009

Page 16: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

16 /22 JHR – Procurement 23/11/2008

JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009

Main contracts STATUSFLUIDS PACKAGES

D04 Primary pumps Contractualisation in-progress– Notification expected in First Quarter 2009

ELECTRICITY PACKAGES

E01 Electrical systems Publication of candidates call programmed for last quarter 2008

E02 Back-up generators Publication of candidates call programmed for last quarter 2008

D01 Heating Ventilation Air Conditioning Publication of candidates call programmed for last quarter 2008

D02 Fluid Systems Publication of candidates call programmed for last quarter 2008

D03b Primary pipes Publication of candidates call programmed for first quarter 2009

Page 17: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

17 /22 JHR – Procurement 23/11/2008

PROJECT PACKAGES & CONTRACT SCHEDULE

Package B01: Civil engineering - buildings Contactualisation in progressPackage C01: Hot cells NRI (Czech Republic)Packages C01 b/c/e : Hot cell equipments Call for tender 2008-2009Package C02: Shielded cells – laboratory equipments Call for tender 2009Package C03: Pool liner Call for tender 2009Package C04: Cranes for Reactor Building & Nuclear Auxiliaries Building Call for tender 2009Package C05: Other tools and handling systems Call for tender 2009Package C06: Pool internals & mechanically-welded equipment Call for tender 2010Package C07: Reactor block AREVA-TA (2009)Package C08: Loading machine Call for tender 2009Package D01: Heating Ventilation Air Conditioning Call for tender 2009Package D02: Fluid Systems Call for tender 2009Package D03a: Primary heat exchangers in shielded cubicle CIEMAT (ESP)Package D03b: Primary pipes Call for tender 2009Package D04: Primary pumps Contactualisation in progress Package E01: Electrical systems Call for tender 2009Package E02: Back-up generators Call for tender 2009Package E03: Centralised control system AREVA-TA (2009)Packages E05 à E07: Radiation protection Call for tender 2009Package F01 to F07: Contracts for finishings Call for tender 2010 -2012

Page 18: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

18 /22 JHR – Procurement 23/11/2008

Works schedule

Page 19: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

19 /22 JHR – Procurement 23/11/2008

CEA PURCHASING PROCESS

Publication of candidates callCandidates call will be published:

In the European Union Official JournalBy the CEAIn professional journals such as Usine Nouvelle, etc.

General rule for call for tender :Selective calls for tender with advertising

Possible specific procedures :Open calls for tender

Page 20: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

20 /22 JHR – Procurement 23/11/2008

MAIN COMPONENTS OF THE JHR FACILITY

Facility designed for experimental programmes:

Reactor: reactor block, primary system, ancillary systems, safety systems, auxiliaries, ventilationA laboratory/plant set-up: cells, pools, laboratories and hot workshopsHandling means for use in air and underwater required for radioactive fuel elements and experimental devicesElectrical systems and control systems

Page 21: JHR Project A high performance Material Testing Reactor under construction · 2018. 3. 30. · JHR FACILITY CANDIDATES CALLS – FOLLOW-UP TABLE FOR 2008 -2009 Main contracts STATUS

21 /22 JHR – Procurement 23/11/2008

SPECIFIC TECHNICAL CHARACTERISTICS

Nuclear building on seismic pads to limit any seismic loads on equipmentApplication of the French RCC-MX code for mechanical equipment:

RCCM-type rules supplemented by rules applicable to materials not covered by the RCCM: aluminium, ZircaloyUse of European standards

Application of the French Nuclear Pressure Equipment Order (known as the ESPN)