JANUARY FEBRUARY MARCH APRIL MAY JUNE …Project staff meets with contractor to discuss specific...
Transcript of JANUARY FEBRUARY MARCH APRIL MAY JUNE …Project staff meets with contractor to discuss specific...
January2020
People with disabilities may request materials in alternate formats. Kirkland’s policy is to fully comply with Title VI of the Civil Rights Act by prohibiting discrimination against any person on the basis of race, color,
national origin or sex in the provision of benefits and services resulting from its programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with the City. To request an alternate format, file a complaint or for questions about Kirkland’s Title VI Program, contact the Title VI Coordinator at 425.587.3831 (TTY Relay: 711) or [email protected].
Kirkland’s contractor will replace two essential systems that are under-capacity, aging and resulting in excessive maintenanceWHAT: A City of Kirkland contractor begins the 10-month process in late February to upgrade an aging water and sewer main along 108th Avenue Northeast.
Marshbank Construction is replacing the two systems—both more than five decades old—to increase their capacities to serve Kirkland’s growing population and to reduce the systems’ needs for maintenance.
That need is most urgent in the sewer line, which runs from Northeast 68th Street to Northeast 53rd Street. Settling soil has created a sag in the sewer line, allowing sewage to accumulate there and requiring maintenance crews to periodically flush the line.
The contractor is also replacing the water main between Northeast 68th and 60th streets.WHEN: Marshbank’s crews will work 9 a.m. to 3 p.m., Monday through Friday, starting in late February or early March.
n Marshbank will work several nights in 108th Avenue Northeast’s intersection with Northeast 68th Street to connect the water and sewer mains and to pave.
WHAT TO EXPECT: Marshbank will pave the entire width of 108th Avenue Northeast this fall between Northeast 68th and 60th streets.
Between Northeast 60th and 53rd streets, the contractor will pave the center turn lane and southbound lane. Weather could force the contractor to delay its paving schedule until spring 2021.
n King County Metro will re-route some buses around construction zones.
n Marshbank will detour traffic around any closed sections of road and will shift travel lanes to accommodate construction zones.
n The contractor will maintain access for local residents, mail, emergency responders and waste management.
The contractor will establish a detour around closed sections of road. Will be lane closures. lane shifts.
VISIT: www.kirklandwa.gov/108thavewatersewer
CONTACT: Senior Project Engineer Patrick Herbig, (425) 587-3841, [email protected]; or Senior Outreach Coordinator Christian Knight, [email protected], (425) 587-3831.
Water, sewer upgrades begins March on 108th
CARING FOR YOUR INFRASTRUCTURE TO KEEP KIRKLAND HEALTHY, SAFE AND VIBRANT
PROJECTUPDATE
Marshbank Construction is upgrading the water and sewer mains beneath 108th Avenue Northeast.
108T
H A
VE
NE
NE 68TH ST
NE 60TH ST
106T
H A
VE
NE
NE 55TH ST
NE 53RD ST
CR
OSS
KIR
KLAN
D C
OR
RID
OR
NE 65TH ST
NE 55TH LN
112T
H A
VE
NE
110T
H W
AY
NE
103R
D A
VE N
E
NE 58TH ST
NE 62ND ST
112T
H P
L N
E
NE 67TH ST
104T
H A
VE
NE
NE 59TH ST
111T
H L
N N
E
111T
H P
L N
E
NE 61ST PL
105T
H A
VE N
E
NE 65TH LN
111T
H A
VE
NE
113T
H A
VE
NE
110T
H A
VE N
E
NE 64TH ST
111T
H W
AY N
E
NE 60TH WAY
6TH
ST
S
110T
H L
N N
E
NE 65TH PL
109T
H L
N N
E
104T
H P
L N
E
NE 58TH PL
102N
D P
L N
E
NE 60TH LN
NE 59TH PL
NE 61ST CT
NE 58TH ST
NE 64TH ST
NE 62ND ST10
5TH
AV
E N
E
106T
H A
VE
NE
110T
H A
VE
NE
NE 59TH ST
111T
H L
N N
E11
1TH
PL
NE
NE 53RD ST
104T
H A
VE N
E
111T
H A
VE
NE
Carillon Woods
Terrace Park
Northwest University
Emerson High School
International Community School
Kirkland Seventh Day Adventist School
Lakeview Elementary School
Northwest University - 6710 Building
Project staff meets with contractor to discuss specific construction schedules & methods
AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBERJUNE JULYFEBRUARY MARCH APRIL MAYJANUARY
Marshbank Construction upgrades water and sewer mains and repaves 108th Avenue Northeast
LEGENDUpgrade sewer main
Upgrade water main
Utility connection (could require night work)
Repave entire street width
Repave southbound and center turn lane
N
Cierres de callesPara solicitar informacion en Español sobre el cierre de calles comuníquese con el Coordinador del Titulo VI, enviando un mensaje a [email protected] o al número telefónico (425) 587-3831.
道路封闭如果需要获取简体中文通告,请联系Title VI协调员。电邮:[email protected], 电话:(425)587-3831。
Закрытие улицЧтобы запросить этот документ на русском языке, пожалуйста, свяжитесь со старшим координатором по связям с общественностью Титул VI по адресу [email protected], (425) 587-3831.
City of KirklandPublic Works Department123 Fifth AvenueKirkland, WA 98033-6189
PROJECT UPDATE 108th Avenue Northeast water & sewerJanuary 2020
What to expect when Kirkland upgrades water, sewer and stormwater systems
SERVICE LINE CONNECTIONS
1POTHOLING/SAWCUTTING
TRENCHING
INSTALLING MAINS
MAINTENANCE HOLES
VALVES
6
PAVING/RESTORATION
7
2
3
4
5
UPGRADING UTILITIES
Construction begins 2020 on bike, ped bridgeKirkland’s leaders expect construction to begin in 2020 on the
Totem Lake Connector (pictured at right). During the first six months of the bridge’s two-year
construction process, Kirkland’s prospective contractor will be acquiring the materials—mainly steel—to build the bridge and piece sections of it together. That will take place off-site.
When complete in 2022, the Totem Lake Connector pedestrian and bicycle bridge will connect the two ends of the Cross Kirkland Corridor currently severed by Totem Lake Boulevard and Northeast 124th Street.
The bridge will feature an overlook that will extend over the park from the bridge’s loop. The 20-long-foot overlook will taper in width as it extends toward a transparent end-panel.