J. t/' - mowhs.gov.bt · 14 Sangay Dorji 9307024 Executive RO, Trongsa 10.01.2013 5 years...

3
»>: ~ ~ ~ ~ r '. , TRANSFER PROPOSAL 2018 ENDORSED BY THE 13th HRC MEETING HELD ON OCTOBER 12, 2017 ~. I I.) 1 r ';~ i, 0..... i' f; •. ,. ~ , Current Working Date of Joining No. of years in HRC SI.# Name Emp.ID Position Title current WA as Option 1 Option 2 Option 3 Recommendation Agency currentWA Decision on 31.12.2017 Principal RO, Lobeysa v/ 1 Karma Tenzin 9009057 Design Division 01.09.1990 27 years RO Lobeysa RO, Phuntsholing RO, Thimphu (Replacement of Garja Engineer Man Rai) Executive Not recommended 2 Rinchen Khandu 200701035 Bridge Division 01.01.2007 11 years RO, Lobeysa RO, Phuntsholing RO, Thimphu (only senior bridge V Engineer designer) Chador 9106034 Principal RO, Thimphu 31.08.1991 26 years 4 "Cl~ J. 3 Gyeltshen Engineer months RO,Sarpang An~"'( 4 Kinley Dorji 200207049 Engineer RO, Thimphu 01.07.2002 15 years 6 RO, Trongsa (EE, t/' months Construction) 5 Dorjee Tshering 9009058 Asst. Engineer II RO, Thimphu 16.04.2012 5 years 8 RO, Sjongkhar RO, Trashigang RO, Thimphu RO,Sjongkhar ~ months 6 Perna Lhadon 9401087 Asst. Engineer II RO, Thimphu 01.06.2006 11 years 7 Transfer cancelled in 2017 on Royal Command Not recommended V months 7 years 11 Not Recommended 7 Kuenga 200307022 Asst. Engineer II RO, Thimphu 05.02.2010 Thimphu Dzo. DOR HQ RO, Thimphu (going to resign in Dec V months 2017) 8 Tenzin Dema 200507200 Asst. Engineer III RO, Thimphu 26.12.2012 5 years RO, Thimphu Thimphu Dzo. RO, Lobeysa Retain for one year V 9 Tenzin Wangdi 20130101894 Jr. Engineer RO, Thimphu 01.01.2013 5 years RO, Lobeysa RO, Phuntsholing RO, Thimphu RO, Trashigang V 10 Karchung 201101239 Asst. Engineer IV RO, Lobeysa 01.01.2011 7 years RO, Thimphu RO,Sarpang RO, Phuntsholing Retain for one year V (NEWH) 11 Atia Tenzin Doya 20130101897 Jr. Engineer RO, Lobeysa 01.01.2013 5 years RO, Thimphu RO,Sarpang RO, Trongsa RO, Trongsa V 12 Sanjay Kr. 20130101904 Jr. Engineer RO, Lobeysa 01.01.2013 5 years RO,Sarpang RO, Phuntsholing RO, Trongsa . RO, Lingmithang V Bomzan 13 Subas Rai 20130101905 Jr. Engineer RO, Lobeysa 01.01.2013 5 years RO, Phuntsholing RO,Sarpang RO, Trongsa Retain for one year V I(NEWHl 14 Sangay Dorji 9307024 Executive RO, Trongsa 10.01.2013 5 years RO,Sarpang RO, Lobeysa RO, Thimphu Retain for one year V Engineer I(NEWH) 7 years 11 Retain for one year 15 Phuntsho 2007045 Asst. Engineer II RO, Trongsa 1501.2010 RO,Sarpang RO, Lobeysa RO, Phuntsholing (Rafee Khosela V months lnroiectl \ Retain for one year V 16 Rinchen 200901090 Asst. Engineer IV RO, Trongsa 01.01.2009 9 years RO,Sarpang RO, Lobeysa RO, Phuntsholing (Yurmong-Dangdung Bridge project) ~ Krishna Kr. RO, Trongsa 01.01.2012 6 years RO, Lobeysa RO, Tingtibi V 17 20120100021 Asst. Engineer IV RO, Sarpang RO, Tingtibi I Gautam

Transcript of J. t/' - mowhs.gov.bt · 14 Sangay Dorji 9307024 Executive RO, Trongsa 10.01.2013 5 years...

Page 1: J. t/' - mowhs.gov.bt · 14 Sangay Dorji 9307024 Executive RO, Trongsa 10.01.2013 5 years RO,Sarpang RO, Lobeysa RO, Thimphu Retain for one year V Engineer I(NEWH) 7 years 11 Retain

»>:

~

~

~

~

r

'. ,TRANSFER PROPOSAL 2018 ENDORSED BY THE 13th HRC MEETING HELD ON OCTOBER 12, 2017

~. I I.)

1 r ';~ i ,0..... i'

f; •. ,.~ , Current Working Date of Joining

No. of years inHRCSI.# Name Emp.ID Position Title current WA as Option 1 Option 2 Option 3 Recommendation

Agency currentWA Decisionon 31.12.2017

PrincipalRO, Lobeysa v/1 Karma Tenzin 9009057 Design Division 01.09.1990 27 years RO Lobeysa RO, Phuntsholing RO, Thimphu (Replacement of Garja

EngineerMan Rai)

ExecutiveNot recommended

2 Rinchen Khandu 200701035 Bridge Division 01.01.2007 11 years RO, Lobeysa RO, Phuntsholing RO, Thimphu (only senior bridge VEngineerdesigner)

Chador9106034

PrincipalRO, Thimphu 31.08.1991

26 years 4 "Cl~ J.3Gyeltshen Engineer months

RO,SarpangAn~"'(

4 Kinley Dorji 200207049 Engineer RO, Thimphu 01.07.200215 years 6 RO, Trongsa (EE, t/'months Construction)

5 Dorjee Tshering 9009058 Asst. Engineer II RO, Thimphu 16.04.20125 years 8

RO, Sjongkhar RO, Trashigang RO, Thimphu RO,Sjongkhar ~months

6 Perna Lhadon 9401087 Asst. Engineer II RO, Thimphu 01.06.200611 years 7

Transfer cancelled in 2017 on Royal Command Not recommended Vmonths

7 years 11Not Recommended

7 Kuenga 200307022 Asst. Engineer II RO, Thimphu 05.02.2010 Thimphu Dzo. DOR HQ RO, Thimphu (going to resign in Dec Vmonths2017)

8 Tenzin Dema 200507200 Asst. Engineer III RO, Thimphu 26.12.2012 5 years RO, Thimphu Thimphu Dzo. RO, Lobeysa Retain for one year V9 Tenzin Wangdi 20130101894 Jr. Engineer RO, Thimphu 01.01.2013 5 years RO, Lobeysa RO, Phuntsholing RO, Thimphu RO, Trashigang V10 Karchung 201101239 Asst. Engineer IV RO, Lobeysa 01.01.2011 7 years RO, Thimphu RO,Sarpang RO, Phuntsholing

Retain for one year V(NEWH)

11 Atia Tenzin Doya 20130101897 Jr. Engineer RO, Lobeysa 01.01.2013 5 years RO, Thimphu RO,Sarpang RO, Trongsa RO, Trongsa V12

Sanjay Kr.20130101904 Jr. Engineer RO, Lobeysa 01.01.2013 5 years RO,Sarpang RO, Phuntsholing RO, Trongsa . RO, Lingmithang VBomzan

13 Subas Rai 20130101905 Jr. Engineer RO, Lobeysa 01.01.2013 5 years RO, Phuntsholing RO,Sarpang RO, TrongsaRetain for one year VI(NEWHl

14 Sangay Dorji 9307024Executive

RO, Trongsa 10.01.2013 5 years RO,Sarpang RO, Lobeysa RO, ThimphuRetain for one year VEngineer I(NEWH)

7 years 11Retain for one year

15 Phuntsho 2007045 Asst. Engineer II RO, Trongsa 1501.2010 RO,Sarpang RO, Lobeysa RO, Phuntsholing (Rafee Khosela Vmonthslnroiectl

\Retain for one year

V16 Rinchen 200901090 Asst. Engineer IV RO, Trongsa 01.01.2009 9 years RO,Sarpang RO, Lobeysa RO, Phuntsholing (Yurmong-Dangdung

Bridge project)

~ Krishna Kr.RO, Trongsa 01.01.2012 6 years RO, Lobeysa RO, Tingtibi V17 20120100021 Asst. Engineer IV RO, Sarpang RO, TingtibiI Gautam

Page 2: J. t/' - mowhs.gov.bt · 14 Sangay Dorji 9307024 Executive RO, Trongsa 10.01.2013 5 years RO,Sarpang RO, Lobeysa RO, Thimphu Retain for one year V Engineer I(NEWH) 7 years 11 Retain

~ ~

.~ Current Working Date of JoiningNo. of years in

HRC51.# Name Emp.ID Position Title current WA as Option 1 Option 2 Option 3 Recommendation

/ Agency current WA Decisionon 31.12.2017

18 Bumpa Dema 20120100019 Asst. Engineer IV RO, Trongsa 01.01.2012 6 years RO, lingmithang RO, Phuntsholing RO, Sjongkhar RO, lingmithang V19 Thonga Tenzin 200507199 Asst. Engineer III RO, Tingtibi 08.03.2011

6 years 10RO, lingmithang RO, Lobeysa RO, Thimphu RO, Lingmithang Vmonths

20 Sonam Choden 201101249 Asst. EngineerlV RO, Tingtibi 30.04.20125 years 8

RO, Tingtibi RO, Sarpang RO, Lobeysa Retain for one year Vmonths

~ 21 Narayan Timsina 201101243 Asst. Engineer IV RO, Tingtibi 01.01.2011 7 years RO, Phuntsholing RO, Phuntsholing RO, Phuntsholing RO, Phuntsholing VIII

I 22Phuntsho Maya

20130101901 Jr. Engineer RO, Tingtibi 01.01.2013 5 years RO, Phuntsholing RO, Sarpang RO, Lobeysa Retain for one year VI GhishingI

I 23 Shivalal Gurung 20130101899 Jr. Engineer RO, Tingtibi 01.01.2013 5 years RO, Phuntsholing RO, Sarpang RO, Lobeysa Retain for one year~

~ 15.11.2013 4 years (5 V24 Bikash Sharma 20131107222 Jr. Engineer RO, Tingtibi (01.01.2013) years)RO, Phuntsholing RO, Sarpang RO, Lobeysa Retain for one year

12 years 10RO, Thimphu

V25 Wangdi 9907161 Asst. Engineer I RO, Lingmithang 16.02.2005 RO, Lobeysa RO, Sarpang RO, Thimphu (Thimphu Sub-Division

~

monthsI)

26 Tenzin 200307010 Asst. Engineerlll RO, Lingmithang 19.06.20125 years 6

RO, Sarpang RO, Sarpang RO, SarpangRetain for one year Vmonths I(NEWH)

27Tshering

200707072 Asst. Engineer III RO, Lingmithang 01.01.2013 5 years RO, Lobeysa RO, Phuntsholing RO, Sarpang RO, Lobeysa t/'Phuntsho

28San Man

200901092 Asst Engineer IV RO, Lingmithang 01.01.2009 9 years RO, Phuntsholing RO, Sarpang RO, Sjongkhar RO, Phuntsholing V~

Tamang

29 Dechen Duba 20120100025 Asst. Engineer IV RO, Lingmithang 01.01.2012 6 years RO, Sjongkhar RO, Trashigang RO,Sarpang RO, Trashigang t/30 Dorji Phuntsho 20130101895 Jr. Engineer RO, Lingmithang 01.01.2013 5 years RO,Sarpang RO, Phuntsholing RO, Lobeysa RO, Sarpang V)( 31 Thinley Wangmo 20130101906 Jr. Engineer RO, Lingmithang 0101.2013 5 years RO, Lobeysa RO, Thimphu RO, Phuntsholing RO, Trongsa V32 Tashi Penjor 20130101900 Jr. Engineer RO, Lingmithang 01.01.2013 5 years RO, Trashigang RO, Lobeysa RO, Phuntsholing

Retain for one year~(NEWH)

33 Tashi Wangmo 200307029 Asst. Engineer III RO, Trashigang 06.09.20116 years 4

RO, Phuntsholing RO, Lobeysa RO, Sarpang RO, Phuntsholing t,/'a months

34 Arjun Bdr Katwal 200707073 Asst. Engineer IV RO, Trashigang 10.08.20098 years 5

RO, Lobeysa RO, Sarpang RO, Phuntsholing RO, Sarpang ~

~

months

35 Sangay 20130101903 Jr. Engineer RO, Trashigang 01.01.2013 5 years RO, lingmithang RO, Phuntsholing RO, Lobeysa RO, Lingmithang V36

Raju Jimba20130101907 Jr. Engineer RO, Trashigang 01.01.2013 5 years RO, Lobeysa RO,Sarpang RO, Phuntsholing Retain for one year VTamang

/0V Chet Bdr. Principal 6 years 6 Requested for retention on his health ground (Malignant ,AOtA-

37 8908094 RO.Sarpang 01.07.2011 RO, ThimphuMongar Engineer months Neoplasm Nasopharynx) II.

I,. 'Y .~

38 Pema Choki 200307032 Asst. Engineer III RO,Sarpang 01.07.20116 years 6 Requested for retention on mother's health ground

Retain for one year Vmonths (Diabetic foot ulcer & under went in state of acute renal

Page 3: J. t/' - mowhs.gov.bt · 14 Sangay Dorji 9307024 Executive RO, Trongsa 10.01.2013 5 years RO,Sarpang RO, Lobeysa RO, Thimphu Retain for one year V Engineer I(NEWH) 7 years 11 Retain

...

I Current Working Date of JoiningNo. of years in

HRC51.# Name Emp.ID Position Title current WA as Option 1 Option 2 Option 3 Recommendation

Agency currentWA Decisionon 31.12.2017

39 Kunzang 200507202 Asst. Engineer III RO,Sarpang 12.04.20116 years 9

RO, Thimphu RO, Phuntsholing RO, Lobeysa RO, Thimphu v/months

40Khandu

20120100024 Asst. Engineer IV RO, Sarpang 01.01.2012 Requested for retention on domestic ground RO, Tingtibi VWangmo6 years

41Tshering

9407022 Asst. Engineer II RO, Phuntsholing 30.11.20125 years 1

RO, Thimphu RO, Lobeysa RO, SarpangRO, Thimphu (Paro VWangchuk month Sub-Division)

42 Tandin Wangmo 200307027 Asst. Engineer III RO, Phuntsholing 31.12.2012 5 years RO, PIling Piling Thromde Nil Retain for one year V43 Nidup Wangmo 200707088 Asst Engineer IV RO, Phuntsholing 01.07.2007

10 years 6RO. Piling NIL Nil Phuntsholing Thromde Vmonths

Norbu200901087 Asst. Engineer IV RO, Phuntsholing 01.01.2009 9 years RO, Thimphu RO, Lobeysa RO, Sarpang RO, Sarpang V44

Wangchuk

45 Mani Kumar Rai 20120100016 Asst. Engineer IV RO, Phuntsholing 01.01.2012 6 years RO, Lobeysa RO,Sarpang RO, Lingmethang ORIO Project, Dagana ~Department Proposal.

~1 Yeshey Penjor 200801081

Dy. ExecutiveRO, Sjongkhar 29.01.2014

3 years 11 Maintenance Division,

Engineer months DoR HQ

Jambay 2 years 7PM, PCR, SASEC

V2 20150105082 Engineer RO, Phuntsholing 01.06.2015 Project, ConstructionWangchuk months

Division

3 Gopal Subba 200507191 Engineer RO, Sarpang 01.01.2015 3 yearsRO, Sjongkhar (EE, VConstruction)

Transfer Request

1 Dendup Dorji 9707043Dy. Executive

RO, Trashigang 01.02.20143 years 11

RO, Lingmithang (EE, Mtc)RO, Sarpang (Sarpang VEngineer months Sub-Division)

4. Dorji Wangmo, Chief Planning Officer, PPD (Member) 5. Pem Tshewang, Offtg. Director, 05(Member Secretarvl

HRC COMMITTEE MEETING

»Is h<l.o('lt"\ :por): .1. £hade. e.akPa, Offtg. Ire tor, DHS (Member) 3. Tenzin, Director, DoR (Member)