LUSI OverviewJ. B. Hastings
January 2007 Lehman Review Response to Lehman Review Action Item: LUSI Plans
Planning assumptionsPhase IPhase IIMilestones
January 2007 Lehman Review Response to Lehman Review Action Item: LUSI Plans
Planning assumptionsPhase IPhase IIMilestones
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
LUSI SCOPELUSI SCOPE
Atomic, molecular and optical science (AMOS)
Diffraction studies of stimulated dynamics (pump-probe)
Coherent-scattering studies of nanoscale fluctuations (XPCS)
Nano-particle and single molecule coherent x-ray imaging
High energy density science (HEDS)
Aluminum plasma
10-4 10-2 1 102 104
classical plasma
dense plasma
high den. matter
G =1
Density (g/cm-3)
G=10
G=100
t=0
t=
SLAC Report 611
Letters of Intent LCLS Scientific Advisory Committee (SAC) review Defined Thrust Areas
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
6
1 2 34 5
1 SXR Imag Beam Delivery
2 SXR Emission, AMOS (LCLS) Beam delivery (SXR P-P)
3 XR pump-probe Full instrument
4 XPCS Beam Delivery
5 CXI Full instrument
6 HEDS (Funded by others)
1 SXR Imag Beam Delivery
2 SXR Emission, AMOS (LCLS) Beam delivery (SXR P-P)
3 XR pump-probe Full instrument
4 XPCS Beam Delivery
5 CXI Full instrument
6 HEDS (Funded by others)
LCLSLUSIHEDS (NNSA)
Offset MonochromatorExp. ChamberDetector
Beam Transport
Project description (1)Project description (1)
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Project Description (2)Project Description (2)
SXR Imaging
SXR emission
X-ray Pump-probe
LCLS AMOS
XPCS Offset Monochromator
X-ray transport tunnel
XPCS
HEDS (outsideFunding)
Coherent X-ray Imaging
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Beam sharing to maximize scienceBeam sharing to maximize science
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Offset monochromatorOffset monochromator
Thin transmissive crystal
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Project Description (3)Project Description (3)
WBS 1.2 Hard X-ray Pump-probeWBS 1.2 Hard X-ray Pump-probe
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Project description (4)Project description (4)
WBS 1.3 Coherent x-ray imagingWBS 1.3 Coherent x-ray imaging
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Project Description (5)Project Description (5)
WBS 1.4 XPCSWBS 1.4 XPCS
Offset Monochromator
XPCS
Coherent X-ray Imaging
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Hard X-ray Intensity MonitorHard X-ray Intensity Monitor
Compton backscatter from Be foil (up to 10 8 photons)Transmitting ( >98% w/ 100 micron Be)Position information available with use of diode array
5 micron accuracy for commercial fluorescence monitorPositional calibration performed with precision motion (< 2 µm)
Compton backscatter from Be foil (up to 10 8 photons)Transmitting ( >98% w/ 100 micron Be)Position information available with use of diode array
5 micron accuracy for commercial fluorescence monitorPositional calibration performed with precision motion (< 2 µm)
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Hartman Wavefront SensorHartman Wavefront Sensor
Measurement made far from focal planeSingle shot operation120 Hz with CCD modification1.5 nm and 0.15 nm operation with customization
Measurement made far from focal planeSingle shot operation120 Hz with CCD modification1.5 nm and 0.15 nm operation with customization
Image obtained from Imagine Optics, Ltd
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Linac Coherent Light Source (LCLS) Ultrafast Science Instruments (LUSI) SC Project Review, January 23-24, 2006
Action Item
Action Responsible Party Due Date
1. Provide a plan that ensures
LUSI produces science at CD-4 for the LCLS project.
SLAC March 1, 2007
Jerry Hastings Project Director LUSI Project Stanford Linear Accelerator Center
Hanley Lee Federal Project Director DOE Stanford Site Office
Daniel R. Lehman Chairman, Review Committee DOE Office of Science Office of Project Assessment
Keith Hodgson Acting Director Stanford Linear Accelerator Center
Aundra Richards Acting Site Manager DOE Stanford Site Office
Thomas M. Brown Program Manager DOE Office of Science Office of Basic Energy Sciences
Patricia M. Dehmer Associate Director DOE Office of Science Office of Basic Energy Sciences
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Prior FY2007 FY2008 FY2009 FY2010 FY2011 FY2012
3.4 2.6 10 15 15 10 4
March 1, 2007 Action ItemPlanning Assumptions1) Funding profile
2)Instrument priorities1)Coherent Imaging including particle injector2)X-ray pump-probe including sample environments3)XPCS complete to extent possible within funding
3) Establish a phased approach
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
CXI Phase I instrument located in Hutch 3 (temporary home, shared with XPP)
X-ray beam focusing Be lens system for 1 and 2 micron fociSample chamber Sample diagnostics (ion and electron time of flight, visible light), raster stage for
supported sample, port for particle injector, detector stage
Beam diagnosticsControl systemDetector Shared use of LCLS 2 dimensional detector
Delivered at CD-4aDelivered at CD-4a
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
XPP Phase I instrument located in Hutch 3 (permanent home)
X-ray beam focusing Be lens system8 circle diffractometerLaser optics Share the laser system with the AMOS
experimentBeam diagnostics Electro-optic timing sensingControl systemDetector prototype for the LCLS 2 dimensional
detector
Delivered at CD-4aDelivered at CD-4a
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
CXI instrument located in Hutch 5:X-ray beam focusing Be lens system for 10 micron focus, Kirkpatrick
Baez systems for 1 and 0,1 micron fociSample chamber Sample diagnostics (ion and electron time of
flight, visible light), raster stage for supported sample, cryo-EM goniometer for nanosacle objects, the particle injector, detector stage and
the precision instrument stand, capability to add laser sample alignmentBeam diagnostics Incident beam intensity, wavefront sensor
to measure the focal spot size.Control system Complete control system and data acquisition and
storageDetector Shared use of LCLS 2 dimensional detector
optimized for the needs of CXI
Delivered at the end of the ProjectDelivered at the end of the Project
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
XPP instrument located in Hutch 3
X-ray beam focusing Be lens systemOffset monochromator A large offset monochromator to both
provide monochromatic operation of XRPP and permit beam sharing8 circle diffractometerX-ray emission spectrometerLaser optics Dedicated laser system providing both
OPA as well as harmonics Beam diagnostics Complete diagnostic suiteControl system Complete control system and data
acquisition and storageDetector Full 1k x 1k 2 dimensional detector system
Delivered at the end of the ProjectDelivered at the end of the Project
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
XCS instrument located in Hutch 4X-ray beam focusing Be lens systemOffset monochromator A large offset monochromator to permit
‘independent’ operation of XPCS as well as permit beam sharing, including vacuum beam transportMulti-circle diffractometerX-ray pulse split and delay Beam diagnostics Complete diagnostic suiteControl system Complete control system and data
acquisition and storageDetector Full 1k x 1k 2 dimensional detector system
Delivered at the end of the ProjectDelivered at the end of the Project
J. B. [email protected]
LUSI OverviewLCLS FAC March 20, 2007
Schedule (milestones)Schedule (milestones)
CD-1 July 13, 2007 Conceptual designCD-2a December 3, 2007 Baseline established (Phase I)CD-3a March 31, 2008 Construction start (Phase I)CD-4a February 8, 2010 Phase I completeCD-2b October 1, 2009 Baseline established (Phase II)CD-3b March 31, 2010 Construction start (Phase II)CD-4b March 30, 2012 Project complete
Phase I Early Finish October 30, 2009
CD-1 July 13, 2007 Conceptual designCD-2a December 3, 2007 Baseline established (Phase I)CD-3a March 31, 2008 Construction start (Phase I)CD-4a February 8, 2010 Phase I completeCD-2b October 1, 2009 Baseline established (Phase II)CD-3b March 31, 2010 Construction start (Phase II)CD-4b March 30, 2012 Project complete
Phase I Early Finish October 30, 2009