It and Retail

download It and Retail

of 49

Transcript of It and Retail

  • 8/2/2019 It and Retail

    1/49

    Information

    Technology

    and Retail

  • 8/2/2019 It and Retail

    2/49

    Supply Chain Systems

    Enterprise Retail Systems

    Store Operation Systems

    POS

    Inventory Management

    Workforce Management

    Store-Level demand

    Perishable Management

  • 8/2/2019 It and Retail

    3/49

    Need of accurate information and make it available

    to store, warehouse, distributors, etc.

    Before it was used for recording of data of salesonly.

    Today even individual customer can be served asper his needs as highly sophisticated IT systems are

    available now.

  • 8/2/2019 It and Retail

    4/49

    MANUFACTURING RETAIL E-COMMERCE

    DataSynchronization

    DemandPlanning

    MasterPlanning

    InventoryOptimization

    AssortmentPlanning

    ReplenishmentPlanning

    Mark-DownOptimization

    Store

    Development

    ContentManagement

    Back OfficeIntegration

    Supply chainTracking RFID Web site Analytics

    ItemsManagement

    PartnerCollaboration

  • 8/2/2019 It and Retail

    5/49

    Efficient stocking of merchandise,

    Collection of Data,

    Efficiency in operations,

    Helps Communication among departments.

  • 8/2/2019 It and Retail

    6/49

    The scale and the scope of operations,

    The financial resources of organization,

    The nature of business,

    Human Resources Available.

  • 8/2/2019 It and Retail

    7/49

  • 8/2/2019 It and Retail

    8/49

    What is an ERP System?

    Why implement an ERP system?

    How should ERP systems be implemented?

    Conclusion

  • 8/2/2019 It and Retail

    9/49

  • 8/2/2019 It and Retail

    10/49

    Simplistic DefinitionERP - Enterprise Resource Planning

    Detailed Definition

    ERP (Enterprise Resource Planning) systems typically includethe following characteristics:

    An integrated system that operates in real time (or next to

    real time), without relying on periodic updates. A common database, which supports all applications. A consistent look and feel throughout each module. Installation of the system without elaborate application/data

    integration by the Information Technology (IT) department.

  • 8/2/2019 It and Retail

    11/49

  • 8/2/2019 It and Retail

    12/49

  • 8/2/2019 It and Retail

    13/49

  • 8/2/2019 It and Retail

    14/49

    Requests Suggested purchase order

    Blanket orders Receipt of Goods (ROG) Invoice verification

    Materials provided Etc

  • 8/2/2019 It and Retail

    15/49

  • 8/2/2019 It and Retail

    16/49

    Quotations Sales order management

    Blanket orders Sales order production list Shipping processing/Goods issuing Deliveries Invoicing

  • 8/2/2019 It and Retail

    17/49

  • 8/2/2019 It and Retail

    18/49

    Installing an ERP system has many advantages -bothdirect and indirect.

    The direct advantagesa) include improved efficiencyb) information integration for better decision-makingc) faster response time to customer queries

    Tangible benefits are those measured in monetaryterms and intangible benefits cannot be measured inmonetary terms but they do have a very significant

    business impact.

  • 8/2/2019 It and Retail

    19/49

    Tangible benefits: Improves the productivity of process and personnel Lowering the cost of products and services

    purchased Paper and postage cost reductions Inventory reduction Lead time reduction Reduced stock obsolescence

    Faster product / service look-up and orderingsaving time and money Automated ordering and payment, lowering

    payment processing and paper costs

  • 8/2/2019 It and Retail

    20/49

    Intangible benefits: Increases organizational transparency and

    responsibility

    Accurate and faster access to data for timely decisions Can reach more vendors, producing more competitive

    bids ; Improved customer response Saves enormous time and effort in data entry ; More controls thereby lowering the risk of mis-

    utilization of resources Facilitates strategic planning Uniform reporting according to global standards

  • 8/2/2019 It and Retail

    21/49

  • 8/2/2019 It and Retail

    22/49

  • 8/2/2019 It and Retail

    23/49

    Obtain the right mix of people, processesand technology!!

  • 8/2/2019 It and Retail

    24/49

    People Project Structure

    Should be aligned to processes

    Process Implementation Process (outlined in detail)

    Adapt your processes to those of the ERP.

    Technology Hardware

    Software

    Integrated Systems

  • 8/2/2019 It and Retail

    25/49

    1. Definition and Analysis

    Hold discussions with various functional personnelto establish the actual number of systems

    operating at client site, what they are used for, whyand how often

    Produce the Project Scoping Document outlining

    current situation, proposed solution and budgetedtime

    Challenge : REQUIRES EXPERTISE

  • 8/2/2019 It and Retail

    26/49

    2. Design

    Prepare various functional reports - specifies

    current scenario and wish list Prepare Design document which specifies how thesystem is going to work

    Prepare test scripts to be followed on system

    testing Map out the interface paths to various modules

    Challenge : INFORMATION SHARING -Availability of staff

  • 8/2/2019 It and Retail

    27/49

    3.Build

    Configure system as per set up documentspecifications i.e. transfer conceptual modelinto reality

    Test system to verify accuracy (preliminarytests)

    Challenge : TECHNICAL ENVIRONMENT -System functionality

  • 8/2/2019 It and Retail

    28/49

    4. Transition Train users on their specific areas Assist in test data compilation and system

    testing by users Finalise the Live system and captured openingbalances

    Challenge : USER RESISTANCE Understandingand acceptancedata preparation

  • 8/2/2019 It and Retail

    29/49

    Technology is an enabler, not the driver (it isthere to assist the organization to achievebusiness goals)

    It is a means to an end, not the end

  • 8/2/2019 It and Retail

    30/49

    ERP systems provide a mechanism forimplementing systems where a high degreeof integration between applications is

    required.

    To successfully implement, a proper mix of

    people, process and technology should bemaintained.

  • 8/2/2019 It and Retail

    31/49

  • 8/2/2019 It and Retail

    32/49

  • 8/2/2019 It and Retail

    33/49

    Legacy system could not handle 80% annual growthrate of Cisco. Constant band-aids to meet businessneeds resulted in the application becoming toomuch spaghetti.Systems outages became routine exacerbated by thedifficulties of recovering from outages.

    CIOs View point-Each functional area had to make its own decision regardingchanging the legacy system and fund it.

    -Not in favor of ERP solution because it could become a

    mega-project

  • 8/2/2019 It and Retail

    34/49

    January1994:

    The legacy system crashed because a work around due to thesystems inability to perform malfunctioned, corrupting thecentral database.

    Shut down the company for two days.

    Autonomous approach to replacing legacy systems in Order Entry,

    Finance and Manufacturing will not work.

    SVP of Manufacturing took the lead-put together a team in

    February to investigate the replacement

  • 8/2/2019 It and Retail

    35/49

    1. Could not be an IT-only initiative

    -Must have the very best business people on the project.

    2. Need a strong integration partner to assist in both selection andimplementation of the ERP solution.

    3. Selected KPMG because they brought experienced people tothe engagement, not greenies.

    4. Team of 20 people tapped the actual experience of largecorporations and knowledge of sources such as Gartner Group

    -Narrowed the field to 5candidates within 2days

  • 8/2/2019 It and Retail

    36/49

    5. After a week of evaluating the packages at a high level, twoprime candidates were selected Oracle was one.

    Size of the vendor was an issue in the selection.

    6. Team Spent 10 days on the Request for Proposals. Vendors given 2 weeks to respond.

    7. Visited reference clients of each vendor as part of due

    diligence.

    8. Vendors invited for a 3 day software demo.To show how software could meet Ciscos needs using sample

    data from Cisco .

  • 8/2/2019 It and Retail

    37/49

    9. Oracle selected because

    Better manufacturing capability

    Made number of promises about long

    term development of functionality

    Same location as Cisco

    Total Time : 75 daysTime clock: May 1, 1994Next step: Board Approval

  • 8/2/2019 It and Retail

    38/49

    1. Ciscos Financial Year: August 1-July 312. Constraint : Can not implement in Quarter 43. One option : July/August 1995

    4. Rejected it-too late5. Worked back wards :

    Qtr 3 System should go live

    So it would be completely stable for Qtr 4

    Target Date : February 1995Project Time : 9months

  • 8/2/2019 It and Retail

    39/49

    1. Cisco had NO CHOICE but to move2. Three Options

    1. Upgrade legacy system

    2. Replace it in parts

    3. Big bang implementationOne ERP solution for all systems in 9 months time

    3. ERP Project Cost : $ 15 Million

    Single largest capital project at the time

    4. Justification :

    - No CostBenefit Analysis.

    -We are going to do business this way.

    ERP System became one of Ciscos top 7 goals for the year.

  • 8/2/2019 It and Retail

    40/49

    Executive Steering Committee

    - VPs of Manufacturing & customer Advocacy

    - Corporate Controller & CIO

    -Oracles Senior VP of Applications

    - KPMGs Partner-in-charge of West-Coast Consulting Project Management Office

    - Ciscos Business Project Manager

    - KPMGs Project Manager Team of 100 members placed onto one of 5Tracks (process areas)

    - Order Entry, Manufacturing, Finance, Sales/Reporting andTechnology

  • 8/2/2019 It and Retail

    41/49

    Function Area Tracks had

    - Business Leaders, It Leaders

    - Business and IT Consultants (KPMG and Oracle)

    - Users

  • 8/2/2019 It and Retail

    42/49

    Hand-Picked the best and brightest Rules of engagement

    - Short-term

    - No career change

    - It was a challenge To each Person

    - the project was THE opportunity.

  • 8/2/2019 It and Retail

    43/49

    The Project was divided into 4 different versions

    Version 0

    - This version had trainings for the learners.- Configuration of Oracle Packages,- Small Parallel Tiger Team set up by the system

    - Realized that modification were required despitecompelling reasons not to.

  • 8/2/2019 It and Retail

    44/49

    Goal: Make the system work in each track Modeled the business process in detail and documented

    the issues Weekly 3-hour meetings with track leader store solve

    issues Found that software could not support huge number of

    business processes Classified required modifications as Red, Yellow or

    Green Steering Committee had to approve a Red 30 developers needed for 3 months After-sales support needed another package since

    Oracle could not handle it.

  • 8/2/2019 It and Retail

    45/49

    October 1994: Most difficult part of the project Project scope had expanded- Major modifications to Oracle- New after-sales support

    - A data warehouse was necessary Did not convert any history- the data warehouse became the bridging system for

    reporting history and future in an integrated data

    conversion. Final test with full complement of users- Captured a full days business data- re-ran it on a Saturday in January 1995- Team members gave go signal after watching each

    track executing the simulated day.

  • 8/2/2019 It and Retail

    46/49

    1. Over sight by Top Management

    CEO made the project one of the companys top 7 goals for theyear and track edits progress in executive staff meetings,company- wide meetings and board meetings.

    2. Project was NOT an ITonly Initiative

    Hand-picked the best business people to work with ITpersonnel on the project.

    Team of 100 members placed on to one of 5 tracks (processareas).

  • 8/2/2019 It and Retail

    47/49

    1. Implementation Responsibility at Two Levels

    -Executive Steering Committee composed of VPs of

    Manufacturing and Customer Advocacy, CIO, CorporateController and Senior VPs of Vendors.

    -Project Management Office headed by business manager

    overseeing the 5 tracks, each of which had a businessleader and an IT leader jointly overseeing the work of theteam.

  • 8/2/2019 It and Retail

    48/49

    Well Communicated Top Management Commitment Put Best People on Team Can Do Team Attitude

    High Priority in Company Project End Date Defined by Business Factors Select Hungry Vendors Financially Strong Vendors High-Level Vendor Personnel on Steering Committee Structure of Hardware Contract ( Capability- Based ) Seasoned, Experienced Consulting Support.

  • 8/2/2019 It and Retail

    49/49