ISSE JOURNAL 20 Volume 13-3, JUL-AUG-SEP 2011
Indian Society of Structural Engineers ( ISSE ) hasformulated a draft guideline for minimum fees to becharged by the structural engineers for variousassignments. This is based on the feedback receivedfrom its members and based on the discussion during
the committee meetings. ISSE members arerequested to send their feedback and suggestions.
Scope of work for Structural EngineerA) General scope of work1) Preliminary Structural Layout Based Architect'srequirement.2) Finalize Structural lay out with Architect andClient.3) Structural analysis, design, calculation,structural drawing (Excluding fabrication andbar banding schedule). Five sets of drawingswill be provided by consultants.
4) Estimate of structural quantity for tenderpurpose.5) Site visit during execution of work ( two visitsduring foundation work and one visit per slab).Providing structural stability certificate.B) Structural Audit and Inspection of Structure Study of existing drawings for the building, checkfor any additions and alteration based on dataavailable, survey the building from inside and outside,mark the observations and distress on the availableplans, take photographs during the survey for record,preparation and submission of audit report.
C) Project Management consultancy
Coordinate with Client, Architect, Variousconsultants, Contractor. Conduct site meetings atsuitable interval and make progress report for thework. Monitor the project by appointing sitesupervision staff on behalf of the client. Monitor projectprogress and update the barchart.D) Peer review Overall assumptions, load data, framing plansprepared by main consultants will be reviewed briefly.Sample calculations will be checked along with samplemember detailing will be reviewed.Based on the
details provided a review report will be submittedindicating the observations and scope of improvementif any can be mentioned. Once the report is submitted,the scope of peer review ends.E) Proof checking
All the design data, assumptions, analysis, design anddrawings will be scrutinized in detail by the proofconsultant. If required main consultant can be called fordiscussions and clarifications. Proof consultant may
-
7/28/2019 Isse Journal 20 Volume 13
2/7
suggest some improvements in the design / drawings.Proof consultant will certify the design and drawing ofthe main consultant after the necessary revisions indesign and drawingsStages of payment after submitting following details1) Appointment 15%
2) Preliminary drawings andtender quantity 25%3) Foundation 15%4) Super structure 40%5) Completion 5%Note : Fees to be paid after completion of each stage ofwork or three months, which ever is earlier aftersubmitting the bill, ir-respective of work progress atsite.
DRAFT : RECOMMENDED FEE
FOR STRUCTURAL CONSULTANTS- ISSE Committee
2% of
structural lost
Special Structure / Drawing basis
As on 2011
Recommended minimum fees to be charged by Structural consultantUp to 5000
25,000
50,000
1 Lac
2 Lac
5 Lac15.0
12.0
10.0
9.0
8.0
7.0
3%
2%
2%
2%
-
-
Rs. 25,000/-
Extra for high
rise building & its
submission to high
rise committee
B. UP area
-
7/28/2019 Isse Journal 20 Volume 13
3/7
Sq.ft.NormalRs./Sq.ft.(PEB / Shed)Rs./Sq.ft.MinimumScope A
Rs. 50,000/- Scope A
Up to
50,000
1L
Above 1L
12
10
8
6
5
4
Residential BuildingsIndustrial Structures
Sq. Ft. Area
Above 5 Lac
Rate
Rs./ sq.ft.
Percentage
of Total
Structural Cost
Minimum RemarkScope A
6.0
4.0
Per Drawing basis A 1 Rs. 35,000/-
Fees Based on Man hours
Principal Consultant
Senior Structure Engineer
Design Engineer
Sr. Draft man
Draftsman
Rs./hour
3000
1500
1000
750
500
RemarkMinimum Remark
-
7/28/2019 Isse Journal 20 Volume 13
4/7
Rs.50,000/-
ISSE JOURNAL 21 Volume 13-3, JUL-AUG-SEP 2011 1)2)3)
I)
4)I)
II)
III)
IV)
V)
Project Management ConsultantBased on Project Cost 3% of
overall cost
For total
project
coordination
Supervision
site staff to
be paid by
client.
Scope C
Man hour spend
i) Site in - charge
ii) Site Engineer
iii) Site Supervisor
Rs. Per hour
1,500
1,000750
Inspection and Structural Stability Certificate RemarkFor Municipal Corporation
For Factory Inspector
Other
Depending on Area Rs. 1.25 per sq. ft.
Depending on Area Rs. 1.25 per sq. ft.
Depends on Area, Spread, Responsibilities
Structural AuditBased on area
Based on Number of Flats
Rs. 1.25/sq. ft.
Rs. 750
per flat 2BHK
Rs10,000/-
Minimum RemarkScope B
Visit Fees By Structural EngineersWithin
-
7/28/2019 Isse Journal 20 Volume 13
5/7
MCGM
limit
Out
Station
up to 150 KM
Long
Distance
Principal Consultant Rs. 3,500 Rs. 7,000 Rs. 10,000 Visit fees
per person
per day
Senior Structural Engineer Rs. 2,000 Rs. 4,000 Rs. 6,000
( Travel AC class, stay and localtransport to be arranged by client)MinimumRs1,00,00/-
beyond 150 Km
Minimum Remark
Rs. 1,00,000/-Scope BISSE JOURNAL 22 Volume 13-3, JUL-AUG-SEP 2011
7)I)
II)
8)I)
II)
III)
5)6)
I)II)
3% of cost
Scope A
Scope A
2% of cost
or
or
MinimumMinimum Remark
Rs. 1,00,000/-
Bridge Design:Peer Review
(Residential & Commercial Building) Rs. 2/ per sq. ft. 20% of main
consultant's fee
Minimum
Rs25,000/- Scope D
Proof Checking(Residential & Commercial Building) Rs. 5/- per
-
7/28/2019 Isse Journal 20 Volume 13
6/7
sq. ft.
50% of main
consultant's fees
Scope E
Fees for repetitions of the design Up to first
fiverepetitions
50% of fees
for each
repetition
The structure
to be repeated
must be
exactly identical
Beyond except foundation
five
repetitions25% of
original fees
for every repetition
Fees for additional work due tochanges in the design / layouts
Minor
changes
15% of
original fees
Major
changesIn the layout
50% of
original
fees
Marine StructuresMinimum RemarkRemarkRemarkRemark
Rs. 1,00,000/-
Rs. 50,000/-9)10)11)12)13)14)ISSE JOURNAL 23 Volume 13-3, JUL-AUG-SEP 2011
Percentage
-
7/28/2019 Isse Journal 20 Volume 13
7/7
of Total
Structural Cost
Percentage
of Total
Structural Cost