Irfan Ali Khan CV NEW

3
Irfan Ali Khan Address: FLAT B/29, Shoaib Plaza, Block 01, Gulshan-e-Iqbal, Karachi E-mail: [email protected] Phone: +92 332 242 6512 Objective Looking to work as Shift Charge Engineer/Shift Manager in a reputable power plant with a diverse working experience in operations and commissioning of power plants. Work Experience: (16 years) 1. Deputy General Manager, 220MW CCPP Korangi Creek Karachi (December 2011 till date) Responsibilities: Preparation of standard operating procedures for different plant equipments Planning plant Outages in coordination with maintenance sections. Preparing plant forced outage reports. Conducting root cause analyses of plant recurring defects. Supervising overall operations of the plant. Supervise shift Managers in implementations of safety work permit LOTO system Ensuring staff trainings on continuous basis for plant improvement. Supervising shift Engineers in effectively using SAP for raising defects. 2. Shift Manager, 220MW CCPP Korangi Creek Karachi (December 2007 to December 2011) Responsibilities: Safe and reliable operation of GE LM6000PC Sprint, Steam Turbine including auxiliaries system attached to run the complex Providing necessary training to the plant operators to ensure that they have adequate knowledge to carry of respective roles Implementations of safety work permit LOTO to achieve safety while working on plant or equipment. Operation of Natural Gas Compressors (Capacity 26000Nm 3 /hr, Discharge pressure 46Bar).

Transcript of Irfan Ali Khan CV NEW

Page 1: Irfan Ali Khan CV NEW

Irfan Ali KhanAddress: FLAT B/29, Shoaib Plaza, Block 01, Gulshan-e-Iqbal, KarachiE-mail: [email protected] Phone: +92 332 242 6512

ObjectiveLooking to work as Shift Charge Engineer/Shift Manager in a reputable power plant with a diverse working experience in operations and commissioning of power plants.

Work Experience: (16 years)

1. Deputy General Manager, 220MW CCPP Korangi Creek Karachi (December 2011 till date) Responsibilities:

Preparation of standard operating procedures for different plant equipments Planning plant Outages in coordination with maintenance sections. Preparing plant forced outage reports. Conducting root cause analyses of plant recurring defects. Supervising overall operations of the plant. Supervise shift Managers in implementations of safety work permit LOTO system Ensuring staff trainings on continuous basis for plant improvement. Supervising shift Engineers in effectively using SAP for raising defects.

2. Shift Manager, 220MW CCPP Korangi Creek Karachi (December 2007 to December 2011) Responsibilities:

Safe and reliable operation of GE LM6000PC Sprint, Steam Turbine including auxiliaries system attached to run the complex

Providing necessary training to the plant operators to ensure that they have adequate knowledge to carry of respective roles

Implementations of safety work permit LOTO to achieve safety while working on plant or equipment.

Operation of Natural Gas Compressors (Capacity 26000Nm3/hr, Discharge pressure 46Bar). Operation of 220KV (HV), MV & LV switch gear with the coordination of KESC LDC (Load Dispatch

Center). Reliable Operation of Reverse Osmosis plant. Operation of Chiller System for Gas turbine intake Air. Plant operations through Distributed Control System (DCS).

Page 2: Irfan Ali Khan CV NEW

3. Assistant Managerft, Korangi Thermal Power Station, Karachi (November 1999 to December 2007) Configuration is 125 MW Hitachi TCDF Steam Turbine (02), 66 MW GE Steam Turbines (02)

Responsibilities: Water tube Boiler (900,000lb/hr) Natural gas/ Furnace oil fired Start up, Shut down, Normal &

Emergency operation. Tandem Compound double flow reheat condensing turbine Start up, Shut down, Normal &

Emergency operation. Operation of important Auxiliaries like Boiler feed pumps, CW pumps, Condensate pumps, FD

fans GR fans, Air compressors etc. 132KV, MV & LV switch gear operation. Demineralizer plant operation Member of fire fighting Team.

Education:

Bachelor of Engineering (Mechanical)NED University of Engineering and Technology, Karachi.September 1999

Higher Secondary CertificateBoard Of Intermediate Education KarachiAugust 1994

Professional Trainings:

Combined cycle power plant advanced training in CHINA (6 weeks) LM6000 Aero Package Operations/Familiarization training on site by GE experts Hearing Protection Basic First Aid Lockout & Tag out Basic Fire Fighting Risk Assessment/Potential Hazard First Aid First Responder

Reference It shall be furnished upon request.