HUMANITARIAN INTERVENTION IRENA GIORGOU & EMANUELA PARISCIANI IRENA GIORGOU & EMANUELA PARISCIANI.
IRENA SolarCity Simulator
Transcript of IRENA SolarCity Simulator
IRENA SolarCity Simulator
Rapid urbanisation
Population growth
Aging infrastructureEducated citizens
Reliable electricity
Affordable electricity
Smart cities
Energy access issue
Photograph: Shutterstock
Environmental impacts
Issues
Drivers for renewable energy – issues
Rooftop solar PV system – innovative solutions
Sampling Simulator
Requires time
Less timeExpensive Cost effectiveResults not guaranteed
Pilot ProjectsVS
Photograph: Shutterstock
System design
Policy instruments
Incentive schemes
Web application
Photograph: Shutterstock
SolarCity Simulator – objective
How much is the investment return?
How much energy could be generated?
What are the suitable roof areas?
Homeowner GovernmentInvestor
Generation and revenue
Solar resources
Satellite imagery
Technical potential
3D building footprint
SolarCity platformRequirements
Economic potentialSocio-environmental benefits
SolarCity Simulator – methodology
Installation (setting)
• PV capacity• Storage capacity• Panel efficiency• Panel lifespan
Consumption (setting)
• Self-consumption rate• Annual consumption• Electricity price• Benchmark price
Financing
• Loan interest rate • Load period • Down payment
4Rooftop
• Roofs• PV surface
1
2
Policy incentives
• Generation subsidy • Installation subsidy• Corporate tax rate• Corporate tax credit
6System and roof rental cost
• PV system • Storage • Maintenance and operation• Roof rental
3
Environmental impacts
• CO2 emission factor• Particulate matter (PM) emission factor• Nitrogen oxides (NOx) emission factor• Car emission factor• Trees sequestering factor
7
5
How to use the simulator – input parameters
Installation
PV surface
Annual production
Annual consumption
Financing
Upfront investmentPayback to equityTotal revenue Net incomeCash flow
InvestmentPayback to equityEquity Internal Rate of Return
Alternative energy reductionGovernment spending
Environmental and social benefits
CO2 emission reduction
PM and NOx emission reduction
Cars not driven
Trees planted
Jobs created
1 2 3
How to use the simulator – output parameters
Favorable project Unfavorable project
Settlement1
LoanInterest rateDown payment
Selling price2
Electricity priceBenchmark price
Policy incentives3
Generation subsidiesInstallation subsidiesCorporate tax rateCorporate tax credit
Payback to equityNet income
EIRRGHG emission
Job created
Payback to equityNet incomeEIRR
How to build a simulation – guidance
Demo
Rooftop solar PV
Target setting Policy design
Educated citizens
Reliable electricity
Affordable electricity
Environmental impacts
Photograph: Shutterstock
SolarCity Simulator – key messages
System cost
Policy incentives
Energy consumption
System features
PV Capacity
Loan options
Dr. Vincent Kitio,Chief of Urban Energy UnitUN-Habitat
Dr. Marc PerezSenior ResearcherClean Power Research
Mr. Suleiman Babamanu,Technical Project Lead - 5m Solar connections programmeRural Electrification Agency
Peterson D. FrancisMayor, CastriesSaint Lucia
Panel discussion
Dr. Rabia Ferroukhi,Director, Knowledge, Policy and Finance CentreIRENA
Yariv CohenFounder Ignite Power
Questions?
www.irena.org
www.twitter.com/irena
www.facebook.com/irena.org
www.instagram.com/irenaimages
www.flickr.com/photos/irenaimages
www.youtube.com/user/irenaorg