Introduction to HDM-4
Henry KeraliLead Transport SpecialistThe World Bank
![Page 2: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/2.jpg)
Transport and Development
Transport sector is vital for economic & social developmentRoads constitute the largest component of transportRoads require a balance of:
Maintenance (or Preservation)Development (or Improvement)
Objective of Road ManagementConsistent and Rational Policy ObjectivesSufficient and Reliable FundingEffective Procedures & Management Tools
![Page 3: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/3.jpg)
Alignments
Pavement standards
Road standards
HDM-4 Objectives .Economic basis for selecting investment alternatives
![Page 4: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/4.jpg)
HDM-4 Objectives ..
Traffic congestionVehicle emissions
Travel times
Non-motorized transport facilities
Transport costs
Road accidents
Standard framework for investigating road investmentsMinimize Road Agency and Road User Costs
![Page 5: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/5.jpg)
History of the HDM model
de Weille1966
Highway Cost Model1971
Kenya Study1971-75
HDM-II1981
Caribbean Study 1977-82India Study 1976-82Brazil Study 1975-84
HDM-III1987
HDM-VOC Model 41994
HDM-4HDM-420002000
ISOHDMISOHDM
RTIM
(TRRL)
RTIM2
(TRL)
RTIM3
(TRL)
![Page 6: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/6.jpg)
HDM-4 Concept
Predicts road network performance as a function of
Traffic volumes and loading
Road pavement type and strength
Maintenance standards
Environment / Climate
Quantifies benefits to road users from:Savings in vehicle operating costs (VOC)
Reduced road user travel times
Decrease in number of accidents
Environmental effects
![Page 7: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/7.jpg)
Optimum
Total
Road User
Road Works
Cost
Design Standards
Optimum Transport Costs
![Page 8: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/8.jpg)
Road Management
Purpose: To optimise the overall performance of the network over time in accordance with POLICY OBJECTIVES and within budgetary constraints
Typical objectives:Minimise transport costs
Preserve asset value
Provide and maintain accessibility
Provide safe and environmentally friendly transport
![Page 9: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/9.jpg)
Life Cycle Costs
Road Agency CostsManagement, OperationsLabor, Equipment, MaterialsLand acquisitionMaintenance and Rehabilitation
Road User CostsVehicle operationTravel timeRoad accidents
![Page 10: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/10.jpg)
Comparison of Project Alternatives
WithOverlay
WithoutOverlay
Discounted RAC(Road works + RUC)
Project Life (years) End ofAnalysis
NPV
![Page 11: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/11.jpg)
Comparison of Project Alternatives
Cost ofPaving
WithoutPaving
Discounted RAC
Project Life (years) End ofAnalysis
NPV
RUC
![Page 12: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/12.jpg)
Life Cycle Analysis
Discount AnnualCosts & Compare
Predict RoadDeterioration
Predict RoadWork Effects
VOC, Accident & Time costs
OutputNPV, IRR,..
InputData
Repeat for all years
![Page 13: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/13.jpg)
Road Deterioration
Predict long term pavement performancePredict effects of maintenance standardsCalculate annual costs: Road Agency + Road User
Ro
ad C
on
dit
ion
Rehabilitation
Time (years) or Traffic Loading
Maintenance Standard
PavementPerformanceCurve
Good
Poor
![Page 14: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/14.jpg)
Pavement Performance
Pavement Types modelled:Bituminous (AC, ST, etc.)Unsealed (Gravel, Earth, Sand, etc.)Concrete (JPCP, JRCP, CRCP, etc.)Block (Bricks, etc.)
Models from pavement performance experiments in:
Brazil, Kenya, India, South AfricaFrance, USA, Sweden, Finland, Australia
![Page 15: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/15.jpg)
Principles Of Deterioration Models
Models are structured empirical Individual distresses modelled separatelyRelationships are incremental and recursive
dY = K a0 f(X1, X2, X3, etc)
Modelled sequentially through to roughnessMaintenance intervention at end of each year
![Page 16: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/16.jpg)
Cracking Initiation Model
ICA=Kcia{CDS2*a0exp[a1SNP+a2(YE4/
SN2)+CRT}
ICA time to cracking initiation, in years
CDS construction quality
SNP structural number of pavement
YE4 traffic loading
Kcia calibration factor
CRT effect of maintenance
![Page 17: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/17.jpg)
All Cracking Progression
dACA = Kcpa
CDSCRPzA [(zA*a0*a1*tA*YE4*SNPa2
+ SCAa1 )1/a1 - SCA]
CRP = retardation of cracking progression due to preventive treatment
Progression of All cracking commences when tA > 0 or ACAa > 0
![Page 18: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/18.jpg)
t 1 t 1
Wateringress
Furthercracking
Patches
Shear
Unevensurface
Spalling
Fasterdeformation
ROUGHNESS
Potholes
Patches
Time Time
UnevenSurface
Lower strength
Area ofCracking
Rutdepth
Pavement Deterioration Concept
![Page 19: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/19.jpg)
Concrete Roads
Joint SpallingPunch outsCrackingFaultingSlab failuresRiding Quality
Models FromUSAChile
![Page 20: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/20.jpg)
Bituminous Pavements
Predicteddefects:
CrackingRavellingEdge BreakPotholesRiding QualitySkidding
![Page 21: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/21.jpg)
Bituminous Road Deterioration .
![Page 22: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/22.jpg)
Bituminous Road Deterioration ..
![Page 23: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/23.jpg)
Unsealed Roads
![Page 24: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/24.jpg)
Unsealed Road Deterioration ..
![Page 25: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/25.jpg)
Unsealed Road Deterioration …
![Page 26: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/26.jpg)
Road Work Classification
PreservationPreservationRoutine
• Patching, Edge repair
• Drainage, Crack sealing
Periodic• Preventive treatments
• Rehabilitation
• Pavement reconstruction
Special• Emergencies
• Winter maintenance
DevelopmentDevelopment
Improvements• Widening
• Realignment
• Off-carriageway works
Construction• Upgrading
• New sections
![Page 27: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/27.jpg)
Road Works
![Page 28: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/28.jpg)
Road Work Effects
Condition
Traffic / Time
Reconstruct
Overlay
![Page 29: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/29.jpg)
Road User Effects
![Page 30: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/30.jpg)
Road User Effects
Vehicle operating costsfuel, oil, tyres, parts consumptionvehicle utilisation & depreciation
Travel timepassengerscargo
Road accidentsNon-Motorized TransportEnergy consumptionVehicle emissions & noise
![Page 31: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/31.jpg)
RUE Features in HDM-4
Effects of traffic congestion on speed, fuel, tyres and maintenance costsNon-motorised transport modellingEffects of road works on usersTraffic safety impactVehicle emissions impact Vehicle noise impact
![Page 32: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/32.jpg)
Motorised Vehicles
![Page 33: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/33.jpg)
Impact of Road Condition on VOC
Road Condition (IRI)
Roa
d U
ser
Cos
ts (
$/ve
h-km
)
Good Poor
Car
Pickup/utility
Heavy Truck
Bus
Rickshaw
![Page 34: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/34.jpg)
Non-Motorised Transport
![Page 35: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/35.jpg)
Role of HDM-4
Management Function HDM-4 Application
Planning Strategy Analysis
Programming Programme Analysis
Preparation Project Analysis
![Page 36: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/36.jpg)
Road Management Functions
PlanningSetting standards and policiesLong term estimates of expenditure
ProgrammingMedium term work programmes
PreparationDetailed project design and work packaging
OperationsImplementation of works in field
![Page 37: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/37.jpg)
HDM-4 Applications
Road sector policy studies
Strategic planning of road network development, improvement & maintenance
Determination of funding requirements
Preparation of multi-year road work programmes
Economic appraisal of individual road projects
Research studies
Road pricing
Vehicle regulations
Pavement design standards
![Page 38: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/38.jpg)
Standards & Policies
Road pricingroad use costs (to define fuel levies)congestion chargesweight-distance charges
Vehicle regulationsaxle load limitsenergy consumption, vehicle emissions & noise
Engineering Standardssustainable road network sizepavement design and maintenance standards
![Page 39: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/39.jpg)
Strategy Analysis
Objectives:Determine budget allocations for road maintenance and improvementPrepare work programsDetermine long term network performanceAssess impact on road users
Analysis of entire road networks to determine funding needs and predict performance under budget constraints
![Page 40: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/40.jpg)
Strategic Analysis ApproachRoad NetworkRoad Network G F P
LMHMatrixMatrix
Resource Constraints
Optimal Strategy underBudgetary Constraints
PreservationEvaluation
OptimizationModule
Revenues, Sector budgets
Development Candidates
![Page 41: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/41.jpg)
Effect of budget levels
2.0
3.0
4.0
5.0
6.0
2000 2001 2002 2003 2004 2005 2006
Ave
rage
Rou
ghne
ss (
IRI)
$20m
$15m
$10m
AnnualBudget
Target = 3.5 IRI
Primary Roads
![Page 42: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/42.jpg)
Road Network Performance
3.0
4.0
5.0
6.0
7.0
2003 2004 2005 2006 2007 2008 2009
Ave
rage
Rou
ghne
ss (
IRI)
FeederRoads$30m/yr
SecondaryRoads$35m/yr
PrimaryRoads$20m/yr
Budget Allocations
![Page 43: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/43.jpg)
Programme Analysis
Objective: prioritise candidate road projects in each year within annual budget constraintAnnual budgets obtained from strategic maintenance plan
Preparation of single or multi-year expenditure programs under specified budget constraints.
![Page 44: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/44.jpg)
Procedure .
Use specified standards to screen network & identify candidate projects, e.g.
road sections which exceed specified conditionroads with inadequate capacitypavements which need strengtheningupgrade pavements with high traffic volumes
![Page 45: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/45.jpg)
Procedure ..
Determine maintenance or improvement optionsSpecify budget limits & periodsOptimise using selected objectiveProduce optimal list of projects for budget period
![Page 46: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/46.jpg)
Work Programme Output
Priority Road Length Province Type of Scheduled Cost CumulativeRank Section (km) or District Road Work Year $m S$m
1 N1-2 20.5 2 Resealing 2000 5.4 5.42 N4-7 23.5 7 Overlay 40mm 2000 10.9 16.33 N2-5 12.5 5 Reconstruct 2000 8.6 24.94 R312-1 30 4 Widen 4 lane 2000 31.4 56.35 R458-3 36.2 3 Overlay 60mm 2000 16.3 72.6
: : : : : : : :1 N4-16 32.1 6 Reconstruct 2001 22.8 22.82 R13-23 22.4 4 Overlay 40mm 2001 9.7 32.53 N521-5 45.2 2 Widen 4 lane 2001 41.3 73.8
: : : : : : : :1 N1-6 30.2 4 Resealing 2002 8.2 8.22 N7-9 17.8 3 Overlay 60mm 2002 9.2 17.43 F2140-8 56.1 1 Reconstruct 2002 34.9 52.3
: : : : : : : :
20032003200320032003
200420042004
200520052005
![Page 47: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/47.jpg)
Project Appraisal
Project types
New construction, upgrading
Reconstruction, resealing
Widening, lane addition
Non-Motorised Transport lanes
Economic indicators
Net Present Value (NPV)
Economic Rate of Return (ERR)
Benefit Cost Ratio (BCR), NPV/C
First Year Rate of Return (FYRR)
![Page 48: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/48.jpg)
Project Level Outputs
Sensitivity analysis resultsScenario analysisRoad condition indicatorsRoad user cost detailsEnergy & emissions
![Page 49: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/49.jpg)
HDM Technology Set
KnowledgeBase
Software
ModelsSEERDWE
RUE
![Page 50: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/50.jpg)
HDM Series
![Page 51: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/51.jpg)
Conclusions – Why HDM-4?
Transparency of analysis
Life cycle analysis capable of:Short, Medium & Long term analyses
What-if analysis
Internationally accepted analysis framework
Availability of technical expertise
Local calibration
![Page 52: Introduction to HDM-4 Henry Kerali Lead Transport Specialist The World Bank.](https://reader036.fdocuments.us/reader036/viewer/2022062301/56649e8a5503460f94b8f8a8/html5/thumbnails/52.jpg)
Web sites:
http://hdm4.piarc.orghttp://www.bham.ac.uk