OdAN INTRODUCTION TO OD
RESIDENTIAL EXPERIENCE
WELCOME Od is London’s leading fi t-out and refurbishment company in commercial, residential and leisure.
We provide the very best specialist construction skills from project initiation to
completion, and we can cope with any scale project including new builds.
We’re experts in organising people and materials within tight timescales.
Jon Kearney has put together a dedicated team with over 50 years’ collective
experience as London and the South East’s leading high-quality contractor
Within this document you will find a selection of our recently completed
commercial office projects
COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD Projects has over 50 years collective experience as London and South East’s leading High Quality fitout contractor
and we are keen to demonstrate our team player approach by working closely with all members of professional teams on their projects.
We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure a smooth delivery that will exceed a
project team’s expectations.
• OD Projects client list includes Arsenal FC,
Scott Brownrigg, AYH, and Price & Myers.
• Recruitment of Commercial Director
(Managing Surveyor of top fit out company)
• Recruitment of Construction Director (BCO
& FX Quality Award Winner)
• AIB framework contractor.
• OD Projects currently employ 25 staff.
• Achieve British Council for offices corporate member status.
• Sign 5 year lease and fit out Moorgate HQ.
• Jon Kearney finalist for G4_ New Generation Awards –
Entrepreneurship Award.
• Rolls Royce Framework contractor
• Green Apple Award for Digitas
Saatchi & Saatchi
• Instutute of Chartered Accountants
Framework contractor
• Awarded Vogue /Condenast HQ fitout
• Education sector expansion with successful
fitout projects for Partnerships For Schools
and North Herts College
• Savills approved contractor
• High end residential team acknowledged as
leading contractor within sector
• Awarded refurbishment for Royal Albert Hall
2004 2005 2006 2007 2008 2009 2010 2011 2012
In January
Jon Kearney
founds OD Projects.
• Client base expanded to include Royal &
Sun Alliance, O2, AIB, Morley Fund, and GIS
Interpublic.
• Consultants include Gensler, Cushman &
Wakefield, Barr Gazetas, and Leslie Clark.
• Royal & Sun Alliance approved
contractor status.
• OD Projects complete £4 million,
107 Leadenhall, fit out.
• OD Projects achieve ISO9001 status.
• Forecast record turnover of circa £20m in with
Business Plan.
• Official launch of aftercare team ‘ZEROdEFECTS’.
• Successful completion of first Irish project for
Marcus Evans HQ in Dublin.
• Notable project wins for clients such as
Finchatton, BMB Property, United Continental
Airlines, Safestay and Royal London Asset
Management.
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification
achieved for Harris Williams fit out in Mayfair,
SKA silver certificate achieved for Paradigm
Housing in High Wycombe.
• Rebrand of Od which defines our focus and
disciplined approach to achieving quality.
• Od appointed on Savills Estate Agency office
fitout framework
• Repeat business levels at 70% of turnover
and growing
• Notable project wins for Dow Jones, Royal
London Asset Management, Fendi,National
Australia Group and Berkeley Group
Marketing Suites
• Od completes its first hotel refurbishment for
launch of exciting new venture for Safestay in
London
• Od working on over 50000sqft of
Londons super prime residential projects in
Knightsbridge, Kensington & Hampstead
• Od Group formed, divisions focused on
Commercial Fitout, Super prime Residential
and Commercial Design & Build
• OD Expand office space to take another
floor at Sun St HQ
182 8 10 12 14 164 60
(Turnover £m April-April)
2011/2012
20 2422 26
2012/2013
Secured2013/2014 (Projected)
(Turnover £m April-April)
OD Solutions
Secured
Secured OD Interiors
OD Projects
2013/2014 (Projected)
2 8 10 12 144 60
OD GROUP TURNOVER
Secured
Secured2014/2015 (Projected)
TURNOVER
CONFIDENTIALITYIn order for Od to be able to operate effectively we need to ensure that we
maintain the confidence and respect of our clients.
The clients of Od need to have confidence in their dealings with the
Company in the knowledge that any information they provide will not be
passed on to any other person or organisation.
All staff employed by and associates contracted to Od will be expected to
adhere to the company guidelines on confidentiality at all times.
OdPROJECT EXPERIENCE
Knightsbridge• Rutland Gardens
• Montpelier Hall
Kensington• Faroe Road
• De Vere Gardens
• Launceston Place
• Phillimore Gardens
Belgravia• Yeomans Row
• Eaton Square
Mayfair• Shepherd Street
Bayswater• St Petersburgh Place
Central London• Canadian Pacific House
Chelsea• Shawfield Street
• Cheyne Court
St Johns Wood• Blenheim Road
Hampstead• Beaumont Gardens
• Wildwood Road
• West Heath Road
• Kenwood Place
• Winnington Close
• Whitelodge Close
• Pine Grove
Nottinghill• Pembridge Place
Southwark• Bear Pit Apartments
1
2
3
4
6
9
10
7
8
5 11
12
3
45
67
8
9
10
11
RESIDENTIAL EXPERIENCE
Architect: Originate Architects Ltd
Quantity Surveyor: Vincent & Partners
Services Consultant: Chapman Bathurst
Structural Engineer: Michael Alexander
Duration: 63 weeks
Value: £5,000,000
RUTLAND GARDENSKNIGHTSBRIDGE
• Complete demolition & soft strip
• Secant piling to the site boundaries
• A complicated temporary support system &
10m deep basement formation, carried out
as CDP
• High quality stonework
• Whole house ventilation, air-conditioning,
i-Light systems audio visual package
The demolition of an existing two storey property with this prime location in Knightsbridge,
forming a 16m deep basement to the entire site.
Project Manager: AYH
Architect: Hamilton
Quantity Surveyor: AYH
Services Engineer: AWA
Interior Design: Keech Green
Duration: 48 weeks
KENWOOD PLACEHAMPSTEAD
• New mechanical & electrical services
• Audio visual & IT networks
• Specialist joinery
• Extensive stonework
• High quality finishes.
The fit out of a penthouse apartment with 3 bedrooms and bathrooms comprising:
Works included:
Architect: Orbit Architects
Quantity Surveyor: Ridge & Partners LLP
Services Engineer: Hoare Lea
Duration: 20 weeks
CHEYNE COURTCHELSEA
• High spec joinery works
• Underfloor heating
• Electric ceiling heating
• Audio visual installation
Alterations, refurbishment and fitting out works to form a 3 Bedroom Apartment, including:
Project Manager: Cubic
Architect: Stuart Henley & Partners
Structural Engineer: Knapp Hicks & Partners
Interior Design: Gerald Moran
Duration: 55 Weeks
WINNINGTON CLOSEHAMPSTEAD
• Swimming pool, jacuzzi & sauna
• Gym
• Cinema
• Air conditioning
• Lutron lighting
• Underfloor heating
• Full home automation
Detached new build house, comprising 7 bedrooms and bathrooms, contiguous piled caltite
concrete basement and swimming pool. Features of this property include:
Project Manager: Cubic
Architect: Stuart Henley & Partners
Structural Engineer: Knapp Hicks & Partners
Interior Design: Gerald Moran
Duration: 55 Weeks
WHITELODGE CLOSEHAMPSTEAD
• Swimming pool, jacuzzi & sauna
• Gym
• Cinema
• Air conditioning
• Lutron lighting
• Underfloor heating
• Full home automation
Detached new build house, comprising 7 bedrooms and bathrooms, contiguous piled caltite
concrete basement and swimming pool. Features of this property include:
EATON SQUAREBELGRAVIA
Architect: Lifschutz Davidson Sandilands
Quantity Surveyor: Measur
Services Consultant: Tasc
Duration: 56 weeks
The project comprises the design, construction and
fitting out to basement, lower ground and upper ground
levels of approximately 606m² gross internal area.
Works included:
• Basement swimming pool and leisure facility
• Rear mews extension
• High level residential finishes
• Installation of access lift to all floors
• High spec AV installation
• External rooftop inside outside facility
• Staff quarters
BEAUMONT GARDENS LONDON, NW3
Architect: DMFK
Quantity Surveyor: Pierce Hill
Structural Engineer: Michael Alexander
Duration: 70 weeks
The demolition of the existing dwelling and the formation of
a new dwelling with a subterranean basement complete with
swimming pool. Providing five bedrooms and a conservatory
area. The works comprised:
• Demolition & Soft strip;
• Basement formation;
• New superstructure;
• High specification joinery;
• Air conditioning;
• New architectural finishes;
• Hard landscaping.• Staff quarters
SUSTAINABILITYOd is taking positive steps to reduce its own carbon footprint – from the office
environment to the manufacturing process. Wherever possible we control
emissions, recycle, use renewable resources and conserve energy.
We and have received numerous environmental awards and accreditations
including:
• SKA – Silver
• BREEAM – Excellent
• LEED™ – Silver
• Green Apple Award
Just a quick note to thank you for all your hard work on Crawley, In particular I think the BREEAM Excellent is a fantastic result.Well done, great team effort and thank you once again
Philip SuttonDevelopments Project Manager - Property Royal London Asset Management
“ ”
Zero Defects is a commitment Od give to every project.
• Dedicated Aftercare Manager – Paul Kent
• Active involvement in FF&E, Client IT and the migration process
• O & M manuals issued and approved
• Maintenance Contracts in place
• Defect awareness process – simple effective and reactive
ZEROdEFECTS