Page 1: Integration of  MPE activities  in the global  LHC LS1  schedule

1

Integration of MPE activities in the global LHC LS1 schedule

M. Bernardini

MPE Review, November 22-23, 2012M. Bernardini

Page 2: Integration of  MPE activities  in the global  LHC LS1  schedule

Contents

MPE Review, November 22-23, 2012 2M. Bernardini

• LS1– Where, When, What– Skeleton schedule– Access: a crucial point

• MPE activities schedule– ELQA– EE & EP maintenance and consolidation

• LHC coordination

Page 3: Integration of  MPE activities  in the global  LHC LS1  schedule

3

LS1

MPE Review, November 22-23, 2012M. Bernardini

Page 4: Integration of  MPE activities  in the global  LHC LS1  schedule

Where – When - What

• Concerns all the accelerator complex and their experiments

• Starts on February 12th, 2013

• Activities:– Consolidation– Upgrades– Maintenance

M. Bernardini MPE Review, November 22-23, 2012 4

Page 5: Integration of  MPE activities  in the global  LHC LS1  schedule

S12 S23P2 S34P3 S45P4 S56P5 S67P6 S78P7 S81P8

Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.Aug.Sep.

Oct.

Nov.Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.

Aug.Sep.

Oct.

Nov.Dec.

Jan.

Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.Aug.Sep.

Oct.

Nov.Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.

Aug.Sep.

Oct.

Nov.Dec.

Jan.

2013

2014

P1

2013

2014

Feb.Mar.Apr.

Feb.Mar.Apr.

R2E R2

E

LHC machine - skeleton schedule

MPE Review, November 22-23, 2012 5

Beam Commissioning

Ion run

R2E

R2E

Physics

Page 6: Integration of  MPE activities  in the global  LHC LS1  schedule

Access – a crucial point

Access conditions: – IMPACT will be running during the whole LS1, which means that

each activity will be approved by the coordination team and the safety officers.

– From T0 to end of warm-up:• Sec. 23, 45, 56, 78, 81: Restricted/closed mode w.r.t.

powering tests• Sec. 12, 34 & 67: Closed mode from 300K to 80K

– Till start of cool-down: General (underground = free)*– Cool-down: Closed from 300K to 80 K

Restricted after 80K– Powering tests: Restricted / Closed according to the

access matrix

* Points 3 and 7 will be set in general mode, following RP green light

MPE Review, November 22-23, 2012 6M. Bernardini

Page 7: Integration of  MPE activities  in the global  LHC LS1  schedule

Access constraints

MPE Review, November 22-23, 2012 8M. Bernardini

RE

18

RE

22

RE

28

UJ3

2

RE

38

RE

42

RE

48

RE

52

RE

58

RE

62

RE

68

RE

72

RE

78

RE

82

RE

88

RE

12

Pt 5LSSArc 23 LSS Pt 3 LSS Arc 34 LSS

Pt 1LSS Arc 12 LSS Pt 2 LSS

MAY MAY

Arc 81 LSSR2E R2E R2E

Pt 7LSS Arc 78 LSS Pt 8 LSSArc 56 LSS Pt 6 LSS Arc 67 LSSPt 4 LSS Arc 45 LSS

APR

8 8

1 1

FEB FEB

20

13

20

13

2 2

3 3

MAR MAR

4 4

5 5

6 6

7 7

12

APR9 9

10 10

11 11

16 16

13 13

14 14

15 15

12

JUNE

17 17

JUNE18 18

19 19

AUG AUG

26 26

27 27

20 20

JULY

21 21

JULY22 22

23 23

28 28

29 29

30 30

24 24

25 25

SEPT SEPT31 31

32 32

33 33

34 34

42 42

OCT OCT

35 35

36 36

37 37

38 38

47 47

JAN JAN

48 48

43 43

DEC DEC

44 44

45 45

46 46

NOV

39 39

NOV40 40

41 41

20

14

20

14

49 49

50 50

51 51

52 52

FEB FEB53 53

54 54

55 55

56 56

MAR MAR57 57

58 58

59 59

60 60

APR APR

61 61

62 62

63 63

64 64

69 69

JUNE JUNE70 70

71 71

72 72

MAY MAY

65 65

66 66

67 67

68 68

73 73

JULY JULY

74 74

75 75

76 76

77 77

AUG

78 78

AUG79 79

80 80

81 81

82 82

SEPT SEPT

83 83

84 84

85 85

86 86

OCT OCT

87 87

88 88

NOV NOV92 92

93 93

94 94

89 89

90 90

91 91

20

15

20

15

FEB FEB

MAR MAR

DEC

95 95

DEC

96 96

97 97

98 98

APR APR

MAY MAY

99 99

JAN JAN

DFBAK

Cabl

ing

Cam

paig

n

CRYO

CRYO

CRYO

CRYO

EPC 60A

EPC 60A

VSC IV

EPC 60A

EPC 60A

MPE

EE

MPE

EE

MPE EE

DYPBDYPB

DYPB

DYPB

Cool-Down

Cool-Down

Cool-Down

Cool-Down

IC train

ELQA

ELQA

UPS

ELQA

Leak tests

ELQA

Warm Up

IC train

Cool-Down

UPS

Preparation

Flushing

IC train

IC train

IC train

ELQA

Preparation

Flushing

ELQA

Wat

er C

oole

d ca

bles

MKI

gen

erat

ors m

aint

enan

ce

Wat

er C

oole

d ca

bles

WARM UP

ELQA

POWERING TESTS

UPS

POWERING TESTS

ELECTRICAL Maint. (No access)

ELECTRICAL Maint. (No access)

PREPARATION

FLUSHING

COOL DOWN

FLUSHING

PREPARATION

C15R1

A22R1

C30R1

C33R1

C33L2

A29L2

B25R2

A23R2 C

15L3

Q7R3

Q23R3

Q26R3

Q27R3

B32R3

C17R4

B31R4

Colli

mat

or c

ontr

ol

Colli

mat

or c

ontr

olM

KI g

ener

ator

s

MKQ

ARF

ACS

Wat

er C

oole

d ca

bles

Colli

mat

or c

ontr

ol

Wat

er C

oole

d ca

bles

MKD

mai

nten

ance

& a

dd. t

ank

MKD

mai

nten

ance

& a

dd. t

ank

MKD

& M

KB g

ener

ator

s mai

nten

ance

Colli

mat

or c

ontr

ol

Colli

mat

or c

ontr

ol

Colli

mat

or c

ontr

ol

Wat

er C

oole

d ca

bles

Cabl

ing

Cam

paig

n

CV a

ctivi

ties

UPS

relo

catio

nR2

Eca

blin

g fo

r cry

oSh

ield

ing

C15R

1

ELQA

Warm Up

ELQA

Leak tests

A22R

1

C30R

1

C33R

1

C33L

2

A29L

2

UPS

Preparation

Flushing

Warm Up

ELQA

ELQA

Leak tests

A23R

2

B25R

2

IC train

Warm up

ELQA

CSCM

ELQA

Leak tests

Q7R

3

Q23

R3

A26R

3

Q27

R3

B32R

3

Preparation

Flushing

ELQA

C17R

4

B31R

4

UPS

UPS

Preparation

Cool-Down

Flushing

ELQA

ELQA

Warm Up

ELQA

Leak tests

ELQA

Warm Up

ELQA

Leak tests

UPS

UPS

ELQA

ELQA

Preparation

ELQA

Leak tests

UPS

ELQA

ELQA

Warm Up

IC train

PreparationFlushing

Flushing

UPS

Cool-Down

Preparation

Flushing

IC train

ELQA

Leak tests

ELQA

Warm Up

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Beam Commissioning

Physics

Christmas

Com

mis

ioni

ng o

f eq

uipm

ent

Shie

lddi

ng R

R &

UJ

plug

Relo

c.

shie

ldi

ng

Access

Prep

. w

.D

ism

antli

ngPi

ping

Cabl

e Ca

mpa

ign

Cryo

.Pr

ep. w

.D

ism

antli

ngPi

ping

Opt. Fib.

PC

Ethernet

Pipe

s &

UTA

Wat

er C

oole

d ca

bles

Com

mis

ioni

ng o

f eq

uipm

ent

Shie

lddi

ng R

R &

UJ

plug

Relo

c.

shie

ldin

g

Access

Cabl

e Ca

mpa

ign

Cryo

.

Opt. Fib.

PC

Ethernet

CV :

UTA

& p

ipes

Cryo

geni

cs

Com

mis

ioni

ng o

f Ca

blin

g Ca

mpa

ign

Dismantling & dicsonnection

Pipi

ng &

Venti

latio

n W

ater

Co

oled

ca

bles

O.F

. (II

& II

I)

PC

Mov

e ra

cks

Acce

ss

Dismantling & dicsonnection

Cabling campaign

Civi

l eng

inee

ring

(inc

l. pr

otec

tion)

Dis

man

tle

OF

Cryo

geni

cs

Acce

ss

Alar

ms

Cabl

eTr

ayM

ove

rack

s

UTA

Ethe

rnet

Chic

ane

Vacu

um

CE

Cool-Down

Pipe

s &

UTA

Wat

er C

oole

d ca

bles

UPS

UPS

UPS

UPSUPS

UPS

UPS

UPS

UPS

UPS UPS

UPS

UPS

UPS

UPS

Q5L

8

C15L

3

B30R

7

B21L

8

Cabling Sart

Cabling Start

Cabling Sart

Civi

l eng

inee

ring

(inc

l. pr

otec

tion

)

Mur

tym

pan

Shie

lddi

ng R

R 53

Shie

lddi

ng R

R 57

Safe

Roo

m (

I)

Cabl

eTr

ay

Pipi

ngO

.F. (

I))

Div

erse

Wor

ks

Ethe

rnet

Mov

e ra

cks

Com

mis

ioni

ng o

f

0 0

DYPB

DYPB

DYPB

DYPB + MPE EPDYPB + MPE EP

VSC IV

VSC IV

VSC IV

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

ELQA

MPE EP

MPE EP

MPE EP

MPE EP

MPE EP

DYPB

DYPB

UTA

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

DFBX

Cabl

ing

Ca

m

Cabl

ing

Cam

paig

n

REPAIR LEAKS IN QRL 4-5

UPS UPS

UPS

CRYO

CRYO

CRYO

CRYO

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBX

DFBX

DFBX

DFBX

DFBX

DFBX

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

MPEEE

Voies EvacuationVoies Evacuation

Voies EvacuationVoies Evacuation

Voies EvacuationVoies Evacuation

Voies EvacuationVoies Evacuation

Voies Evacuation

SF-

M

SF-

W

UW-M

SF-

M1

SF-W

UW-M

UW-

W

UW-M

UW-

W

UW-

M

SF-

M

SF-

W

UW-

W

SF-M

SF-M

UW-

SF-M

UW-

SF-

M

UW-

SF-M

UW-

SF-

M

UW-

W

DYPB

DYPB

DYPB

DYPB

DYPB

DFBA

MKI

Beam

Vac

uum

A7L1

A4L1

A6L1

A1L1

Beam

Vac

uum

A1R1

A4R1

A6R1

A7R1

Beam

Vac

uum

MKI

TDI

A6L2

A1L2A4L2

B1L2

A7L2

I5L2

A5L2

C4L2

Beam

Vac

uum

A1R2

A4R2

A5R2

A7R2

Beam

Vac

uum

A7L3

B5L3

A5L3

A4L3

IP3

A5R3

B5R3

A7R3

Beam

Vac

uum

A7L4E5L4D5L4B5L4D5R

4E5R4

IP4A6R

4

A7R4

Beam

Vac

uum

A7L5

A6L5B4L5

A1L5A5L5A4L2

Beam

Vac

uum

A1RA4RA5R

B4R5

A6RA7R

Beam

Vac

uum

E5L6

A5L6

A4L6

IP6

IP6

A4R6

C5R6

A5R6

Beam

Vac

uum

A7L7

A7R7

A67B57A57IP7A4RA5RB5RA6R

Beam

Vac

uum

A7L8

A6L8A5L8A1L8

A4L8

Beam

Vac

uum

A4RA1RI5RA6R

B4R8

C4R8

A5R8

MKI

A7R8

Christmas

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

paig

n

Cabl

ing

Cam

pai

gn

Cabl

ing

Cam

paig

n

Safe

Roo

m (

II)

Start Cabling

AUG Tests

Modification ODH (R2E) - No Access

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL GAZ_ANNUAL

GAZ_ANNUAL

GAZ_ANNUAL

GAZ_ANNUAL

GAZ_ANNUALGAZ_ANNUAL

GAZ_ANNUAL

GAZ_ANNUAL

GAZ_ANNUAL

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUART

ERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTE

RLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTE

RLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUAL

ODH_ANNUAL

ODH_ANNUAL

ODH_ANNUAL

ODH_ANNUALODH_ANNUAL

ODH_ANNUAL

ODH_ANNUAL

ODH_ANNUAL

VSC IV

DFBX

Electrical maintenance - No access

Electrical maintenance - No access

Electrical maintenance - No access

Electrical maintenance - No access

Electrical maintenance - No access

Test AUG (R2E)- No access

Test Fire Detection (R2E) - No access

Test Fire Detection (R2E) - No access

Test AUG (R2E) - No access

Electrical maintenance - No access

AUG Tests AUG Tests

AUG Tests

AUG Tests

DSO Tests

AUG Tests

AUG Tests

AUG Tests

Powering testsPowering tests

Powering testsPowering testsPowering tests

Powering testsPowering tests

Powering tests

Powering tests

Powering tests

Powering tests

Powering tests

Powering tests

Powering tests

Powering tests

Powering tests

Powering tests

Powering tests

Electrical maintenance

AUG tests

Page 8: Integration of  MPE activities  in the global  LHC LS1  schedule

S12 S23P2 S34P3 S45P4 S56P5 S67P6 S78P7 S81P8

Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.Aug.Sep.

Oct.

Nov.Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.

Aug.Sep.

Oct.

Nov.Dec.

Jan.

Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.Aug.Sep.

Oct.

Nov.Dec.

Jan.

Feb.Mar.Apr.

May

Jun.

Jul.

Aug.Sep.

Oct.

Nov.Dec.

Jan.

2013

2014

P1

2013

2014

Feb.Mar.Apr.

Feb.Mar.Apr.

10 p

Access & Safety: nb of people in underground

9

PhysicsBeam Commissioning

15 p

20p

20p

20p

20p

10 p

15 p

15 p

15 p

10 p

15 p

15 p

15 p

15 p

15 p

15 p

15p

15p

10 p

10 p

30 p

10 p

30 p

10 p

30 p

50p

10 p

10 p

10 p

10 p

10 p 10

p

85 p85 p

85 p

85 p

85 p

85 p

85 p85 p

30 p

60 p

50 p30 p

20 p

20 p

20 p

30 p

20 p

20 p60 p

50 p30 p20 p

20 p

20 p

20 p 20 p20 p

60 p

50 p30 p20 p

60 p

50 p30 p20 p

60 p

50 p30 p20 p

30 p

60 p

50 p30 p20 p

30 p

60 p20 p

20 p

30 p20 p

60 p

20 p

10 p10 p

10 p

10 p

10 p

10 p

10 p

10 p

30 p

Page 9: Integration of  MPE activities  in the global  LHC LS1  schedule

10

MPE activties

MPE Review, November 22-23, 2012M. Bernardini

Page 10: Integration of  MPE activities  in the global  LHC LS1  schedule

MPE Review, November 22-23, 2012 11

ELQA

Before interconnection consolidation:- @1.9K before warm up;- @ T amb

During SMACC Train

After the IC consolidation- @ T amb- @ 1.9K

M. Bernardini

Page 11: Integration of  MPE activities  in the global  LHC LS1  schedule

SMACC Sequence

12MPE Review, November 22-23, 2012M. Bernardini

Page 12: Integration of  MPE activities  in the global  LHC LS1  schedule

ELQA

MPE Review, November 22-23, 2012 13M. Bernardini

RE

18

RE

22

RE

38

RE

42

RE

48

RE

52

RE

58

RE

62

RE

68

RE

72

RE

78

RE

82

RE

88

RE

12Pt 5 LSSArc 23 LSS Pt 3 LSS Arc 34 LSSPt 1 LSS Arc 12 LSS Pt 2 LSS

MAY MAY

Arc 81 LSSR2E R2E R2E

Pt 7 LSS Arc 78 LSS Pt 8 LSSArc 56 LSS Pt 6 LSS Arc 67 LSSPt 4 LSS Arc 45 LSS

APR

8 8

1 1

FEB FEB

2013

2013

2 2

3 3

MAR MAR4 4

5 5

6 6

7 7

12

APR9 9

10 10

11 11

16 16

13 13

14 14

15 15

12

JUNE

17 17

JUNE18 18

19 19

AUG AUG26 26

27 27

20 20

JULY

21 21

JULY22 22

23 23

28 28

29 29

30 30

24 24

25 25

SEPT SEPT31 31

32 32

33 33

34 34

42 42

OCT OCT35 35

36 36

37 37

38 38

47 47

JAN JAN48 48

43 43

DEC DEC44 44

45 45

46 46

NOV

39 39

NOV40 40

41 41

2014

2014

49 49

50 50

51 51

52 52

FEB FEB53 53

54 54

55 55

56 56

MAR MAR57 57

58 58

59 59

60 60

APR APR61 61

62 62

63 63

64 64

69 69

JUNE JUNE70 70

71 71

72 72

MAY MAY

65 65

66 66

67 67

68 68

73 73

JULY JULY74 74

75 75

76 76

77 77

AUG

78 78

AUG79 79

80 80

81 81

82 82

SEPT SEPT83 83

84 84

85 85

86 86

OCT OCT87 87

88 88

NOV NOV92 92

93 93

94 94

89 89

90 90

91 91

DEC

95 95

DEC96 96

97 97

98 98

99 99

DFBAK

Cabl

ing C

ampa

ign

CRYO

CRYO

CRYO

CRYO

EPC 60A

EPC 60A

VSC IV

EPC 60A

EPC 60A

MPE

EE

MPE

EE

MPE EE

DYPBDYPB

DYPB

DYPB

Cool-Down

Cool-Down

Cool-Down

Cool-Down

IC train

ELQA

Powering tests

ELQA

UPS

ELQA

Leak tests

Powering tests

ELQA

Warm Up

IC train

Cool-Down

UPS

Preparation

Flushing

IC train

Powering tests

Powering tests

IC train

IC train

Powering tests

ELQA

Preparation

Flushing

Powering tests

ELQA

Wat

er C

oole

d ca

bles

MKI

gene

rato

rs m

ainte

nanc

e

Wat

er C

oole

d ca

bles

WARM UP

ELQA

POWERING TESTS

UPS

POWERING TESTS

ELECTRICAL Maint. (No access)

ELECTRICAL Maint. (No access)

PREPARATION

FLUSHING

COOL DOWN

FLUSHING

PREPARATION

C15R1

A22R1

C30R1

C33R1

C33L2

A29L2

B25R2

A23R2 C

15L3

Q7R3

Q23R3

Q26R3

Q27R3

B32R3

C17R4

B31R4

Colli

mat

or co

ntro

l

Colli

mat

or co

ntro

lM

KI ge

nera

tors

MKQ

ARF

ACS

Wat

er C

oole

d ca

bles

Colli

mat

or co

ntro

l

Wat

er C

oole

d ca

bles

MKD

main

tena

nce

& ad

d. ta

nk

MKD

main

tena

nce

& ad

d. ta

nk

MKD

& M

KB ge

nera

tors

main

tena

nce

Colli

mat

or co

ntro

l

Colli

mat

or co

ntro

l

Colli

mat

or co

ntro

l

Wat

er C

oole

d ca

bles

Cabl

ing C

ampa

ign

CV ac

tiviti

esUP

S relo

catio

nR2

Eca

blin

g for

cryo

Shie

ldin

g

C15R

1

Powering tests

ELQA

Warm Up

ELQA

Leak tests

A22R

1C3

0R1

C33R

1C3

3L2

A29L

2

UPS

Preparation

Flushing

Warm Up

ELQA

ELQA

Leak tests

A23R

2B2

5R2

IC train

Warm up

ELQA

CSCM

ELQA

Leak tests

Q7R3

Q23R

3

A26R

3Q2

7R3

B32R

3

Preparation

Flushing

Powering tests

ELQA

C17R

4

B31R

4

UPS

UPS

Preparation

Cool-Down

Flushing

Powering tests

ELQA

ELQA

Warm Up

ELQA

Leak tests

Powering tests

ELQA

Warm Up

ELQA

Leak tests

UPS

UPS

ELQA

Powering tests

ELQA

Preparation

ELQA

Leak tests

UPS

Powering tests

ELQA

Powering tests

ELQA

Warm Up

IC train

PreparationFlushing

Flushing

UPS

Cool-Down

Powering tests

Preparation

Flushing

IC train

ELQA

Leak tests

Powering tests

ELQA

Warm Up

Electrical maintenance - No access

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Christmas

Com

misi

onin

g of

eq

uipm

ent

Shie

lddi

ng R

R &

UJpl

ug

Relo

c . sh

iel

ding

Access

Prep

. w.

Dism

antli

ngPi

ping

Cabl

e Cam

paig

nCr

yo.

Prep . w

.Di

sman

tling

Pipi

ng

Opt. Fib.

PC

Ethernet

Pipe

s & U

TAW

ater

Coo

led

cabl

es

Com

misi

onin

g of

eq

uipm

ent

Shie

lddi

ng R

R &

UJpl

ug

Relo

c . sh

ield

ing

Access

Cabl

e Cam

paig

nCr

yo.

Opt. Fib.

PC

Ethernet

CV : U

TA &

pip

esCr

yoge

nics

Com

misi

onin

g of

Ca

blin

g Cam

paig

n

Dismantling & dicsonnection

Pipi

ng &

Venti

latio

n W

ater

Co

oled

ca

bles

O.F

. (II &

III)

PC

Mov

e ra

cks

Acce

ss

Dismantling & dicsonnection

Cabling campaign

Civi

l eng

inee

ring (

incl.

pro

tecti

on)Di

sman

tle

OF

Cryo

geni

cs

Acce

ss

Alar

ms

Cabl

eTr

ayM

ove

rack

s

UTA

Ethe

rnet

Chic

ane

Vacu

um

Electrical maintenance - No access

CE

Cool-Down

Pipe

s & U

TAW

ater

Coo

led

cabl

es

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

Q5L8

C15L

3

B30R

7

B21L

8

Cabling Sart

Cabling Start

Cabling Sart

Civi

l eng

inee

ring

(incl.

prot

ectio

n)

Mur

tym

pan

Shie

lddi

ng R

R 53

Shie

lddi

ng R

R 57

Safe

Roo

m (I

)Ca

ble

Tray

Pipi

ngO.

F. (

I))

Dive

rse

Wor

ks

Ethe

rnet

Mov

e ra

cks

Com

misi

onin

g of

0 0

DYPB

DYPB

DYPB

DYPB + MPE EPDYPB + MPE EP

VSC IV

VSC IV

VSC IV

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

ELQA

Powering tests

MPE EP

MPE EP

MPE EP

MPE EP

MPE EP

DYPB

DYPB

UTA

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Electrical maintenance - No access

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

DFBX

Cabl

ing

Ca

m

Cabl

ing C

ampa

ign

AUG Tests AUG Tests

AUG Tests

AUG Tests

DSO Tests

REPAIR LEAKS IN QRL 4-5

AUG Tests

UPS

UPS

UPS

CRYO

CRYO

CRYO

CRYO

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBX

DFBX

DFBX

DFBX

DFBX

DFBX

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

MPEEE

Electrical maintenance - No access

Electrical maintenance - No access

Voies Evacuation

Voies EvacuationVoies Evacuation

Voies EvacuationVoies Evacuation

Voies Evacuation

Voies EvacuationVoies Evacuation

Voies Evacuation

SF-

M

SF-

W

UW-M

SF-

M1

SF-W

UW-M

UW-

W

UW-M

UW-

W

UW-M

SF-

M

SF-

W

UW-

W

SF-

M

SF-M

UW-M

SF-M

UW-

SF-

M

UW-

SF-M

UW-

SF-

M

UW-

W

DYPB

DYPB

DYPB

DYPB

DYPB

DFBA

MKI

Beam

Vac

uum

A7L1

A4L1

A6L1

A1L1

Beam

Vac

uum

A1R1

A4R1

A6R1

A7R1

Beam

Vac

uum

MKI

TDI

A6L2

A1L2A4L2

B1L2

A7L2

I5L2

A5L2

C4L2

Beam

Vac

uum

A1R2

A4R2

A5R2

A7R2

Beam

Vac

uum

A7L3

B5L3

A5L3

A4L3

IP3

A5R3

B5R3

A7R3

Beam

Vac

uum

A7L4E5L4D5L4B5L4D5R

4E5R4

IP4A6R

4

A7R4

Beam

Vac

uum

A7L5

A6L5B4L5

A1L5A5L5A4L2

Beam

Vac

uum

A1RA4RA5R

B4R5

A6RA7R

Beam

Vac

uum

E5L6

A5L6

A4L6

IP6

IP6

A4R6

C5R6

A5R6

Beam

Vac

uum

A7L7

A7R7

A67B57A57IP7A4RA5RB5RA6R

Beam

Vac

uum

A7L8

A6L8A5L8A1L8

A4L8

Beam

Vac

uum

A4RA1RI5RA6R

B4R8

C4R8

A5R8

MKI

A7R8

Christmas

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Cabl

ing

Cam

paig

n

Cabl

ing C

ampa

ign

Cabl

ing

Cam

pai

gn

Cabl

ing C

ampa

ign

Test AUG (R2E)- No accessSa

fe R

oom

(II)

Test Fire Detection (R2E) - No access

Test Fire Detection (R2E) - No access

Start Cabling

Test AUG (R2E) - No accessAUG TestsAUG Tests

Modification ODH (R2E) - No Access

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUART

ERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTE

RLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTE

RLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

AUG Tests

VSC IV

Electrical maintenance - No access

DFBX

Detection Incendie_ANNUAL

ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_A

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_A

FLASH TEST ODH_ANNUAL

OF_CONOF_CON

OF_CON

OF_CON

OF_CO

OF_REM

OF_REM

OF_REM

OF_REM

OF_REM

OF_REM

O_REMF

OF_REMO

O

OF_CONOF_CO

OF_REM

OF_REM

O

O

OO

O

O

Page 13: Integration of  MPE activities  in the global  LHC LS1  schedule

IC train: arc 56

14M. Bernardini

Page 14: Integration of  MPE activities  in the global  LHC LS1  schedule

M. Bernardini

IC trainDFBA

DFBX

Powering testsELQA

ELQA

Leak tests

Warm up

Preparation

Flushing

Open W

Open MDesolder BB (15%)Solder BB (15%)

ShuntDiodesWeld MLeak Tests MNon Conformities M

Close W

Leak tests W

PAQ

Elec. non conformities

NOV

2013

AUG

SEPT

OCT

FEB

MAR

APR

MAY

JUNE

JULY

Detailed train arc 56

Page 15: Integration of  MPE activities  in the global  LHC LS1  schedule

TRAIN TRAIN

6h00 8h00 11h00 15h00

Electrical non conformities

17h0010h00

HV ELQAPreparation

ELQA

6h00

Transport et RX

23h00

Train A Train

Daily activities

MPE Review, November 22-23, 2012 16M. Bernardini

Page 16: Integration of  MPE activities  in the global  LHC LS1  schedule

MPE Review, November 22-23, 2012 17

Maintenance & consolidation

Electrical Engineering:• Consolidation of the extraction breakers 600A • Installation of snubber capacitor banks in the RFQ/RQD circuits • Revision of DQS in quadrupoles • Replacement of the arc chutes on quadrupoles• DQRB dump resistors (13kA)• Upgrade and ELQA of cabling for IPQ’s and IPD’s• Controls & ACQ topics – field –bus changes• nQPS extension and completion

Electronics for Protection• BIS Change the CPU module of all VME systems installed in the LHC • DYPB activities (only underground activities are included in the schedule)• Replace the CIBF units:• Install f-o monitoring for the beam permits loops:• SMP – change the CPU module for two SMP controllers:• Energy extraction for the 600A circuits mitigation package:• Maintenance and protection of 600A and quench loop controller

M. Bernardini

Page 17: Integration of  MPE activities  in the global  LHC LS1  schedule

MPE Review, November 22-23, 2012 18

Maintenance & consolidation

DYPB:- 2 wks/arc for dismounting and 2 wks/arc for

reinstalling

Electrical Engineering- 6 wks/point at pt 2, 4, 6 and 8- 1 wk/pt at 1,3,5,7 (for DQRB)

Electronics for Protection- 1 wk/sector

M. Bernardini

Page 18: Integration of  MPE activities  in the global  LHC LS1  schedule

MPE Review, November 22-23, 2012 19M. Bernardini

RE

18

RE

22

RE

38

RE

42

RE

48

RE

52

RE

58

RE

62

RE

68

RE

72

RE

78

RE

82

RE

88

RE

12Pt 5 LSSArc 23 LSS Pt 3 LSS Arc 34 LSSPt 1 LSS Arc 12 LSS Pt 2 LSS

MAY MAY

Arc 81 LSSR2E R2E R2E

Pt 7 LSS Arc 78 LSS Pt 8 LSSArc 56 LSS Pt 6 LSS Arc 67 LSSPt 4 LSS Arc 45 LSS

APR

8 8

1 1

FEB FEB

2013

2013

2 2

3 3

MAR MAR4 4

5 5

6 6

7 7

12

APR9 9

10 10

11 11

16 16

13 13

14 14

15 15

12

JUNE

17 17

JUNE18 18

19 19

AUG AUG26 26

27 27

20 20

JULY

21 21

JULY22 22

23 23

28 28

29 29

30 30

24 24

25 25

SEPT SEPT31 31

32 32

33 33

34 34

42 42

OCT OCT35 35

36 36

37 37

38 38

47 47

JAN JAN48 48

43 43

DEC DEC44 44

45 45

46 46

NOV

39 39

NOV40 40

41 41

2014

2014

49 49

50 50

51 51

52 52

FEB FEB53 53

54 54

55 55

56 56

MAR MAR57 57

58 58

59 59

60 60

APR APR61 61

62 62

63 63

64 64

69 69

JUNE JUNE70 70

71 71

72 72

MAY MAY

65 65

66 66

67 67

68 68

73 73

JULY JULY74 74

75 75

76 76

77 77

AUG

78 78

AUG79 79

80 80

81 81

82 82

SEPT SEPT83 83

84 84

85 85

86 86

OCT OCT87 87

88 88

NOV NOV92 92

93 93

94 94

89 89

90 90

91 91

DEC

95 95

DEC96 96

97 97

98 98

99 99

DFBAK

Cabl

ing C

ampa

ign

CRYO

CRYO

CRYO

CRYO

EPC 60A

EPC 60A

VSC IV

EPC 60A

EPC 60A

Cool-Down

Cool-Down

Cool-Down

Cool-Down

IC train

ELQA

Powering tests

ELQA

UPS

ELQA

Leak tests

Powering tests

ELQA

Warm Up

IC train

Cool-Down

UPS

Preparation

Flushing

IC train

Powering tests

Powering tests

IC train

IC train

Powering tests

ELQA

Preparation

Flushing

Powering tests

ELQA

Wat

er C

oole

d ca

bles

MKI

gene

rato

rs m

ainte

nanc

e

Wat

er C

oole

d ca

bles

WARM UP

ELQA

POWERING TESTS

UPS

POWERING TESTS

ELECTRICAL Maint. (No access)

ELECTRICAL Maint. (No access)

PREPARATION

FLUSHING

COOL DOWN

FLUSHING

PREPARATION

C15R1

A22R1

C30R1

C33R1

C33L2

A29L2

B25R2

A23R2 C

15L3

Q7R3

Q23R3

Q26R3

Q27R3

B32R3

C17R4

B31R4

Colli

mat

or co

ntro

l

Colli

mat

or co

ntro

lM

KI ge

nera

tors

MKQ

ARF

ACS

Wat

er C

oole

d ca

bles

Colli

mat

or co

ntro

l

Wat

er C

oole

d ca

bles

MKD

main

tena

nce

& ad

d. ta

nk

MKD

main

tena

nce

& ad

d. ta

nk

MKD

& M

KB ge

nera

tors

main

tena

nce

Colli

mat

or co

ntro

l

Colli

mat

or co

ntro

l

Colli

mat

or co

ntro

l

Wat

er C

oole

d ca

bles

Cabl

ing C

ampa

ign

CV ac

tiviti

esUP

S relo

catio

nR2

Eca

blin

g for

cryo

Shie

ldin

g

C15R

1

Powering tests

ELQA

Warm Up

ELQA

Leak tests

A22R

1C3

0R1

C33R

1C3

3L2

A29L

2

UPS

Preparation

Flushing

Warm Up

ELQA

ELQA

Leak tests

A23R

2B2

5R2

IC train

Warm up

ELQA

CSCM

ELQA

Leak tests

Q7R3

Q23R

3

A26R

3Q2

7R3

B32R

3

Preparation

Flushing

Powering tests

ELQA

C17R

4

B31R

4

UPS

UPS

Preparation

Cool-Down

Flushing

Powering tests

ELQA

ELQA

Warm Up

ELQA

Leak tests

Powering tests

ELQA

Warm Up

ELQA

Leak tests

UPS

UPS

ELQA

Powering tests

ELQA

Preparation

ELQA

Leak tests

UPS

Powering tests

ELQA

Powering tests

ELQA

Warm Up

IC train

PreparationFlushing

Flushing

UPS

Cool-Down

Powering tests

Preparation

Flushing

IC train

ELQA

Leak tests

Powering tests

ELQA

Warm Up

Electrical maintenance - No access

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Christmas

Com

misi

onin

g of

eq

uipm

ent

Shie

lddi

ng R

R &

UJpl

ug

Relo

c . sh

iel

ding

Access

Prep

. w.

Dism

antli

ngPi

ping

Cabl

e Cam

paig

nCr

yo.

Prep . w

.Di

sman

tling

Pipi

ng

Opt. Fib.

PC

Ethernet

Pipe

s & U

TAW

ater

Coo

led

cabl

es

Com

misi

onin

g of

eq

uipm

ent

Shie

lddi

ng R

R &

UJpl

ug

Relo

c . sh

ield

ing

Access

Cabl

e Cam

paig

nCr

yo.

Opt. Fib.

PC

Ethernet

CV : U

TA &

pip

esCr

yoge

nics

Com

misi

onin

g of

Ca

blin

g Cam

paig

n

Dismantling & dicsonnection

Pipi

ng &

Venti

latio

n W

ater

Co

oled

ca

bles

O.F

. (II &

III)

PC

Mov

e ra

cks

Acce

ss

Dismantling & dicsonnection

Cabling campaign

Civi

l eng

inee

ring (

incl.

pro

tecti

on)Di

sman

tle

OF

Cryo

geni

cs

Acce

ss

Alar

ms

Cabl

eTr

ayM

ove

rack

s

UTA

Ethe

rnet

Chic

ane

Vacu

um

Electrical maintenance - No access

CE

Cool-Down

Pipe

s & U

TAW

ater

Coo

led

cabl

es

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

UPS

Q5L8

C15L

3

B30R

7

B21L

8

Cabling Sart

Cabling Start

Cabling Sart

Civi

l eng

inee

ring

(incl.

prot

ectio

n)

Mur

tym

pan

Shie

lddi

ng R

R 53

Shie

lddi

ng R

R 57

Safe

Roo

m (I

)Ca

ble

Tray

Pipi

ngO.

F. (

I))

Dive

rse

Wor

ks

Ethe

rnet

Mov

e ra

cks

Com

misi

onin

g of

0 0

VSC IV

VSC IV

VSC IV

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

EPC 60A

ELQA

Powering tests

UTA

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Electrical maintenance - No access

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

DFBX

Cabl

ing

Ca

m

Cabl

ing C

ampa

ign

AUG Tests AUG Tests

AUG Tests

AUG Tests

DSO Tests

REPAIR LEAKS IN QRL 4-5

AUG Tests

UPS

UPS

UPS

CRYO

CRYO

CRYO

CRYO

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBA

DFBX

DFBX

DFBX

DFBX

DFBX

DFBX

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

QRL service Modules

Electrical maintenance - No access

Electrical maintenance - No access

Voies Evacuation

Voies EvacuationVoies Evacuation

Voies EvacuationVoies Evacuation

Voies Evacuation

Voies EvacuationVoies Evacuation

Voies Evacuation

SF-

M

SF-

W

UW-M

SF-

M1

SF-W

UW-M

UW-

W

UW-M

UW-

W

UW-M

SF-

M

SF-

W

UW-

W

SF-

M

SF-M

UW-M

SF-M

UW-

SF-

M

UW-

SF-M

UW-

SF-

M

UW-

W

DFBA

MKI

Beam

Vac

uum

A7L1

A4L1

A6L1

A1L1

Beam

Vac

uum

A1R1

A4R1

A6R1

A7R1

Beam

Vac

uum

MKI

TDI

A6L2

A1L2A4L2

B1L2

A7L2

I5L2

A5L2

C4L2

Beam

Vac

uum

A1R2

A4R2

A5R2

A7R2

Beam

Vac

uum

A7L3

B5L3

A5L3

A4L3

IP3

A5R3

B5R3

A7R3

Beam

Vac

uum

A7L4E5L4D5L4B5L4D5R

4E5R4

IP4A6R

4

A7R4

Beam

Vac

uum

A7L5

A6L5B4L5

A1L5A5L5A4L2

Beam

Vac

uum

A1RA4RA5R

B4R5

A6RA7R

Beam

Vac

uum

E5L6

A5L6

A4L6

IP6

IP6

A4R6

C5R6

A5R6

Beam

Vac

uum

A7L7

A7R7

A67B57A57IP7A4RA5RB5RA6R

Beam

Vac

uum

A7L8

A6L8A5L8A1L8

A4L8

Beam

Vac

uum

A4RA1RI5RA6R

B4R8

C4R8

A5R8

MKI

A7R8

Christmas

Cabl

ing C

ampa

ign

Cabl

ing C

ampa

ign

Cabl

ing

Cam

paig

n

Cabl

ing C

ampa

ign

Cabl

ing

Cam

pai

gn

Cabl

ing C

ampa

ign

Test AUG (R2E)- No access

Safe

Roo

m (I

I)

Test Fire Detection (R2E) - No access

Test Fire Detection (R2E) - No access

Start Cabling

Test AUG (R2E) - No accessAUG TestsAUG Tests

Modification ODH (R2E) - No Access

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUART

ERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTE

RLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTE

RLY

Detection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLYDetection Incendie/GAZ_QUARTERLY

Detection Incendie/GAZ_QUARTERLY

AUG Tests

VSC IV

Electrical maintenance - No access

DFBX

Detection Incendie_ANNUAL

ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_A

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_ANNUAL

FLASH TEST ODH_ANNUAL

Detection Incendie_ANNUAL

ODH_ANNUALODH_A

FLASH TEST ODH_ANNUAL

OF_CONOF_CON

OF_CON

OF_CON

OF_CO

OF_REM

OF_REM

OF_REM

OF_REM

OF_REM

OF_REM

O_REMF

OF_REMO

O

OF_CONOF_CO

OF_REM

OF_REM

O

O

OO

O

O

DYPB

MPE EE

DYPB

MPE EP

DYPB

DYPB

MPE EP

MPE EE

DYPB

MPE EP

DYPB

MPE EP

DYPB

DYPB

MPE

EE

DYPB

DYPB

DYPB

DYPB

MPE

EE

DYPB + MPE EP

DYPB

DYPB

DYPB + MPE EP

MPE EP

MPE EP

MPE EP

MPE EP

DQR

DQR

DQR

DQR

DQR

DQR

DQR

DQR

DYPBDYPBDYPB

DYPBDYPB

DYPBDYPB

DYPB

DYPB

DYPB

DYPBDYPB

DYPB DYPB

DYPBDYPB

EE

EE

EE

EE

EPEP

EP

EP

EP

EPEP EP

DQR

DQR

DQR

DQR

DQR

DQR

Page 19: Integration of  MPE activities  in the global  LHC LS1  schedule

MPE Review, November 22-23, 2012 20

OUTSTANDING ITEMS

DYPB:- Cable replacement

DQRB - Thermostats replacement at pt 7, on 2 DQRB

M. Bernardini

Page 20: Integration of  MPE activities  in the global  LHC LS1  schedule

21

LHC Coordination

MPE Review, November 22-23, 2012M. Bernardini

Page 21: Integration of  MPE activities  in the global  LHC LS1  schedule

LHC Coordination

• Schedule in a very good shape

• Preparation in progress : Work Package Analysis– Scheduling, manage co-activities– Operating procedure, methods, risk analysis– Environment– Logistics: access, circulation, storage, transport, utilities, etc.

• MPE WORKPACKAGE ANALYSIS: DECEMBER, 13TH, 2012.

MPE Review, November 22-23, 2012 22M. Bernardini

Page 22: Integration of  MPE activities  in the global  LHC LS1  schedule

LHC coordination

MPE Review, November 22-23, 2012 23M. Bernardini

Safety • Documentation to be provided by Tech. Resp. to safety

coordinators– 1. PPSPS (plan particulier de sécurité et de protection de la santé)

Specific activities.

– 2a. PdP (Plan de Prevention) → Long term contract– 2b. Modus operandi / Task form

• Joint Inspection prior to the start (VIC)“ to check that the modus operandi and the environment is conform to what is described in the documentation”

Page 23: Integration of  MPE activities  in the global  LHC LS1  schedule

LHC Coordination

MPE Review, November 22-23, 2012 24M. Bernardini

Follow-up• Monday Morning meetings• On site visits and meetings• Weekly coordination meeting• Upgrade, modifications, methods and schedule

Page 24: Integration of  MPE activities  in the global  LHC LS1  schedule

MPE Review, November 22-23, 2012 25M. Bernardini

Conclusions

• The critical path of LS1 is related to the interconnection activities.

• Identify & COMMUNICATE deviations ASAP;

• Critical issue: resources impact on schedule and co-activities