Installation of Gantry

download Installation of Gantry

of 3

Transcript of Installation of Gantry

  • 7/29/2019 Installation of Gantry

    1/3

    f { ~ Proposed Fourth Lane Widening FromRO!F'U Shah Alam Interchange To Rawang SAFETY~ ~ . . ~ MANAGEMENT SYSTEM/lalan Duta Toll Plaza and Nila i ToSeremban Page 1 of 2PROPEL Hazard Identification, Risk Assessment andBERHAD Risk Control

    HIRARC FORM NUMBER: FLW/GEN/10/2012/03Company PROPEL-FLW Conducted by I /; AProcess/Location : Installation of Gantry for Major (Rtd) Mohd Salahuddin V I ~ackage A,B,C D,E Yaakob .Approved by

    MOHD SALAHUDDIN HJ YAAJ(lHassan Samian OBSAFETY OFfiCERPROPEL BHD

    Date :18 Sept 2012 Review Da te :1. Hazard Identification 2. Risk Analysis 3. Risk ControlNo Work Hazard Which can Existing Ris k Likely Severity Risk Recommende PI

    Activity cause/effect Control hood d Control cMeasures

    1. Site Vehicular Vehicular Safe work 2 3 6 TMP stage 1 toPreparation traffic traffic rammed practice from (Mediu be adhered.

    onto. traffic mgt m)plan. Sitepreparation tobe carried outduring lanecloser on daytime.

    2. Mobilization Slow Traffic To followMHA 2 2 4 (low) To adhere withof the moving conjunctio n. heavy existing rqmts.machineries machineries

    permit able

  • 7/29/2019 Installation of Gantry

    2/3

    : V a t ' & ~ Proposed Fourth Lane Widening FromYRr; Shah Alam Interchange To Rawang SAFETYi ~ Y ~ /lalan Duta Toll Plaza and Nilai To MANAGEMENT SYSTEMSeremban Page 2 of 2

    PROPEL Hazard Identif icat ion, Risk Assessment andBERHAD Risk Control

    1. Hazard Identification 2. Risk Analysis 3. Risk ControlNo Work Hazard Which can Existing Risk Likely Severity Risk Recommende PICActivity cause/effect Control hood d ControlMeasures

    period.3. Installation of To be Vehicular Machineries 2 3 6 Emergency

    machineries on parked on traffic rammed parking area (mediu lane and slowsite emergenc onto to be m) Jane to be

    y lane. protected with closed.Danger TMP.towardsvehiculartraffic.

    4. To hoist support -Vehicular -Vehicular Machineries 2 3 6column using Traffic traffic rammed parking area (mediumobile crane -material onto lobe m)and sky lift dropped protected with

    TMP andtemporary Jivelane closure.

    5. Hoisting main Mecha -Damage to To follow 2 3 6 -Machineriesspan nical properties adequate (mediu inspection

    hazard. -material method m) -Temporarydropped statement live lane

    closure

  • 7/29/2019 Installation of Gantry

    3/3

    ~ ~ - Proposed Fourth Lane Widening Froml?R@I!'W Shah Alam InterchangeTo Rawang SAFETY; ~ MANAGEMENT SYSTEM~ ' : ; : , : : : /lalan Duta Toll Plaza and Nilai ToSeremban Page 3 of 2PROPEL Hazard Identification, Risk Assessment andBERHAD Risk Control

    1.Hazard Identification 2. Risk Analysis 3. Risk ControlNo Work Hazard Which can Existing Risk Likely Severity Risk Recom mende d PIActivity cause/ef fect Control hood Control cMeasures6. Site clearing -Manual -Muscular pain - to minimize 1 4 4

    handling. -Traffic accident manual (low)-Truck I handling.transporter - EL closer toto be adhere withparked at TMP.EL