Installation of an FPSO and subseaInstallation of an FPSO and subsea hardware in the Mediterranean Sea using non-specialised vesselsnon specialised vesselsUTC - BERGEN June 2008June 2008

Ivar Tveitnes

© 2008 Aker Solutions

Aker Marine Contractors - What we do

SURF OperationsMooring & Floaters

Floatovers Removal

© 2008 Aker Marine Contractors part of AkerDate Slide 2

Work Areas - Assets

BOA DEEP C

BOA SUB C

TURNTABLE

© 2008 Aker Marine Contractors part of AkerDate Slide 3Date Slide 3

AGENDA■ Oudna Installation Preface■ Vessels■ Vessels■ Installation of Mooring System

I t ll ti f Fl ibl Ri /Fl li d■ Installation of Flexible Risers/Flowlines and UmbilicalsHook up to FPSO■ Hook-up to FPSO

■ Conclusion

© 2008 Aker Marine Contractors part of AkerDate Slide 4

OUDNA INSTALLATION - PREFACE

■ Tunisian water outside North Africa■ No offshore bases and limited support infra-structurepp■ Specialized installation vessels?

● Large mobilization costLi it d il bilit● Limited availability

■ Requirements● Anchor handling (large anchors, heavy chain and fibre ropes)● Anchor handling (large anchors, heavy chain and fibre ropes)● Chafe chain and heavy riser guides● Flexible risers/flowlines and umbilicals

© 2008 Aker Marine Contractors part of AkerDate Slide 5

Oudna location

IKDAM FPSOIKDAM FPSO

Chafe chain with riser guidesNODE

400 m 239mm polyester rope

800 m 135mm 6.6d chain

Stevpris mk5 29 t

6” Prod; 950m6 Prod; 950m

4” Power Fluid 1539m

95mm Umb; 950 m

4” W I ; 1038 m

78mm Umb; 1550 m

Water Injection Well

© 2008 Aker Marine Contractors part of AkerDate Slide 6Date Slide 6

Production Wellj

INSTALLATION VESSEL

MAERSK ’A’ CLASS VESSEL

”Maersk Attender”

Main dimensions = 90.3 x 20.3 m

Free deck = 41.6 x 19.5 m

Winches = 625t(AH)/2 x 400t(tow)

Bollard Pull = 257t (23480 hp)

DP2

70 beds

© 2008 Aker Marine Contractors part of AkerDate Slide 7

ASSISTING VESSEL

ANCHOR HANDLING VESSEL

”Odin Viking”

(Viking Supply Ships AS)

Main dimensions = 73.9 x 16.9 m

Winches = 400t (AH)

Bollard Pull = 180t

DP2

26 beds

© 2008 Aker Marine Contractors part of AkerDate Slide 8

DECK LAYOUT

FOR MOORING INSTALLATIONA-FRAME AND 2 X WROV IN ALL PHASESPHASES

CHAIN IN LOCKERS

© 2008 Aker Marine Contractors part of AkerDate Slide 9

INSTALLATION OF MOORING SYSTEM

© 2008 Aker Marine Contractors part of AkerDate Slide 10

INSTALLATION OF ”CHAFE CHAIN”

Chafe Chain installation frame, 320Te design loaddesign load

10 off Guide Frames

© 2008 Aker Marine Contractors part of AkerDate Slide 11

MOBILISATION FOR FLEXIBLES INSTALLATION

4” PF & 6” Prod (on 26’ reel)

Deck quadrant

Prod & WI umb

4” WI (on 26’ reel)

Hub drive on rails

2xTensioner’sChute

Working platform

Buoyancy elements

© 2008 Aker Marine Contractors part of AkerDate Slide 12Date Slide 12

MOBILISATION FOR FLEXIBLES INSTALLATION

Stern chute installation”Dance floor” assembly around deck quadrant

Setting up Aquatic tensioners and hub-drive systems

R d th l k bili ti iSeafastening of reels Umbilical reel drive

Round the clock mobilisation in Freeport, Valletta, Malta

© 2008 Aker Marine Contractors part of AkerDate Slide 13Date Slide 13

INSTALLATION OF FLEXIBLE RISERS/FLOWLINESCleaning of well-head hub

1. Preparations

L di f V ti lDeployment of Vertical Connection tool

2 D l t f 1 t d

Landing of Vertical Connection tool

2. Deployment of 1st end (subsea end) and tie-in to x-mas tree

© 2008 Aker Marine Contractors part of AkerDate Slide 14

INSTALLATION OF FLEXIBLE RISERS/FLOWLINES

Buoyancy section, including temporary buoyancy

3. Buoyancy section

Installation of Buoyancy elements

buoyancy

4” PF Installation 4” PF around deck-quadrant

4. Paying out productp

© 2008 Aker Marine Contractors part of AkerDate Slide 15

INSTALLATION OF FLEXIBLE RISERS/FLOWLINES

5. Overboarding of topside end

Press retestPressuretest ongoing before overboarding

6. Transfer to- and hang-off i Ch f Ch i h ld bin Chafe Chain held by Assisting vessel

© 2008 Aker Marine Contractors part of AkerDate Slide 16

INSTALLATION OF UMBILICALS

• Reverse lay direction as opposed to riser/flowlines

• Light weight in water required chain weights to temporarily weigh down during installation of buoyancy sectioninstallation of buoyancy section

• Umbilical tie-in done by Flying Lead. WROV – Male-MQC plate connected to F l MQC tFemale-MQC on x-mas tree

© 2008 Aker Marine Contractors part of AkerDate Slide 17

HOOK-UP OF MOORING AND FLEXIBLES TO FPSO

1. Chafe Chain transferred from Assisting Vessel to FPSO ’Ikdam’

2. Flexibles transferred one by one from Assisting Vessel to FPSO ’Ikdam’

All Risers through Guide Frames

All Risers through Guide Frame 10

3 Testing / comissioning of3. Testing / comissioning of flexible flowlines / risers and umbilicals

© 2008 Aker Marine Contractors part of AkerDate Slide 18Date Slide 18

CONCLUSION

■ Complex marine operations may be performed using standard large AHTS based on innovative engineering and planninglarge AHTS, based on innovative engineering and planning

■ Effective use of available vessels – Installation of Mooring system and Flexibles using same vessel

■ Solution oriented and dedicated project team consisting of own personnel and subcontractors

f■ The project planning and execution of the operations involved several challenges…

■ But; ”WE DID IT!”■ …But; WE DID IT!

© 2008 Aker Marine Contractors part of AkerDate Slide 19

Copyright

Copyright of all published material including photographs, drawings and images in this document remains vested in Aker Solutions and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements No trademark copyright or other notice shall be altered orpermission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction.

© 2008 Aker Marine Contractors part of AkerDate Slide 20

Disclaimer

This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Akerthe economic conditions of the regions and industries that are major markets for Aker Solutions ASA and Aker Solutions ASA’s (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as “expects”, “believes”, “estimates” or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries p , g , g g pthat are or will be major markets for Aker Solutions’ businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Aker Solutions ASA believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no

th t th t ti ill b hi d th t th t l lt ill b t t i thassurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Aker Solutions ASA is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Aker Solutions ASA nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use.Ak S l ti i t f l ll i d d t titi tit ti th i t id titi AkAker Solutions consists of many legally independent entities, constituting their own separate identities. Aker Solutions is used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use “Aker Solutions”, “we” or “us” when we refer to Aker Solutions companies in general or where no useful purpose is served by identifying any particular Aker Solutions company.

© 2008 Aker Marine Contractors part of AkerDate Slide 21

Thank you for your attention!Thank you for your attention!

Questions?

© 2008 Aker Marine Contractors part of AkerDate Slide 22

THANK YOU – QUESTIONS?Thank you for your attention!