Installation - Bradley Corp · P.O. Box 309, Menomonee Falls, ... Pre-Installation Information...
Transcript of Installation - Bradley Corp · P.O. Box 309, Menomonee Falls, ... Pre-Installation Information...
P.O. Box 309, Menomonee Falls, WI USA 53052-0309PHONE 800.BRADLEY (800.272.3539) FAX 262.251 5817bradleycorp.com
Installation
215-158E Rev. K; ECN 12-05-003C© 2012 BradleyPage 1 of 5 10/18/2012
E19-220Wall-Mounted Eyewash with Plastic Bowl
E19-220BWall-Mounted Eyewash with Stainless Steel Bowl
E19-220DCWall-Mounted Eyewash with Dust Cover
E19-220FWWall-Mounted Eye/Face Wash with Plastic Bowl
Table of ContentsPre-Installation Information . . . . . . . . . . . . . . . . . . . . . . . 2Installation Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . 3Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3–4Components and Parts Lists . . . . . . . . . . . . . . . . . . . . 5–8
E19-220
E19-220B
E19-220DC
E19-220FW
2
S19-210P Installation
10/18/2012 Bradley • 215-158E Rev. K; ECN 12-05-003C
IMPORTANT
Read this installation manual completely to ensure proper installation, then file it with the owner or maintenance department. Compliance and conformity to drain requirements and other local codes and ordinances is the responsibility of the installer.
Separate parts from packaging and make sure all parts are accounted for before discarding any packaging material. If any parts are missing, do not begin installation until you obtain the missing parts.
Flush the water supply lines before beginning installation and after installation is complete. Test the unit for leaks and adequate water flow. Main water supply to the eye/face wash should be “ON” at all times. Provisions shall be made to prevent unauthorized shutoff.
The ANSI Z358.1 standard requires an uninterrupted supply of flushing fluid. Bradley plumbed emergency fixtures require a minimum of 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly to verify proper operation. This equipment should be inspected annually to ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358.1.
For questions regarding the operation or installation of this product, visit www.bradleycorp.com or call 1-800-BRADLEY.
Product warranties and service parts information may also be found under ”Products” on our web site at www.bradleycorp.com.
Installation
THIS
SIDE
UP
Packing List
••••
P.O. B
ox 3
09, M
enom
onee F
alls
, WI 5
3051
R
TEST THIS U
NIT E
ACH WEEK
Test
-oper
ate
valv
e(s)
eac
h wee
k an
d sig
n bel
ow.
Report
any
mal
funct
ions
imm
edia
tely.
Ventil
(e) w
öchen
tlich
im Te
stbet
rieb p
rüfe
n, bes
tätig
t
durch U
nters
chrif
t. Je
gliche
Störu
ng sofo
rt m
elden
.
Date
Datum
Date
Signed
Unters
chrif
t
Signe
Date
DateDat
e
Signed
Signed
Signed
DIESES G
ERÄT 1ST W
ÖCHENTLICH Z
U PRÜFEN.
ESSAI HEBDOM
ADAIRE
Test
le fo
nctio
nnemen
t des
valv
es c
haque
sem
aine
et
signe
en b
as. S
'il y
à quel
que ch
ose q
ui ne
va p
as fa
it
un rapport
imm
édia
tem
ent.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
3
Installation S19-210P
Bradley • 215-158E Rev. K; ECN 12-05-003C 10/18/2012
Installation
NOTICE! Avoid cleaners containing organic solvents, alcohols, and hydrocarbons. Rinse with water after cleaning.
Supplies Required:• (3) 8m wall fasteners and bolts
• Pipe sealant
• Piping to ½" BSP water supply inlet on unit
• Piping to 1¼"–11 BSP drain outlet for eyewash
• Sign-mounting hardware
Step 1: Secure base to floor The top of the eyewash heads should be
1067mm (42”) from the floor.
1. Position the inlet drain fitting over the 1¼” drain outlet pipe from wall.
2. Using the inlet drain fitting as template, mark bolt hole locations on the wall OR install three suitable fasteners (supplied by installer) for 8m bolts in the wall at marked hole locations (see illustrations on pages 3–4).
3. Bolt the inlet drain fitting to the wall or wall fasteners using 8m bolts (supplied by installer).
4. After the inlet drain is secured, assemble the flag handle, washer and nut.
Step 3: Connect water supply1. Connect the water supply piping (supplied by
installer) to the ½" BSP inlet on the eyewash.
2. Connect the drain piping (supplied by installer) to the 1¼–11 BSP drain outlet on the eyewash.
3. Mount the safety sign to the wall using sign-mounting hardware (supplied by installer).
4. Open the water supply lines. Test for leaks and adequate water flow.
394mm (15-1/2")
184mm(7-1/4")
57mm(2-1/4")
133mm(5-1/4")
Ø 8mm(5/16")
337mm(13-1/4")
Ø 254mm (10")
102mm(4")
210mm(8-1/4")
119mm(4-5/8")
1067mm (42")Suggested
HeightTo Floor
927mm(36-1/2")
SuggestedHeight
To Floor
Wall
E19-220
E19-220B
403mm (15-7/8")
187mm(7-3/8")
102mm(4")
346mm(13-5/8")
Ø 273mm (10-3/4")
927mm(36-1/2")
SuggestedHeight
To Floor
Wall
57mm(2-1/4")
133mm(5-1/4")
Ø 8mm(5/16")
119mm(4-5/8")
1067mm(42")
SuggestedHeight
To Floor
210mm(8-1/4")
4
S19-210P Installation
10/18/2012 Bradley • 215-158E Rev. K; ECN 12-05-003C
Ø 273mm (10-3/4")
184mm(7-1/4")
425mm(16-3/4")
222mm(8-3/4")
133mm(5-1/4")
346mm(13-5/8")
102mm(4")
Wall
508mm (20")
210mm(8-1/4")
119mm(4-5/8")
1067mm(42")
SuggestedHeight
To Floor57mm(2-1/4")
Ø 8mm(5/16")
927mm(36-1/2")
SuggestedHeight
To Floor
902mm(35-1/2")
SuggestedHeight
To Floor
394mm (15-1/2")
206mm(8-1/8")
57mm(2-1/4")
133mm(5-1/4")
102mm(4")
Ø 8mm(5/16")
210mm(8-1/4")
119mm(4-5/8")
Ø 254mm (10")
337mm(13-1/4")
1067mm(42")
SuggestedHeight
To Floor
Wall
E19-220DC E19-220FW
5
Installation S19-210P
Bradley • 215-158E Rev. K; ECN 12-05-003C 10/18/2012
Parts List
Assembly of Components - E19-220 (with Plastic Bowl)
Prepack S45-1785 includes Items 1.2, 1.4, 1.5, 1.6
Prepack S45-123 includes Items 2, 1.12, 1.111
Items 1.1-1.12 come preassembled as Item 1.
Item Part No. Qty. Description
1 S39-243 1 Europe Eyewash Assembly
1.1 111-061BSP 1 Inlet Drain Fitting
1.2 124-028 1 Gasket
1.3 154-058 1 Plastic Eyewash Bowl
1.4 173-025 1 Cup Strainer
1.5 S21-071 1 Supply Stem
1.6 113-1185 1 Spacer, Drain
1.7 S05-091 1 Eyewash Yoke Assembly
1.8 107-371 2 Dust Cover
Item Part No. Qty. Description
1.9 13-006LQ 1 Pipe ½” NPT x 89mm
1.10 169-025 1 Elbow
1.11 S27-282B 1 1/2” Ball Valve with nut
1.111 110-215 1 Nut only
1.12 142-002DA 1 Lockwasher
2 128-135 1 Plastic Handle
3 114-051E 1 Safety Sign
4 204-421 1 Emergency Tag
1.6
1.5Flow Control
This End
1.4
1.3
1.2
1.1
1-1/4" - 11 BSPDrain Outlet
1.8
1.71
1/2" BSP SupplyInlet (BSP threads
are noted withblack line on
threads)
1.9
1.101.11
1.111
2
1.12
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden.
DateDatumDate
SignedUnterschriftSigne
DateDate
Date SignedSignedSigned
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
3
4
6
S19-210P Installation
10/18/2012 Bradley • 215-158E Rev. K; ECN 12-05-003C
Parts List
Assembly of Components - E19-220B (with Stainless Steel Bowl)
Prepack S45-1782 includes Items 1.2, 1.4, 1.5, 1.6
Prepack S45-123 includes Items 2, 1.12, 1.1119
Items 1.1-1.12 come preassembled as Item 1.
Item Part No. Qty. Description
1 S39-246 1 Europe Eyewash Assembly
1.1 111-061BSP 1 Inlet Drain Fitting
1.2 124-028 1 Gasket
1.3 187-053 1 Stainless Steel Eyewash Bowl
1.4 173-009 1 Cup Strainer
1.5 S21-071 1 Supply Stem
1.6 113-1159 1 Spacer, Drain
1.7 S05-091 1 Eyewash Yoke Assembly
1.8 107-371 2 Dust Cover
Item Part No. Qty. Description
1.9 13-006LQ 1 Pipe 1/2” NPT x 89mm
1.10 169-025 1 Elbow
1.11 S27-282B 1 1/2” Ball Valve with nut
1.111 110-215 1 Nut only
1.12 142-002DA 1 Lockwasher
2 128-135 1 Plastic Handle
3 114-051E 1 Safety Sign
4 204-421 1 Emergency Tag
1.6
1.5Flow Control
This End
1.4
1.3
1.2
1.1
1-1/4" - 11 BSPDrain Outlet
1.8
1.71
1/2" BSP SupplyInlet (BSP threads
are noted withblack line on
threads)
1.9
1.101.11
1.111
2
1.12
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden.
DateDatumDate
SignedUnterschriftSigne
DateDate
Date SignedSignedSigned
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
3
4
7
Installation S19-210P
Bradley • 215-158E Rev. K; ECN 12-05-003C 10/18/2012
Parts List
Assembly of Components - E19-220DC (with Dust Cover)
Prepack S45-1782 includes Items 1.2, 1.4, 1.5, 1.6
Ball Valve Kit S30-072 includes Items 1.12, 1.13, 1.14, 1.121, 2
Prepack S30-087 includes Items 1.13, 1.14, 1.121, 2
Items 1.1-1.14 come preassembled as Item 1.
Item Part No. Qty. Description
1 S39-312 1 Europe Dust Cover/Eyewash Assy
1.1 111-061BSP 1 Inlet Drain Fitting
1.2 124-028 1 Gasket
1.3 S90-009 1 Dust Cover Assembly
1.4 173-009 1 Cup Strainer
1.5 S21-071 1 Supply Stem
1.6 113-1159 1 Spacer, Drain
1.7 S05-091 1 Eyewash Yoke Assembly
1.8 269-447 1 Bumper
Item Part No. Qty. Description
1.9 161-025 1 Hex Nut
1.10 113-006LQ 1 Pipe 1/2” NPT x 89mm
1.11 169-025 1 Elbow
1.12 S27-282B 1 1/2” Ball Valve with nut
1.121 110-215 1 Nut only
1.13 153-372R 1 Ball Valve Adapter
1.14 142-002DA 1 Lockwasher
2 S08-056 1 Handle Assembly
3 114-051E 1 Safety Sign
4 204-421 1 Emergency Tag
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden.
DateDatumDate
SignedUnterschriftSigne
DateDate
Date SignedSignedSigned
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
1.9
1.5
Flow ControlThis End
1.4
1.3
1.2
1.1
1.10 1.12
6
1.14
17
1.11
1.8
HANDLE NOTE: Close the cover andput the pin through
the clip to keep closed.
1.6
1.7
1-1/4" - 11 BSPDrain Outlet
1/2" BSP SupplyInlet (BSP threads
are noted withblack line on
threads)
1.121
1.13
2
8
S19-210P Installation
10/18/2012 Bradley • 215-158E Rev. K; ECN 12-05-003C
Parts List
Assembly of Components - E19-220FW (with Eye/Face Wash)
Prepack S45-123 includes Items 2, 1.12, 1.111
Items 1.1-1.12 come preassembled as Item 1.
Item Part No. Qty. Description
1 S39-421 1 Europe Eye/Face Wash Assembly
1.1 111-061BSP
1 Inlet Drain Fitting
1.2 124-028 1 Gasket
1.3 154-058 1 Plastic Eyewash Bowl
1.4 173-025 1 Cup Strainer
1.5 113-1150 1 Supply Stem
1.6 S05-091P 1 Eyewash Yoke Assembly
1.7 S45-2453 1 Service Kit EFW - Black Sprayheads
Item Part No. Qty. Description
1.8 S53-063 2 Dust Cover
1.9 113-006LQ 1 Pipe 1/2” NPT x 89mm
1.10 169-025 1 Elbow
1.11 S27-282B 1 1/2” Ball Valve with nut
1.111 110-215 1 Nut only
1.12 142-002DA 1 Lockwasher
2 128-135 1 Plastic Handle
3 114-051E 1 Safety Sign
4 204-421 1 Emergency Tag
2
1.12
P.O. Box 309, Menomonee Falls, WI 53051
R
TEST THIS UNIT EACH WEEK
Test-operate valve(s) each week and sign below.Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt durch Unterschrift. Jegliche Störung sofort melden.
DateDatumDate
SignedUnterschriftSigne
DateDate
Date SignedSignedSigned
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.ESSAI HEBDOMADAIRE
Test le fonctionnement des valves chaque semaine et signe en bas. S'il y à quelque chose qui ne va pas fait un rapport immédiatement.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USATEL: 1-800-BRADLEY FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
3
4
1.6
1.5
1.4
1.3
1.2
1.1
1-1/4" - 11 BSPDrain Outlet
1.8
1.71
1/2" BSP SupplyInlet (BSP threads
are noted withblack line on
threads)
1.9
1.101.11
1.111