Electrical Installations
Design, Selection, Erection
and Inspection
IECEx International Conference 2017
Shanghai, China
![Page 2: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/2.jpg)
IECEx International Conference 2017
Peter Thurnherr
Shanghai thuba Electric Co. Ltd., Shanghai (China)
thuba Ltd., Switzerland
Convenor MT 60079-14
Chairman IECEx ExPCC
![Page 3: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/3.jpg)
![Page 4: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/4.jpg)
Standards
IEC 60079-14 IEC 60079-17 IEC 60079-19
![Page 5: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/5.jpg)
![Page 6: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/6.jpg)
![Page 7: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/7.jpg)
![Page 8: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/8.jpg)
4. General requirements
![Page 9: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/9.jpg)
4.2 Documentation – Site
▪ Area classification document
(see IEC 60079-10-1 and IEC 60079-10-2)
▪ Where applicable, gas, or vapour or dust
classification in relation to the group or subgroup
of the electrical equipment
▪ Temperature class or ignition temperature of the
gas or vapour involved
▪ Where applicable, the material characteristics
▪ External influences
▪ Ambient temperature
![Page 10: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/10.jpg)
![Page 11: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/11.jpg)
▪ Manufacturer’s instruction manual
▪ Certificate of Conformity according to the
standards
▪ Information with «Specific conditions for use”, if
the certificate number has the suffix “X”
▪ Descriptive system document for the intrinsically
safe system
4.2 Documentation – Equipment
![Page 12: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/12.jpg)
The following documents are
available for the identification:
4.2 Documentation – Equipment
– Marking(according IEC 60079-0)
– IECEx Certificate of Conformity(Online system!)
– Instruction manual(according IEC 60079-0)
![Page 13: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/13.jpg)
The following documents are
available for the identification:
4.2 Documentation – Equipment
– Marking(according IEC 60079-0)
– Chinese Certificate of Conformity
– Instruction manual(according IEC 60079-0)
![Page 14: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/14.jpg)
▪ Necessary information to ensure correct
installation of the equipment
▪ Documentation relating to the suitability of the
equipment
▪ The plans showing details of wiring systems
▪ Records of selection criteria for cable entry
systems
▪ Drawings and schedules relating to circuit
identification
▪ Records of the initial inspection
4.2 Documentation – Installation
![Page 15: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/15.jpg)
![Page 16: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/16.jpg)
▪ Evidence of
personnel competency
4.2 Documentation – Personnel
![Page 17: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/17.jpg)
On completion of the erection, initial inspection of
the equipment and installation shall be carried out in
accordance with IEC 60079-14.
4.3 Initial inspection
![Page 18: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/18.jpg)
![Page 19: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/19.jpg)
Equipment with certificate according to the
IEC 60079 series meets the requirements for
hazardous areas, when selected and installed in
accordance with this standard.
4.4 Assurance of conformity of
equipment
![Page 20: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/20.jpg)
![Page 21: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/21.jpg)
![Page 22: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/22.jpg)
4.4 Assurance of conformity of
equipment
![Page 23: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/23.jpg)
▪ General understanding of relevant electrical
engineering
▪ Practical understanding of explosion protection
principles and techniques
▪ Understanding of and ability to read and assess
engineering drawings
▪ Working knowledge and understanding of relevant
Standards in explosion protection
▪ Basic knowledge of quality assurance, including the
principles of auditing, documentation, traceability
of measurement, and instrument calibration
4.5 Qualifications of personnel
(Annex A)
![Page 24: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/24.jpg)
5. Selection of equipment
![Page 25: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/25.jpg)
5.3 Relationship between equipment
protection level (EPLs) and zones
0
Equipment protection level (EPL)Zones
2
1
Gc, Gb and Ga
Gb and Ga
Ga
![Page 26: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/26.jpg)
5.4.2 Relation between EPLs and
types of protection
Type of Protection
Gb
Flameproof enclosures
Increased safety
Intrinsically safe
Encapsulation
EPL
IEC 60079-7
IEC 60079-1
Standard
mb
ib
eb, e
Code
db, d
IEC 60079-18
IEC 60079-11
Oil immersion ob, o IEC 60079-6
![Page 27: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/27.jpg)
5.5 Selection according to
equipment grouping
IIA
IIB
IIC
II, IIB or IIC
II, IIA, IIB or IIC
II or IIC
Requested
Group
Permissible
Group
![Page 28: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/28.jpg)
5.6.2 Temperature class
T1
Ignition
temperature of gas
or vapor
Temperature class
required by the
area classification
Allowable
temperature
classes of
equipment
> 200°C
> 300°C
> 450°C
T6
T5
T4
T3
T2
> 135°C
T3 – T6
T2 - T6
T1 - T6
T5 – T6> 100°C
T4 – T6
> 85°C T6
![Page 29: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/29.jpg)
5.9 Selection to cover external
influences
▪ Thermal effects
▪ Chemical effects
▪ Mechanical effects
▪ Effects of movement and vibration
▪ Electrical effects
▪ Moisture
▪ Ingress of process liquids
▪ Corrosion
![Page 30: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/30.jpg)
![Page 31: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/31.jpg)
5.9 Selection to cover external
influences
![Page 32: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/32.jpg)
Equipment shall normally be designed
for use in an ambient temperature range between –
20 ºC and 40 ºC;
in this case, no additional ambient temperature
marking is required.
Example of extended ambient temperature range
Tamb
–20 ºC ≤ Tamb ≤ 60 ºC.
5.9 Ambient temperature
![Page 33: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/33.jpg)
![Page 34: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/34.jpg)
6. Protection from dangerous
sparking
![Page 35: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/35.jpg)
The minimum size for bonding conductors for
the main connection to a protective rail shall be
at least 6 mm² (based on conductivity of copper) in
accordance to IEC 60364-5-54 and supplementary
connections shall be a minimum of 4 mm².
Consideration should also be given to using larger
conductors for mechanical strength.
Connections shall be secure against self loosening
and shall minimize the risk of corrosion which may
reduce the effectiveness of connection.
6.4 Potential equalization
![Page 36: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/36.jpg)
![Page 37: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/37.jpg)
![Page 38: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/38.jpg)
Excerpt FDIS 60079-0 Edition 7
![Page 39: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/39.jpg)
![Page 40: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/40.jpg)
![Page 41: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/41.jpg)
![Page 42: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/42.jpg)
![Page 43: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/43.jpg)
![Page 44: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/44.jpg)
![Page 45: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/45.jpg)
![Page 46: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/46.jpg)
Limitation of the size of chargeable non-conductive
surfaces
6.5 Static electricity
EPL
Surface [mm2]
IIA
Ga
Gb
Gc
5000
IIB IIC
10000
10000
2500
10000
10000
400
2000
2000
![Page 47: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/47.jpg)
![Page 48: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/48.jpg)
6.5 Static electricity
![Page 49: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/49.jpg)
9. Wiring systems
![Page 50: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/50.jpg)
Cables shall be:
▪ Sheathed with thermoplastic, thermosetting, or
elastomeric material.
They shall be circular and compact.
Any bedding or sheath shall be extruded.
Fillers, if any, shall be non hygroscopic.
▪ Mineral insulated metal sheathed, or
▪ Special, e.g. flat cables with appropriate cable
glands.
9.3.2 Cables for fixed installations
![Page 51: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/51.jpg)
9.3.2 Cable for fixed installations
![Page 52: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/52.jpg)
9.3.2 Cable for fixed installations
![Page 53: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/53.jpg)
9.3.2 Cable for fixed installations
![Page 54: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/54.jpg)
9.3.2 Cables for fixed installations
![Page 55: Installation and Inspection - Shanghai · 2020. 11. 18. · On completion of the erection, initial inspection of the equipment and installation shall be carried out in accordance](https://reader035.fdocuments.us/reader035/viewer/2022071419/61184de055f8bb2d0c056b60/html5/thumbnails/55.jpg)