[Insert Project Name]

14
Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC) [Insert Project Name] Post Implementation Review (PIR) [Insert Date of PIR] [Insert Clarity ID] 1

description

[Insert Project Name]. Post Implementation Review (PIR) [Insert Date of PIR] [Insert Clarity ID]. Template Instructions. - PowerPoint PPT Presentation

Transcript of [Insert Project Name]

Page 1: [Insert Project Name]

Centers for Medicare & Medicaid ServiceseXpedited Life Cycle (XLC)

[Insert Project Name][Insert Project Name]

Post Implementation Review (PIR)[Insert Date of PIR]

[Insert Clarity ID]

1

Page 2: [Insert Project Name]

Template InstructionsTemplate Instructions

This document is a template for the Post Implementation Review (PIR). The purpose of the PIR is to ascertain the degree of success from the project, to examine if further improvements can be made to optimize the benefits delivered, and to learn lessons

from the project that can be used to improve future project work and solutions.

Sections should not be removed from the presentation. If a section is not applicable, please indicate as such and provide an explanation.

Additional slides may be added to convey information that you feel is important to share that is not addressed by this template.

Please ensure that your presentation is Section 508 compliant by following the URL:

http://www.hhs.gov/web/policies/checklistppt.html

DELETE THIS SLIDE BEFORE FINALIZING YOUR PRESENTATION

2

Page 3: [Insert Project Name]

Template Revision HistoryTemplate Revision History

DELETE THIS SLIDE BEFORE FINALIZING

YOUR PRESENTATION

Version Date Author Description of Changes

1.0 04/2010 K. Maenner, OIS/DITPPA Baseline Version

2.0 04/2012 C. Shaunessy, OIS/DITG Reformatted for XLC

2.1 04/2014 C. Shaunessy, OIS/DITGReplaced CMS logo; deleted slide background graphic.

2.2 08/2014 C. Shaunessy, OIS/DITG

Added/updated Performance Measures slide per CR 14-010. Added Clarity ID to title slide.

2.3 02/2015 S. Potu, OEI/DPPIG Updated CMS logo.

3

Page 4: [Insert Project Name]

PresentersPresenters

Presenter’s Name Role

4

See this slide’s notes pages for slide instructions.

Page 5: [Insert Project Name]

Review PurposeReview Purpose

1. Review [Insert Project Name] Performance with the TRB to assess how well the project met its goals; and

2. Provide output to determine whether to:

• Continue current operations or• Change current operations or• Terminate current operations

5

Page 6: [Insert Project Name]

XLC ContextXLC Context

Post Implementation Review (PIR) is a project-level review after a period of sustained operation in the Operations & Maintenance Phase.

Required artifacts: Baselined Post Implementation Report.

6

Page 7: [Insert Project Name]

OverviewOverview

[Provide a brief overview of the application and software architectures providing a high-level context diagram. Briefly introduce the business process the system supports and how it fits within the larger context of CMS’ business identifying interfaces for both internal and external business processes. See Section 2 of the Post Implementation Report.]

7

Page 8: [Insert Project Name]

Stakeholder Information and Assessment Method

Stakeholder Information and Assessment Method

[Briefly describe the investment's users and the process (e.g., surveys, user group meetings, customer focus groups, etc.) used to assess user or customer satisfaction. See Section 3 of the Post Implementation Report.]

8

Page 9: [Insert Project Name]

Assessment ResultsAssessment Results

[Summarize the results of surveys or other user or customer inputs, and usage trends. Is the existing system providing customers the needed functionality and performance? Based on your user or customer inputs, is actual performance consistent with user or customer expectations, or do the current performance goals reflect current user or customer functional or performance requirements? See Section 3 of the Post Implementation Report.]

9

Page 10: [Insert Project Name]

Performance Measurement AreaMission and Business Results

Performance Measurement AreaMission and Business Results

Measurement Category

Measurement Group

Measurement Indicator

TargetSurveillance

Method

(See Notes) (See Notes) (See Notes) (See Notes) (See Notes)

Page 11: [Insert Project Name]

11

Measurement Category

Measurement Group

Measurement Indicator

TargetSurveillance

Method

(See Notes) (See Notes) (See Notes) (See Notes) (See Notes)

Performance Measurement AreaCustomer Results

Performance Measurement AreaCustomer Results

Page 12: [Insert Project Name]

Performance Measurement AreaProcess and Activities

Performance Measurement AreaProcess and Activities

Measurement Category

Measurement Group

Measurement Indicator

TargetSurveillance

Method

(See Notes) (See Notes) (See Notes) (See Notes) (See Notes)

Page 13: [Insert Project Name]

RecommendationsRecommendations

[Justify if the existing system should continue in operation as is, be enhanced, or terminated. If the system is to be enhanced or terminated, summarize the actions to be taken this fiscal year. See Section 5 of the Post Implementation Report.]

13

Page 14: [Insert Project Name]

Centers for Medicare & Medicaid ServiceseXpedited Life Cycle (XLC)

Conclusion of Post Implementation Review (PIR)for [insert project name]

Conclusion of Post Implementation Review (PIR)for [insert project name]

14