Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised...

18
ICAO NAT PBCS Workshop/2 Paris – June 17-19 th , 2015 Presented by Andrew Ives Inmarsat Update AVIATION > ICAO NAT PBCS/2

Transcript of Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised...

Page 1: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

ICAO NAT PBCS Workshop/2 Paris – June 17-19th, 2015 Presented by Andrew Ives

Inmarsat Update

AV

IAT

ION

> IC

AO

NAT P

BCS/2

Page 2: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

Alphasat update

AV

IAT

ION

> IC

AO

NAT P

BCS/2

01

Page 3: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

• Alphasat, also known as Inmarsat-4A F4, was launched on the 25th July 2013

• Alphasat provides performance improvements in terms of power, capacity and available spectrum in the I4-EMEA region

Alphasat Update Background

• Inmarsat successfully transitioned the EMEA (I4F2) Classic Aero and SwiftBroadband services to Alphasat on 24th March 2015 (replacing I4F2 at the same orbital slot)

3 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 4: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

Paumalu (Classic & SBB)

Fucino (Classic & SBB)

Beijing (SBB)

Burum (SBB)

4 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Classic Aero & SwiftBroadband I-4 Coverage Map with Alphasat

Page 5: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

SB Safety Initial FANS Performance

AV

IAT

ION

> IC

AO

NAT P

BCS/2

02

Page 6: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

˃ New development that entered flight trials in 2014, that

• Will satisfy the demand for greater cockpit bandwidth

• Be backward compatible with Classic Aero

˃ Provides cockpit communications

• 2 Channels of Cockpit Voice

• ACARS Data, supporting FANS 1/A

− Reduced ACARS message delivery times

• Prioritised IP data supporting new applications:

− Electronic Flight Bag

− New Operational IP-based applications

− Flight Data Recorder data download

˃ Enhanced aircraft position reporting and tracking

• Built-in: i.e. additional to ADS-C & waypoint reporting

• Position reporting rate is highly configurable

SwiftBroadband (SB) Safety

In-built aircraft position reporting and flight tracking

Low cost + lightweight terminals

6 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 7: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

High Availability Safety Comms - Meeting ICAO GOLD RCP240 and RSP180

ACARS & FANS1/A over SwiftBroadband Architecture

I4 Satellite

Constellation

Antenna

SBB

Modem

ACARS

Airborne

Gateway

(AAGW)

SB Safety

AES

ACARS

Ground

Gateway

(AGGW)

Aero

GESClassic

Aero

Modem

Fallback to

Classic

Aero

SB Safety Service

over

SwiftBroadband

Inm

ars

at

DC

N a

nd

DP

, S

P N

etw

ork

s

DP

1D

P n

Airline

AOC

Centres

Air Traffic

Service

Providers

Normal

Operation

over SBB

Classic Aero I-4

Ground Segment

VoIP

Server

Voice +

ACARS

VoIP

ServerPrioritisedIP

ACARS+

Position Reports

PS

Voice

Voice

Prioritised

IP

ACARS

ACARS

CN

2 Channels of

Cockpit Voice

FANS and AOC

Applications over

ACARS

Prioritised IP

Applications

(e.g. EFB)

Voice

....

SGSN

GGSN

MSC

Air Traffic

Service

Providers

Airline

AOC

Centres

Standard IP

Applications

(e.g. EFB, Cabin)

Ground

to Air

Voice

Air to Ground Voice

BGAN

Ground

SegmentPSTN

StandardIP

RAN

Standard

IP

Classic Aero Service

as Fallback

7 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 8: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

SwiftBroadband Safety Status ˃ All system infrastructure modifications in place and tested

˃ ARINC 781, RTCA MASPS and RTCA MOPS standards have been developed, ICAO Manual close to finalisation

˃ First STC has been completed on Hawaiian Airlines B767

˃ Successful first FANS flights of SB Safety for passenger operations

• In the initial phase of an in-service evaluation during 2015 on 8 HAL B767 aircraft

• Reduced aircraft separations being applied from the start of the trial

• Signing with second airline for 3 MD11 aircraft to join FANS evaluation

˃ FANS operational evaluation approval expected by the FAA PARC CWG in Q1 2016

8 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 9: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

˃ The FANS Over SwiftBroadband Safety (FOSS) project initiated at FAA PARC CWG will monitor SB Safety service performance against the ICAO GOLD

˃ Specifically it will examine

• Service availability

• CPDLC message latency performance against the GOLD RCP240 performance criteria

• ADS-C message latency performance against the GOLD RSP180 performance criteria

˃ If the required service performance is deemed to be met by the PARC then the PARC CWG chair is expected to recommend that the service can be used for routine FANS operations, including reduced separations

SB Safety – FANS Approvals Process

9 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 10: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

Evaluation Schedule

Will collect ICAO GOLD results until the end of 2015

˃ FANS1/A Aircraft

Hawaiian Airlines 767 & Airline #2 (To be confirmed)

˃ AOC ACARS Aircraft – In use today and growing

Mixture of airlines and bizjets that wish to use ACARS over IP and have EFB/Crew Data Applications

˃ Recommendations

Expect to exceed Classic Aero RCP240/RSP180 performance – January 2016

FANS1/A over SBB Project Plan & Report FAA PARC CWG activity with surrounding ANSP participation in the Pacific Region

10 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 11: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

Flying today over:

˃ CONUS

˃ NAT

˃ Gulf of Mexico

˃ WATRS

AOC Airlines in 2015

˃ NAT

˃ ASIA

˃ PACIFIC

Initial SBB AOC ACARS Flight Routes

Initial flights with Airbus ACJ showing 1-minute position reporting

Page 12: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

SBB AOC ACARS - Airbus ACJ flying today

- Note: Latency data shown for Inmarsat network portion only (does not include CSP or ANSP networks)

- Note: Small sample size

˃ Higher AOC Usage compared to air transport, but limited number of flights

Preliminary SBB AOC ACARS Latency Performance

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

ACARStran

sacons

Latency[s]

ACARSAGGWFromAircra

3.4 sec @95%

4.5 sec @99.9%

456 AOC ACARS Messages

~45 sec @95% for Classic

Initial SBB ACARS Latency Performance Chart (from aircraft)

12 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 13: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

First SB-S FANS Evaluation Flight 3rd June ‘15

13 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 14: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

First SB-S FANS Evaluation Flight 3rd June ‘15

14 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Page 15: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180

ACA

RS

tran

sact

ion

s

Latency [s]

ACARS AGGW From AircraftSB Safety FANS - Note: Latency data shown for Inmarsat network portion only (does not include CSP or ANSP networks)

- Note: Small sample size

First data from HAL N588HA

- 3rd to 17th June ‘15

Preliminary SB Safety FANS Latency Performance Initial SB Safety FANS Latency Performance Chart (from aircraft)

15 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

2.8 sec @95%

3.5 sec @99.9%

Page 16: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

Preliminary SB Safety FANS Latency Performance First HAL aircraft – SB only – ADS-C downlink latency – Data prepared by FAA

16 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

s s

Page 17: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

Preliminary SB Safety FANS Latency Performance For first HAL aircraft All media ADS-C downlink latency 3rd to 9th June

17 © Inmarsat Global Limited 2015 – ICAO NAT PBCS/2 17-19 June 2015

Data Prepared by FAA

Page 18: Inmarsat Update - International Civil Aviation Organization Meetings Seminars and...• Prioritised IP data supporting new applications: −Electronic Flight Bag −New Operational

Thank You For follow-up questions please contact: Andrew Ives or Gary Colledge [email protected][email protected]

AV

IAT

ION

> IC

AO

NAT P

BCS/2