Information Dissemination Strategy An Update Presenter: Bruce Locke.
-
Upload
ella-fleming -
Category
Documents
-
view
213 -
download
0
Transcript of Information Dissemination Strategy An Update Presenter: Bruce Locke.
Information Dissemination Strategy
An Update
Presenter: Bruce Locke
Project Announcement
Report Re-Engineering program has been approved
includes:
deploy tools to automatically generate XML documents (includes reports)
deploy a secure FTP site for access by people and by machines
redesign all reports to XML standards and retire all CSV, EDI, and HTML documents
repackage report content into more informative documents
deploy some new documents (for example, generator output data)
selected features
full versioning of all automated documents
more granular security for report access
all XML
IT Standing Committee Meeting September 09, 2003
Scope and Schedule
Report Re-Engineering program approved July 15
program consists of 8 projects over 2 years
project management beginning for full project suite with 2 projects already in progress, AD and FRE
IT Standing Committee Meeting September 09, 2003
Decommission Production
Report Facilities
Outbound Report Management Phase
2
Generator Information Disclosure
Report Renewal (Public)
Bank EDI Replacement
Report Renewal (Confidential)
File Routing Enhancements
ODS Infrastructure
Automated Document
Progress to Date
Automated document standards stakeholdered and published (see IMO web site)
Automated Document System (ADS) designed, built, just entering testing and expected in service by late Fall
XML demonstrations to various stakeholdering groups in progress
File Routing Enhancements complete and in service in Sept 9 Release
IT Standing Committee Meeting September 09, 2003
Stakeholdering
technical interface standards with ITSC
will it be a secure FTP, secure shell, other protocol?
details of document access security granularity
document set (by subject?) priorities with MOSC
what should we work on first: price reports, energy reports, system status reports, settlement documents, invoices?
What document sets should we be defining?
for each document set, IMO proposes:
to invite participation and form focused market stakeholder groups rather than consume time in the standing committees
time commitment and stakeholder task schedule to be defined before focus group formed to ensure project progresses and that committed active stakeholders participate
IT Standing Committee Meeting September 09, 2003