Infill Drilling Plan Map Infill Drilling Plan Map US$1300 current pit 1’ 1’2’ 3’ s NORTH...
4
1 Infill Drilling Plan Map US$1300 current pit 1’ 1’ 2’ 3’ Section lines NORTH Holes with pending assay result Holes with assay results received US$1300 ultimate pit US$1300 current pit 100m 0
Transcript of Infill Drilling Plan Map Infill Drilling Plan Map US$1300 current pit 1’ 1’2’ 3’ s NORTH...
1
Infill Drilling Plan Map
US$1300 current pit
1’
1’ 2’ 3’
Section lines
NORTH
Holes with pending assay result
Holes with assay results received
US$1300 ultimate pit
US$1300 current pit
100m
0
2
Infill Drilling Section 1
10m @ 2.73 g/t Au from 239m
21m @ 3.43 g/t Au from 331m
22m @ 4.50 g/t Au from 361m
11m @ 0.95 g/t Au from 264m
6m @ 3.12 g/t Au from 366m
20m @ 2.06 g/t Au from 407m
Infill drill holes
1’
US$1300 ultimate pit
US$1300 current pit
1
100m
3
Infill Drilling Section 2
30m @ 3.17 g/t Au from 240m
13m @ 7.33 g/t Au from 304m21m @ 3.43 g/t Au from 331m5m @ 3.54 g/t Au from 328m
6m @ 3.12 g/t Au from 366m
Infill drill holes
2’
US$1300 ultimate pit
US$1300 current pit
2
100m