INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I /...

53

Transcript of INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I /...

Page 1: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 2: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

OFFICES:

INDICATORS OF THE COMPANY:

Bucharest, Romania

Timișoara, Romania

2003

2017

Services:

Software:

Certificate & standards:

Staff: 65

2004200420082008

Divided as:

Architectural Design & General DesignBrief development & Feasibility studies Land Use & DensityFinancial and commercial feasibility Permitting consultancy & Construction ManagementMEP Engineering ServicesLandscaping Interior designMarketing & BrandingRendering

BIM (Building Information Modelling)AutocadOffice 365

EN ISO 14001:2004 standardsOHSAS 18001:2007 standardsQuality Management System ISO 9001:2008TUV_CERT certificate

Founding partners – 2Partners – 2Senior Associate – 3Associates – 2Lead Architects – 3Architects – 29Interns – 4ARendering – 3MEP – 11BIM Manager – 1PR & Communication – 1Construction Management – 1Contract Manager – 1Office Management – 1Financial Director – 1

founding partners

Arch. Andrei Şerbescu

Arch. Adrian Untaru

partner

Arch. Bogdan Brădăţeanu

partner

Arch. Esenghiul Abdul

20022003present

20022003present

20042009present

200320052017

Graduate – University of Architecture and Urbanism ‘Ion Mincu’, Bucharest;Founder of ADNBA;Partner of ADNBA; Lecturer / 1st year of studies, design studio, UAUIM.

Graduate – University of Architecture and Urbanism ‘Ion Mincu’, Bucharest;Founder of ADNBA;Partner of ADNBA.

Graduate – University of Architecture and Urbanism ‘Ion Mincu’, Bucharest;Becomes partner at ADNBAPartner of ADNBA.

Graduate – University of Architecture and Urbanism ‘Ion Mincu’, Bucharest;Master in Advanced Architectural Studies, The Bartlett, University College, London;

Architecture office, established in [email protected], www.adnba.ro

ESTABLISHMENT:

ADNBA Bucharest – Ion Voicu Street no 3.

ADNBA Timisoara – Amforei Street no 4.

Page 3: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

Andrei Șerbescu Petra Bodea

Cristina Lupu

Mihail Filipenco

Adrian Untaru

Tiberius Tudor Elena Zară

Bogdan Brădățeanu

Mihaela Dobre

Esenghiul Abdul Valentina Țigâră

Horia Munteanu

Laura Oniga

Traian Iacob

Rodica Dina Radu Constantin

Ana Simionescu

OUR TEAM:

Andrei Cârlescu

Ioana Tănăsie

Anca TesleviciChan-Woo ParkAndreea PrecupLaura Mihalache

Romina PasculoviciAdrian Trifu Mihaela Bâcu Theodor DinuAdrian Bratu

Diana Buța

Cristina Budan

Răzvan Gheorghe

Daniela Oprișan

Ana ȘtefanescuMatei Molnar

Halis StoicaCiprian Lazin

Raluca Răescu Lăcrămioara Vesparu

Gabriela RăduțăAlina Surduleasa Roxana Durdun

Ana BăbușDiana Necula Radu Stănescu

Valentin MărgoiCostin Chițu Mihai Brașoveanu

Robert CiubotaruDănuț CâcuMIhai Rotaru

Daniela Mureș Ciprian Ungurașu Adina Dobrota

Ioana Penescu Dragoș PuiuAndreea Cutieru Bogdan Nistor Constantin Ciocîrlan Răzvan Deju

Anca Bârdan

We are ADNBA, a group of dynamic architects, always in search of the right balance between experiment and experience. We are currently involved in a diverse body of work, including mostly residential, office and public projects. In all of these, we strive for a wider and wiser understanding of the city and its evolution, this being also the essential background for our thoughts, hopes and doubts. But upon this background, the specific situation which each project and place bring to us, togeth-er with its fragile ties to the people, the neighbourhoods and their stories, is what interests us most.

ADNBA TEAM

Laura Jigaranu

Anca Zaharia

Marcel Vasile

Răzvan Dincă Relu Popescu

Page 4: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

Built projects

In construction projects

Projects in progress

BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)MMU / Mumuleanu, Bucharest // housing, 3 450 sqm, 2014-2019 (21 units) OCD / Occidentului, Bucharest // housing, 2 765 sqm, 2014-2017 (20 units)LDA / Londra, Bucharest // housing, 1 799 sqm, 2015-2017 (7 units)Stefan cel Mare Bulding, Bucharest // reception lobby & lifts design, 350 sqm, 2016 DOG / Dogarilor, Bucharest // housing, 8 760 sqm, 2011-2014 (63 units)MRA / Mora, Bucharest // housing, 2 020 sqm, 2011-2014 (5 units)AAF / Aaron Florian, Bucharest // housing, 2 520 sqm, 2012-2015 (12 units)PTR / Petru Rareş, Bucharest // housing, 1 280 sqm, 2010 (7 units)O27 / Bucharest // villa extension and rehabilitation, 230 sqm, 2009 MCN / Maicăneşti, Bucharest // housing, 1 394 sqm, 2007-2010 (7 units)Giurcăneanu house, Bucharest // residential, 310 sqm, 2006 Mediterraneo, Neptun // commercial, restaurant, 1 400 sqm, 2003 Fabrik, Bucharest // commercial, 110 sqm, 2002

MTM / M0 / Millo Boutique Offices, Matei Millo, Bucharest // 12 521 sqm, 2017 - in progressBNS II / Aviatiei Park, Bucharest // housing, 19 800 sqm, 2018 - in progress (195 units)TMS / ISHO A, Timisoara // offices and housing, 20 051 sqm, 2017-2019 (140 units)DBV / Dumbrava, Bucharest // residential, 332 sqm, 2017-2019 DGV / Dragoș Vodă, Bucharest // housing, 1 477 sqm, 2017-2019 (17 units)SVR / Suvenir, Bucharest // housing, 8 000 sqm, 2017 - in progress (36 units)KOG / Kogalniceanu blvd., Bucharest // office building, 2 221 sqm, 2016-2019 BSV / Neagoe Basarab Housing // housing, 5 350 sqm, 2016 - 2019 (38 units)SFV / Sfintii Voievozi str., Bucharest // housing, 9 000 sqm, 2016 - in progress (55 units)CLD / Calderon, Bucharest // housing, 1 329 sqm, 2015-2019 (5 units)UNA / National University of Arts, Bucharest // extension and functional rehabilitation, 5 400 sqm (National competition first prize), 2008 - in progress

AMF / Amber Gardens, Tunari // housing, 6 500 sqm, 2018 - in progress (48 units)TMS / ISHO B, Timisoara //offices and housing, 26 455 sqm, 2018- in progress (198 units)MMR / Marmura, Bucharest // housing 62 467 sqm, 2017- in progress (458 units)TND / T 0 / Tandem Building, Matei Millo, Bucharest // 31 521 sqm, 2017 - in progressEMN / Eminescu, Bucharest // housing, 5 624 sqm, 2016 - in progress (43 units)PPR / Pipera, Voluntari // housing, 111 454 sqm, 2016 - in progress (793 units)TMS / Stuparilor, Timisoara // housing 7 700 sqm, 2016 - in progress (97 units)RDV / Radu Voda, Bucharest // housing, 2 640 sqm, 2016 - in progress (19 units)MGR / Magura // guest house

Not built SKY / Skytower, Bucharest // lobby / reception / lifts / terrace and office area design 773 sqm, 2018 - in progress MMR / Marmura, Bucharest // offices 62 467 sqm, 2018 PRC / Parcului, Bucharest // housing, 46 508 sqm, 2017 (367 units)PSC / Pascal Christian, Bucharest // housing, 6 715 sqm, 2016 (98 units) PRB / Porumbaru // housing, 2 421 sqm, 2016 (10 units) CRT / Badea Cartan, Bucharest // competition housing, 2 725 sqm, 2015 (18 units) CMB / The New Cambridge School, Bucharest // education, 5 200 sqm, 2015-2016BVC / Barbu Vacaresu, Bucharest // housing, 2014 (172 units)Johannes Honterus Courtyard, Brasov // rehabilitation and refurbishment of the BlackChurch’s courtyard and squares, 2013DGH / Dobrogeanu Gherea, Bucharest // housing, 1 680 sqm, 2013 (8 units)Park rehabilitation & public space for temporary market, Berzasca, Caras-Severin // EU funding, 2010Cozla, Caras-Severin // rehabilitation and redevelopment of an industrial site (for offices,hotels and leisure), 21 ha // EU funding, 2010Berzasca, Caras-Severin // protection of biodiversity and natural heritage; propermanagement system for the ‘Iron Gates’ natural park // EU funding, 2010PST / Peştera, Moeciu // holiday apartments, 2 340 sqm, 2008 (16 units)VNS/ Venus II, Mangalia // holiday apartments, 6 100 sqm, 2008 (128 units)

PROJECTS:PPR – nominated project Romanian Building Awards, Bucharest

LDA – winner at BIGGSEE Architecture Award 2019, Ljubljana, Slovenia

ADNBA – short-list at the 14th annual SEE Real Estate Awards for Architectural Firm of the Year

OCD – shortlisted among the 40 finalist projects of the EU Prize for Contemporary Architecture - Mies van der Rohe Award

LDA – nominated work for the EU Mies van der Rohe Award 2019, Barcelona

LDA – nominated work at The National Biennale of Architecture Bucharest, Housing category

OCD – nominated work at The National Biennale of Architecture Bucharest, Housing category

OCD – first prize at The National Annual of Architecture Bucharest, Housing category

OCD – Architecture prize at Romanian Design Week 2018, Bucharest, Architecture category

LDA – first prize at the Bucharest Architecture Annual, housing category

ADNBA – invited by Mr. Arch. Alejandro Aravena to be part of the main exhibition of the Venice Architecture Biennale 2016 / Hilariopolis installation

DOG – shortlisted among the 40 finalist projects of the EU Prize for Contemporary Architecture - Mies van der Rohe Award

DOG – winner at East Centric Architecture Triennale, Bucharest

DOG – winner at Romanian Building Awards, Bucharest

DOG – Milan Zlokovic Award for the Best Architectural Achievement in the Balkan Region, Belgrade

DOG – first prize at the Architecture Biennale, Bucharest

MRA – nominated project at the Bucharest Architecture Biennale, housing category

DOG – shortlisted project at the World of Architecture Festival (WAF 2014), Housing category

DOG – first prize at the Bucharest Architecture Annual, housing category

DOG – nominated work for the EU Prize for Contemporary Architecture - Mies van der Rohe Award 2015

MRA – nominated work for the EU Prize for Contemporary Architecture - Mies van der Rohe Award 2015

DOG – finalist project at the Romanian Green Building Council Awards, Bucharest

O27 – nominated project / Fluencies 2011, Arhitext Design Awards

MCN – first prize at the Architecture Annual, Timisoara

MCN – nominated work at the Bucharest Architecture Biennale, Architecture > 1 000 sqm section

MCN – nominated work for the Mies van der Rohe Awards 2011, Barcelona

PTR – nominated work at the Architecture Annual, Timisoara

Giurcăneanu House – nominated work at the Arhitext Design Awards, 2009

Mediterraneo Restaurant – nominated work for the Mies van der Rohe Awards 2006, Barcelona

Mediterraneo Restaurant – nominated work at the Arhitext Design Awards, 2005

AWARDS:2019

2019

2019

2019

2019

2018

2018

2018

2018

2018

2017

2016

2016

2016

2015

2015

2014

2014

2014

2014

2014

2014

2014

2011

2010

2010

2010

2010

2009

2006

Page 5: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

TRACK RECORD:

17

3 269

236

523 145

+21 K

• PROJECT INVESTMENT VALUE UP TO € 60 000 000

• INTEGRATED SERVICES

• MARKETING & BRANDING CAMPAIGNS

years of experience

designed units

housing projects

offices projects

sq meters designed

followers on social media - Facebook

PRESS & RECOGNITIONS:

08/03/2019 Occidentului 40 / ADNBA | ArchDaily

https://www.archdaily.com/910760/occidentului-40-adnba?ad_medium=widget&ad_name=more-from-office-article-show 1/12

Share in Whatsapp

06:00 - 6 February, 2019

ArchDaily Projects Apartments Romania ADNBA 2017 Occidentului 40 / ADNBA

Occidentului 40 / ADNBA

08/03/2019 A Corner Solution in Bucharest: Aaron Florian Apartment House by ADNBA - DETAIL - Magazine of Architecture + Construction D…

https://www.detail-online.com/article/a-corner-solution-in-bucharest-aaron-florian-apartment-house-by-adnba-31629/ 1/9

 TOPICS Buildings

Twelve three-roomapartments and a retailspace: the spatial programfor the new apartmentbuilding on Bucharest’sAaron Florian Street iseasy to sum up. However,in the hands of thearchitects from ADNBAwhat might seemmonotonous has become aconvincing buildingsculpture that sets anaccent in its environmentwithout dominating it.

Architects: ADNBA

Print article

A Corner Solution in Bucharest: Aaron Florian ApartmentHouse by ADNBA

Strada Aaron Florian is a quiet cul-de-sac in the north

of Bucharest’s inner city. It is difficult to recognize any

orderly structure to the block here, as it is in the

neighbouring districts. Most of the houses were

conceived as solitaires and arranged loosely along the

street. The heights of their eaves have little to do with

each other.

Nevertheless, broad stretches produce the image of a

typical southern European city with many closed-off

street spaces. This is just what the ADNBA architecture

studio wanted to recreate with their new five-storey

apartment building. The irregularly cut plot of land and

the line of the street, which curves just in front of the

plot, required an unconventional solution.

The imposing, white-plastered structure seems to float

above the glazed ground floor. The first upper storey is

©

08/03/2019 Flipboard: MORA Residential Building / ADNBA

https://flipboard.com/@AlexAlice/mora-residential-building-%2F-adnba/a-aVeFTUTKQo6nHUbI3Tnvdg%3Aa%3A127741399-f9e6155b47%2Farc… 1/3

A AlexAlice added this toHonours

MORA Residential Building / ADNBA

archdaily.com - Daniel Sánchez

The project is an intervention in a historic area of central Bucharest, within a

neighborhood with remarkable architectural values dating back to the …

Write a comment...

View on archdaily.com

STORIES CURATED FOR YOU

Sign Up Get the app Log In

08/03/2019 Despre Hilariopolis, amenajările în miniatură marca ADNBA

http://designist.ro/despre-hilariopolis-amenajarile-in-miniatura-marca-adnba/ 1/5

Arhitectură & Design interior

Case din România

Designeri & arhitecți români

Design de obiect

Design hibrid

Graphic Design

Design în oraș

News

Arte etc.

Eco

Fashion & Bijuterie

Food Design

Design travel

Video stories

Search

Home

Despre noi

Contact

Made in RO

Cursuri @ Creative Lear

Adresa ta de e

Aboneaza-te la

« Previous / Next » By Diana Bogdan / July 3, 2017 / Arte etc., Design în oraș, Designeri & arhitecți români / No Comments

Despre Hilariopolis, amenajările în miniaturămarca ADNBA

La sfârșitul lunii mai, pe tot parcursul Romanian Design Week 2017, era greu să deschizi Facebook-ul sauInstagram-ul și să nu dai peste vreo nouă amenajare miniaturală modelată în cele mai mici amănunte șifotografiată din fiecare unghi, care de care mai artistic. În cazul în care nu ai apucat să ajungi la expozițiacentrală a evenimentului, îți spunem aici despre ce e vorba: colecția de machete pe suport de hârtieHilariopolis, realizată de echipa ADN Birou de Arhitectură, despre care ți-am mai povestit aici, cândte anunțam că sunt primul birou de arhitectură românesc invitat atunci la Bienala de la Veneția.

Anul acesta, ADNBA au adus pentru prima dată la Romanian Design Week machetele și deseneleHilariopolis (supranume al Bucureștiului în secolul al XVIII-lea) – un amalgam de clădiri, străzi, curți șivieți redesenat, suprapus și stratificat. Noi am fost de-a dreptul hipnotizați de migala amenajărilor pusesub lupă, de fiecare aparat electrocasnic recreat în amănunt, de fiecare cearșaf răvășit, fiecare carte uitatăpe vreo etajeră și fiecare decorațiune. Toate devin mai importante decât clădirile în sine.

Cu

Cumun c

Cecas

Cât creacam37 m

Cum3 caÎn B

Livi38 dcendectranțări

Save

08/03/2019 L'Architecture d'Aujourd'hui | Venice Biennale 2016: AA's review (2/2) | L'Architecture d'Aujourd'hui

http://www.larchitecturedaujourdhui.fr/venice-biennial-2016-aas-selection-22/?lang=en 1/14

EVENTS (HTTP://WWW.LARCHITECTUREDAUJOURDHUI.FR/CATEGORY/EVENTS/?LANG=EN)

VENICE BIENNALE 2016: AA’S REVIEW (2/2)(HTTP://WWW.LARCHITECTUREDAUJOURDHUI.FR/VENICE-BIENNIAL-2016-AAS-SELECTION-22/?LANG=EN)

Freshly back from Venise, AA’s editorial team has put together a review of the 15th Venice Biennale of Architecture.Vernacular architecture, materials reuse, ancestral know-how, temporary cities… many topics address this year’s “Reporting from the front” theme,proposed by Alejandro Aravena. Today, have a look at a selection of projects exhibited in the Arsenal.

Turkish Pavilion : “Darzanà : Two Arsenals, One Vessel”, Feride Çiçekoğlu, Mehmet Kütükçüoğlu, Ertuğ Uçar.

(HTTP://WWW.LARCHITECTUREDAUJOURDHUI.FR/?

LANG=EN)

08/03/2019 AARON FLORIAN HOUSING BY ADNBA Modern Home in București, Municipiul… on Dwell

https://www.dwell.com/home/aaron-florian-housing-by-adnba-4e9ab58f 1/17

SUBSCRIBE

PHOTOS STORIES VIDEOS SHOP RENTALS HOMES

AARON FLORIAN HOUSING BY ADNBA

București, Municipiul București, Romania

By ADNBA

View Photos

Aaron Florian Apartment Building, is an honest answer to a particular urban

setting: an irregular plot, the closeness of the opposite buildingraising privacy

issues, a blind wall to a difficult neighbour and an inflection of the street. All

these produce an atypical configuration - a building with floors successively

recessed, the upper floors providing more light to the narrow street and the

exterior spaces directing the views along it.

� �Our site uses cookies. By continuing to use our website, you agree to our privacy policy. Accept

08/03/2019 Dogarilor Apartment Building / ADNBA | ArchDaily

https://www.archdaily.com/524848/dogarilor-apartment-building-adn-birou-de-arhitectura?ad_medium=widget&ad_name=more-from-office-article… 1/14

Share in Whatsapp

01:00 - 15 July, 2014

ArchDaily Projects Apartments Romania ADNBA 2014 Dogarilor Apartment Building / ADNBA

Dogarilor Apartment Building / ADNBA

08/03/2019 Andrei Șerbescu – bucharest triennale

https://bucharest-triennale.eu/2018/11/12/andrei-serbescu/ 1/3

Andrei Șerbescu

ADNBA’s work has been several times nominated for the European Prize for Contemporary

Architecture Mies van der Rohe Awards, for which it was also shortlisted within the last 40

projects in 2015.

PEOPLE

...

NOVEMBER 12, 2018 8:38 pm 0 0 176 Views

OPEN CALL3 ABOUT JURY CALENDAR

03/08/2019 About Agora Experiments

08/03/2019 Aaron Florian Housing / ADNBA | ArchDaily

https://www.archdaily.com/882243/aaron-florian-housing-adnba?ad_medium=widget&ad_name=more-from-office-article-show 1/11

Share in Whatsapp

05:00 - 29 October, 2017

ArchDaily Projects Housing Romania ADNBA 2015 Aaron Florian Housing / ADNBA

Aaron Florian Housing / ADNBA

01/04/2019 Stone apartment building in Bucharest features recessed terraces

https://www.dezeen.com/2018/02/12/stone-clad-apartment-building-architecture-adnba-recessed-windows-terraces-bucharest-romania/ 1/13

Stone-clad apartment building in Bucharest features recessed windows andStone-clad apartment building in Bucharest features recessed windows andterracesterraces

Alyn Griffiths

Alyn Griffiths

|

|

12 February 2�18

12 February 2�18

1 comment

1 comment

The crisp white?stone facades of this luxury apartment block in

The crisp white?stone facades of this luxury apartment block in

Bucharest

Bucharest

by local studio ADNBA

by local studio ADNBA

are punctured by large recessed windows that help to reduce the building's overall massing so it

are punctured by large recessed windows that help to reduce the building's overall massing so it

matches the scale of its urban conte7t.

matches the scale of its urban context.

08/03/2019 Simetrie asimetrică: locuințele colective ADNBA – igloo

https://www.igloo.ro/simetrie-asimetrica-locuintele-colective-adnba/ 1/4

IGLOO > ARHITECTURA > SIMETRIE ASIMETRICĂ: LOCUINŢELE COLECTIVE ADNBA

Simetrie asimetrică: locuințelecolective ADNBA

23 iunie 2017

Text: Ioana Iancu

Foto: Cosmin Dragomir

Proiect: ADNBA

Arhitecţi: Adrian Untaru, Andrei Şerbescu,

Bogdan Brădăţeanu, Carmen Petrea,

Alexandru Apostol

Dezvoltator: Forte Partners

An: 2017

SHARE ARTICOL PE:

a

Facebookd

Twitterf

Google+h

Pinterestk

LinkedIn

Imobilul rezidenţial situat la intersecţia străzilor Washington şi Londra a apărut

recent în pei sa jul urban bucureştean, indicând apartenenţa la ima ginea ADNBA prin

moderaţia discursului şi e le ganţa intervenţiei arhitecturale.

Proiectul este câştigător al secţiunii „Arhitectura locuinţei” din cadrul Anualei de

Arhitectură Bucureşti 2017.

Locuinţele colective au un regim de înălţime scăzut şi un înalt confort urban.

Arhitectura lor aduce un omagiu modernismului, însă accen tuează traveeleAcest site foloseste cookies pentru a va imbunatati experienta. A�a mai multe OKOK

08/03/2019 Occidentului 40

https://www.anuala.ro/proiecte/2018/038/ 1/2

2018ARHITECTURA LOCUINȚEI

Locuinta de vacanta

Occidentului 40

Casa Studio

Casă în stil mediteranean

Ansamblul Mărăcineni Cubic 6

Casa M

Casa Baker

Casă pasivă - duplex

Locuința familiei Sandu

Complex rezidențial Străulești

Casa PI

Vila S

Comana House

Locuinţă în Ordoreanu

Locuinta in Bucurestii Noi

Casa DM

Casa H33

locuinta

Ansamblu locuinte individuale.Emil Racoviță

Imobil de locuințe

Prima pagină » Proiecte » Ediţia 2018 » Arhitectura locuinței

Premiul secțiunii „Arhitectura locuinței”

Occidentului 40

București, România

Autori: arh. Adrian UNTARU, arh. Bogdan BRĂDĂȚEANU, arh. Andrei ȘERBESCU, arh. ValentinaȚIGÂRĂ, arh. Pavel ALBU / ADNBA Colaboratori: Manager de santier: Raluca Răescu Structura: WERTYKL SRL Instalații: ISATERM Finisaje și fațadă: Edil Construct 2004 Fotografie: Cosmin Dragomir, Andrei Mărgulescu Video: Andrei Mărgulescu

2018 2017 2016 2015 2014 2013 2012 2011 2010 ...

ORGANIZATOR

PROGRAM EDIȚIA 2018

12 iunie 2018: Postare online șabloane panouri secțiuni AAB2018

13-22 iunie 2018: Predare proiecte

23-29 iunie 2018: Preselecție

30 iunie 2018: Anunțarea rezultatelor preselecției

30 iunie - 4 iulie 2018: Jurizare

5 iulie 2018: Gala AAB2018

REGULAMENTRegulament Anuala 2018.pdf

ȘABLOANE PANOURISabloane-panouri-aab2018.zip

ÎNSCRIERE ȘI PREDARE

Înscrierea proiectelor în Concurs se face exclusiv prin completarea formularului online aflat la adresa: https://www.entryform.ro/anuala2018/

SPONSORI

PARTENERI

Like

08/03/2019 MORA Residential Building / ADNBA | ArchDaily

https://www.archdaily.com/560140/mora-residential-building-adn-birou-de-arhitectura?ad_medium=widget&ad_name=more-from-office-article-show 1/9

Share in Whatsapp

01:00 - 31 October, 2014

ArchDaily Projects Apartments Romania ADNBA 2014 MORA Residential Building / ADNBA

MORA Residential Building / ADNBA

08/03/2019 Viaţa la bloc altfel: Cum arată unele dintre cele mai spectaculoase proiecte rezidenţiale care fac uitată noţiunea de "cartier dormitor…

https://www.zf.ro/romania100/dupa-afaceri/arts-design/viata-la-bloc-altfel-cum-arata-unele-dintre-cele-mai-spectaculoase-proiecte-rezidentiale-car… 1/4

Curs valutar Conferinte Anuare Fonduri Mutuale NewsletterLeu / EUR 4.7410 Leu / GBP 5.5311 Leu / USD 4.2261

Home ZF 24 Eveniment Burse-Fonduri mutuale Bănci-Asigurări Internaţional Opinii WikiZF Profesii

Fiscalitate Constructii Auto Finanţe Personale HiTech DA Premium ZF Print ZFCORPORATE

Companii

galerie foto

Viaţa la bloc altfel: Cum arată unele dintre cele maispectaculoase proiecte rezidenţiale care fac uitată

AB

ON

EA

-TE

Page 6: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

SOME OF OUR CLIENTS:

MEP ENGINEERING:

OUR INTEGRATED SERVICES:

MEP COORDINATOR / PREVIOUS EXPERIENCE AS TEAM LEADER WITH OTHER COMPANIES:

CURRENT PROJECTS:

6 00028 700 20 38099 000

sq meters residential

sq meters hotel

sq meters offices

sq meters retail

ADN BPI provide a full range of HVAC, MEP and energy solutions. With broad, qualified and highly experienced in-house engineering, design, energy efficiency, project management and field service professionals, ADNBPI can handle commercial, residential or offices projects.

- MMR / Marmura, Bucharest // housing 62 467 sqm, 2017- in progress (458 units);- TMS / ISHO B, Timisoara //offices and housing, 26 455 sqm, 2018- in progress (198 units).

Page 7: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

BIM / REVIT:We implemented BIM into our workflow which helps us improve collaboration between the different disciplines involved in the design process, while significantly reducing labor time. It also helps us reduce the risk of potential on-site clashes between building elements. With BIM, designers benefit from all of the different inputs compiled and shared in a model—in a way that 2D software isn’t able to capture. Another of the advantages of BIM is the increasing number of simulation tools that allow designers to visualize the spaces they are creating in real time and study such things as the sunlight during different seasons. BIM enables teams to collaborate and communicate more effectively by allowing them to get a truly global view of a project.

Page 8: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

ARENDERING:

We help our clients present their ideas, products and projects in the best light. We offer interior visualization, exterior visualization, interior and exterior design renders, photoshop, animation, modeling, video, virtual tours and VR (virtual reality). We like to believe that we envision the ideas of the architects in the best way possible.

VIRTUAL TOURS:

SELECTIVE WORK:

INTERIOR DESIGN:

MARKETING & BRANDING:

SELECTIVE WORK:

While architecture deals with the overall order of volumes and structure in order to obtain coherent and expresive spaces, interior design takes the next step further. It defines and refines the identity and atmosphere of inner spaces through materials, details, textures, colours and lights. Our projects range from residential to commercial and public areas for office buildings and are a much needed part for a complete architecture.

Page 9: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

ACCOMPLISHMENTS FOR 2017-2019:

08/03/2019 Ultimele apartamente disponibile in ISHO Riverside A - TION

http://www.tion.ro/ultimele-apartamente-disponibile-in-isho-riverside-a/2005968 1/3

HOME ŞTIRI VIDEO SPORT PARTY TM 2021 TURISM ANGAJARI ANDROIDITCOM

Meteo Fata zilei Arhiva

TION TION Ştirile judeţului Timiş Ultimele apartamente disponibile in ISHO Riverside A

Ultimele apartamente disponibile in ISHORiverside A19. martie 2018 12:07 Reactualizat la: 19. martie 2018 12:25

ADVERTORIAL. Mai sunt doar cateva apartamente disponibile încladirea Riverside A, situate pe malul Begai, in inima verde aTimisoarei, in cartierul ISHO. Cladirea este recunoscuta in toata tarapentru noul concept de locuire urbana propus, caracterizat printr-unconfort deosebit, o localizare de exceptie, acces la facilitati unice.Informatii la zi despre disponibilitati pot fi obtinute prin telefon la0371 33 63 63 sau prin email la [email protected].

© foto: Take Project

Ultimele apartamente disponibile in ISHO Riverside A

O cladire unica in Timisoara cu piscina interioara si gym si propria terasarooftop

Cladirea Riverside A este unica in Timisoara, locatarii acesteia fiind singurii din oras carepot beneficia de un gym pe doua etaje, complet echipat, dar si de o piscina interioara, incladirea in care locuiesc. De asemenea, ei vor avea acces la o terasa de circa 300 mp situatala etajul 5, un rooftop cu o vedere spectaculoasa si un mic parc la inaltime, accesibil exclusivlocatarilor. Un spatiu comun privat dedicat evenimentelor completeaza facilitatile ISHORiverside A si o recomanda pentru stilul de locuire complet diferit fata de tot ce exista la oraactuala in Timisoara. De altfel, unul din atuurile conceptului propus de ISHO este

MAI MULTE STIRI DIN CATEGORIA TIONŞTIRILE JUDEŢULUI TIMIŞ

TION ŞTIRILE JUDEŢULUI TIMIŞ

De 8 Martie fă cel mai frumoscadou fetei pe care o iubești: unsalt cu parașuta

TION ŞTIRILE JUDEŢULUI TIMIŞ

Cumpărăturile de 8 martie se faccel mai ușor la mall. A începutLady Expo

TION ŞTIRILE JUDEŢULUI TIMIŞ

CNSCBT: 21 de cazuri de gripăconfirmate în Timiș, opt decese

TION ŞTIRILE JUDEŢULUI TIMIŞ

Primele măsuri luate de Robu înAurora-Flavia! Se instituie un„regim mai special” pentru șoferi

TION ŞTIRILE JUDEŢULUI TIMIŞ

08/03/2019 Forte Partners investeşte 25 de milioane de euro într-o clădire de birouri din apropierea Palatului Telefoanelor din Bucureşti | Econ…

https://www.economica.net/forte-partners-investeste-25-de-milioane-de-euro-intr-o-cladire-de-birouri-din-apropierea-palatului-telefoanelor-din-buc… 1/8

XX

BUSINESS LA MINUT

RTV VIDEO RTV LIVE RTV MOBI RSS LOGIN DESPRE NOI ECHIPA CONTACT PUBLICITATE

1EUR=4.7410 RON | Bucureşti 19 º

HOME NEWS EXTERN FINANŢE/BĂNCI COMPANII INVESTIŢII IMOBILIARE AUTO IT&C JOBURI/HR TURISM

Forte Partners investeşte 25 de milioane de euro într-o nouăclădire de birouri din Bucureşti, care va fi construită pe terenulde 1.700 de mp cumpărat anul trecut de la Telekom, de pe stradaMatei Millo. 

Comenteaza

ECONOMIE » COMPANII

Forte Partners investeşte 25 de milioane deeuro într-o clădire de birouri din apropiereaPalatului Telefoanelor din Bucureşti24 oct, 13:10 | Andrada GhiraAndrada Ghira | ECONOMICA.netECONOMICA.net

Dezvoltatorul Forte Partners are autorizaţia de construcţie pentru o nouă clădire de burouri înBucureşti, pe un teren de 1.700 de mp, aflat în imediata apropiere a Palatului Telefoanelor.Lucrările de construcţie la proiectul de 25 de milioane de euro vor fi demarate în curând,potrivit informaţiilor ECONOMICA.NET .

Clădirea va avea o suprafaţă închiriabilă de 8.400 de mp.

Forte Partners a cumpărat în toamna anului trecut un teren de 1.700 de mp din spatelehotelului Novotel. Terenul este situat într-o zonă istorică a Capitalei, în imediata vecinătate aPalatului Telefoanelor, prima clădire înaltă din București construită pe structură metalică. Peacelași segment al străzii Calea Victoriei regăsim Hotelul Capșa, Cercul Militar construit deCarol I, recent restauratul Grand Hotel du Boulevard precum și alte clădiri cu valoare istoricăși arhitecturală

Forte Partners, fondat în 2014, este unul dintre cei mai importanți dezvoltatori imobiliari de

Cautare...

Totul despre noua lege apensiilor »

Ultima variantă a legii pensiilormodifică formula de calcul apensiei şi ajutorul de deces

Miercuri, 10 Octombrie 2018 13:17

Efectele noii legi a pensiilor: Casade Pensii va angaja 1.300 deoameni în anul 2019 ca să poată

recalcula toate pensiile Duminică, 14 Octombrie 2018 21:56

Noua lege a pensiilor: cum secalculează punctajele la pensie -noutăţi şi clarificări

Duminică, 26 August 2018 21:29

CELE MAI NOI ŞTIRI DIN COMPANII »

Ministrul Transporturilor: Blocareabugetului duce la plata cu întârziere aconstructorilor

Apare o nouă piaţă. Regenerabilii potvinde acum energia şi certificatele verzi"la pachet"

Cel mai mare fond suveran din lume, cel alNorvegiei, va elimina din portofoliul săuacţiunile companiilor din petrol şi gaze

Ministrul Transporturilor: Vom reziliacontractele cu constructorii neserioşi carenu-şi fac treaba

CNAIR schimbă din aprilie modul decirculaţie pe DN2, unul dintre cele maipericuloase drumuri din ţară

Siteul ECONOMICA foloseste cookies. Continuarea navigarii pe acest site se considera acceptare a politicii de utilizare a cookies. Află mai multe accesand POLITICA COOKIES

Like 38K

INDICI BURSIERI BET 7860.35 -0.001 BETPlus 1174.56 -0.001 BET-FI 35673.40 0.0021 BET-NG 668.13 -0.002

Introduceti aici adresa de email

Fii primul care aflacele mai importante stiri!

Aboneaza-te la newsletter-ulECONOMICA.NET!ECONOMICA.NET!

Business la minut

Powered byTradeville

AVIATEI PARK I & IIClient: Skywire DevelopmentNumber of units: 176Concept DesignGeneral Design Interior Design

TO / MATEI MILLOClient: Forte Partners31 521 sqm Concept DesignGeneral Design / DTACConstruction documentation supervisor

AVALON ESTATEClient: Prime KapitalNumber of units: 793Concept DesignGeneral Design Interior Design

KOGALNICEANU OFFICEClient: Primavera DevelopmentConcept DesignGeneral Design

ISHO AClient: Mulberry DevelopmentNumber of units: 140Concept DesignGeneral Design Interior Design

MARMURA RESIDENCEClient: Prime KapitalNumber of units: 450Concept DesignGeneral Design Interior Design

MO / MATEI MILLOClient: Forte Partners12 521 sqm Concept DesignGeneral Design / DTACConstruction documentation supervisor

SERBAN VODA OFFICEClient: Forte Partners46 470 sqm Concept Design further developed with Chapman Taylor

08/03/2019 Prime Kapital announces its first Romanian residential project, Avalon Estate - Business Review

http://business-review.eu/property/residential-property/prime-kapital-announces-its-first-romanian-residential-project-avalon-estate-172422 1/4

Prime Kapital announces its first Romanianresidential project, Avalon EstateNewsroom 07/06/2018 | 14:06

Regional real estate developer and investor Prime Kapital announcesits first residential project, Avalon Estate, offering approximately 800residential units within a gated-community concept.

Located in the Northern area of Bucharest and in proximity to Pipera andBarbu Vacarescu office areas, Avalon Estate spans over 8.1 hectares andfeatures more than 2 hectares of centralized green spaces for theexclusive use of residents.

The large-scale residential complex, estimated to be completed in 2024,will include a Club house and lake access, 1.3 ha of park with play areasfor children, 24-7 security and car-free alleys ensuring safety of thecommunity within a well-designed urban concept.

Search articles

RESIDENTIAL

08/03/2019 (P) Aviaţiei Park un nou proiect rezidenţial situat în Nordul Capitalei dezvoltat de Forte Partners | Ziarul Financiar

https://www.zf.ro/info/p-aviatiei-park-un-nou-proiect-rezidential-situat-in-nordul-capitalei-dezvoltat-de-forte-partners-16843252 1/5

Curs valutar Conferinte Anuare Fonduri Mutuale NewsletterLeu / EUR 4.7410 Leu / GBP 5.5311 Leu / USD 4.2261

Home ZF 24 Eveniment Burse-Fonduri mutuale Bănci-Asigurări Internaţional Opinii WikiZF Profesii

Fiscalitate Constructii Auto Finanţe Personale HiTech DA Premium ZF Print ZFCORPORATE

Companii

Print Mail

Autor: Publicitate 6 dec 2017 1615

(P) Aviaţiei Park un nou proiect rezidenţialsituat în Nordul Capitalei dezvoltat de FortePartners

Cele mai îndrăznețe idei și vise prind viață mai întâi în proiecte de arhitectură

inovative ce sunt ulterior transpuse în realitate și devin clădiri și imobile

rezidențiale în care îți dorești din toată inima să locuiești, de aceea te invităm

să vezi transpunerea cuvintelor în realitate în proiectul rezidențial Aviației

Park, dezvoltat de Forte Partners și proiectat de Biroul de Arhitectură ADNBA. 

Creativ, contemporan, util Diferența dintre un proiect rezidențial de succes și

unul care te face să spui WOW, constă în atenția oferită celor mai mici detalii,

iar premiul câștigat la secțiunea “Locuințe” la Anuala de Arhitectură

București, demonstrează abilitatea dezvoltatorului Forte Partners, precum și a

echipei de proiectare ADNBA de a livra calitate în arhitectură și execuție.

Proiectul Aviației Park va dispune de 352 de apartamente (cu diferite

compartimentări : tip studio, 2 camere, 3 camere, 4 camere și duplexuri cu 3

camere și  4 camere) situate într-o locație extrem de râvnită din București-

cartierul Aviației.

AVERTISMENTapocaliptic: Se apropie ofurtună teribilă deRomânia. Va fi cea maiAFECTATĂ ţarăeuropeană

Brandul care vinde opereche de blugi la 10secunde ajunge înRomânia. Unde se aflăprimul magazin

Cum a ajuns fiica uneicroitorese din Constanţasă deţină o companie de 3miliarde de dolari

| e-paper

TweetÎmi place Distribuie Share

caută în site

ultimele 24 ore

O istorie a seriei Galaxy: smartphone-urile careau schimbat într-un deceniu piaţa globală detelefoane mobile și au transformat Samsung înliderul industriei

1

vezi mai multe

Ţie şi altor 144 vă place asta

Ziarul FinanciarZiarul FinanciarZiarul Financiar333.820 aprecieri333.820 aprecieri333.820 aprecieri

Îţi place Trimite mesaj

AB

ON

EA

-TE

INFO

CELE MAI CITITE ȘTIRI

BUSINESS MAGAZIN

CALDERON HOUSINGClient: Forte PartnersNumber of units: 5Concept DesignGeneral Design Interior Design

AVIATIEI PARK IIClient: Forte PartnersNumber of units: 195Concept DesignGeneral Design Interior Design

DRAGOȘ VODĂClient: Pop PropertiesNumber of units: 17Concept DesignGeneral Design Interior Design

ISHO BClient: Mulberry DevelopmentNumber of units: 198Concept DesignGeneral Design Interior Design

SFINȚII VOIEVOZIClient: Urban SpacesNumber of units: 55Concept DesignGeneral Design Interior Design

AMBER FORESTClient: AlesonorNumber of units: 48Concept DesignGeneral Design Interior Design

SUVENIR HOUSINGClient: Forte PartnersNumber of units: 36Concept DesignGeneral Design Interior Design

MUMULEANU HOUSINGClient: Urban SpacesNumber of units: 21Concept DesignGeneral Design Interior Design

Page 10: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

Built projects

In construction projects

Projects in progress

BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)MMU / Mumuleanu, Bucharest // housing, 3 450 sqm, 2014-2019 (21 units) OCD / Occidentului, Bucharest // housing, 2 765 sqm, 2014-2017 (20 units)LDA / Londra, Bucharest // housing, 1 799 sqm, 2015-2017 (7 units)Stefan cel Mare Bulding, Bucharest // reception lobby & lifts design, 350 sqm, 2016 DOG / Dogarilor, Bucharest // housing, 8 760 sqm, 2011-2014 (63 units)MRA / Mora, Bucharest // housing, 2 020 sqm, 2011-2014 (5 units)AAF / Aaron Florian, Bucharest // housing, 2 520 sqm, 2012-2015 (12 units)PTR / Petru Rareş, Bucharest // housing, 1 280 sqm, 2010 (7 units)O27 / Bucharest // villa extension and rehabilitation, 230 sqm, 2009 MCN / Maicăneşti, Bucharest // housing, 1 394 sqm, 2007-2010 (7 units)Giurcăneanu house, Bucharest // residential, 310 sqm, 2006 Mediterraneo, Neptun // commercial, restaurant, 1 400 sqm, 2003 Fabrik, Bucharest // commercial, 110 sqm, 2002

MTM / M0 / Millo Boutique Offices, Matei Millo, Bucharest // 12 521 sqm, 2017 - in progressBNS II / Aviatiei Park, Bucharest // housing, 19 800 sqm, 2018 - in progress (195 units)TMS / ISHO A, Timisoara // offices and housing, 20 051 sqm, 2017-2019 (140 units)DBV / Dumbrava, Bucharest // residential, 332 sqm, 2017-2019 DGV / Dragoș Vodă, Bucharest // housing, 1 477 sqm, 2017-2019 (17 units)SVR / Suvenir, Bucharest // housing, 8 000 sqm, 2017 - in progress (36 units)KOG / Kogalniceanu blvd., Bucharest // office building, 2 221 sqm, 2016-2019 BSV / Neagoe Basarab Housing // housing, 5 350 sqm, 2016 - 2019 (38 units)SFV / Sfintii Voievozi str., Bucharest // housing, 9 000 sqm, 2016 - in progress (55 units)CLD / Calderon, Bucharest // housing, 1 329 sqm, 2015-2019 (5 units)UNA / National University of Arts, Bucharest // extension and functional rehabilitation, 5 400 sqm (National competition first prize), 2008 - in progress

AMF / Amber Gardens, Tunari // housing, 6 500 sqm, 2018 - in progress (48 units)TMS / ISHO B, Timisoara //offices and housing, 26 455 sqm, 2018- in progress (198 units)MMR / Marmura, Bucharest // housing 62 467 sqm, 2017- in progress (450 units)TND / T 0 / Tandem Building, Matei Millo, Bucharest // 31 521 sqm, 2017 - in progressEMN / Eminescu, Bucharest // housing, 5 624 sqm, 2016 - in progress (43 units)PPR / Pipera, Voluntari // housing, 111 454 sqm, 2016 - in progress (793 units)TMS / Stuparilor, Timisoara // housing 7 700 sqm, 2016 - in progress (97 units)RDV / Radu Voda, Bucharest // housing, 2 640 sqm, 2016 - in progress (19 units)MGR / Magura // guest house

Not built SKY / Skytower, Bucharest // lobby / reception / lifts / terrace and office area design 773 sqm, 2018 - in progress MMR / Marmura, Bucharest // offices 62 467 sqm, 2018 PRC / Parcului, Bucharest // housing, 46 508 sqm, 2017 (367 units)PSC / Pascal Christian, Bucharest // housing, 6 715 sqm, 2016 (98 units) PRB / Porumbaru // housing, 2 421 sqm, 2016 (10 units) CRT / Badea Cartan, Bucharest // competition housing, 2 725 sqm, 2015 (18 units) CMB / The New Cambridge School, Bucharest // education, 5 200 sqm, 2015-2016BVC / Barbu Vacaresu, Bucharest // housing, 2014 (172 units)Johannes Honterus Courtyard, Brasov // rehabilitation and refurbishment of the BlackChurch’s courtyard and squares, 2013DGH / Dobrogeanu Gherea, Bucharest // housing, 1 680 sqm, 2013 (8 units)Park rehabilitation & public space for temporary market, Berzasca, Caras-Severin // EU funding, 2010Cozla, Caras-Severin // rehabilitation and redevelopment of an industrial site (for offices,hotels and leisure), 21 ha // EU funding, 2010Berzasca, Caras-Severin // protection of biodiversity and natural heritage; propermanagement system for the ‘Iron Gates’ natural park // EU funding, 2010PST / Peştera, Moeciu // holiday apartments, 2 340 sqm, 2008 (16 units)VNS/ Venus II, Mangalia // holiday apartments, 6 100 sqm, 2008 (128 units)

PROJECTS:PPR – nominated project Romanian Building Awards, Bucharest

LDA – winner at BIGGSEE Architecture Award 2019, Ljubljana, Slovenia

ADNBA – short-list at the 14th annual SEE Real Estate Awards for Architectural Firm of the Year

OCD – shortlisted among the 40 finalist projects of the EU Prize for Contemporary Architecture - Mies van der Rohe Award

LDA – nominated work for the EU Mies van der Rohe Award 2019, Barcelona

LDA – nominated work at The National Biennale of Architecture Bucharest, Housing category

OCD – nominated work at The National Biennale of Architecture Bucharest, Housing category

OCD – first prize at The National Annual of Architecture Bucharest, Housing category

OCD – Architecture prize at Romanian Design Week 2018, Bucharest, Architecture category

LDA – first prize at the Bucharest Architecture Annual, housing category

ADNBA – invited by Mr. Arch. Alejandro Aravena to be part of the main exhibition of the Venice Architecture Biennale 2016 / Hilariopolis installation

DOG – shortlisted among the 40 finalist projects of the EU Prize for Contemporary Architecture - Mies van der Rohe Award

DOG – winner at East Centric Architecture Triennale, Bucharest

DOG – winner at Romanian Building Awards, Bucharest

DOG – Milan Zlokovic Award for the Best Architectural Achievement in the Balkan Region, Belgrade

DOG – first prize at the Architecture Biennale, Bucharest

MRA – nominated project at the Bucharest Architecture Biennale, housing category

DOG – shortlisted project at the World of Architecture Festival (WAF 2014), Housing category

DOG – first prize at the Bucharest Architecture Annual, housing category

DOG – nominated work for the EU Prize for Contemporary Architecture - Mies van der Rohe Award 2015

MRA – nominated work for the EU Prize for Contemporary Architecture - Mies van der Rohe Award 2015

DOG – finalist project at the Romanian Green Building Council Awards, Bucharest

O27 – nominated project / Fluencies 2011, Arhitext Design Awards

MCN – first prize at the Architecture Annual, Timisoara

MCN – nominated work at the Bucharest Architecture Biennale, Architecture > 1 000 sqm section

MCN – nominated work for the Mies van der Rohe Awards 2011, Barcelona

PTR – nominated work at the Architecture Annual, Timisoara

Giurcăneanu House – nominated work at the Arhitext Design Awards, 2009

Mediterraneo Restaurant – nominated work for the Mies van der Rohe Awards 2006, Barcelona

Mediterraneo Restaurant – nominated work at the Arhitext Design Awards, 2005

AWARDS:2019

2019

2019

2019

2019

2018

2018

2018

2018

2018

2017

2016

2016

2016

2015

2015

2014

2014

2014

2014

2014

2014

2014

2011

2010

2010

2010

2010

2009

2006

Page 11: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

DOG / Dogarilor, Bucharest // housing, 8 760 sqm, 2011-2014

Page 12: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 13: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 14: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

AAF / Aaron Florian, Bucharest // housing, 2 520 sqm, 2012-2015

Page 15: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

MRA II / Mora, Bucharest // housing, 2 020 sqm, 2011-2014

Page 16: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

LDA / Londra, Bucharest // housing, 1 799 sqm, 2015-2017

Page 17: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

OCD / Occidentului, Bucharest // housing, 2 765 sqm, 2014-2017

Page 18: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

BNS I / Phase I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016 - in progress

Page 19: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 20: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

BNS II / Phase II / Aviatiei Park, Bucharest // housing, 19 800 sqm, 2018 - in progress

Page 21: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

PPR / Pipera, Voluntari // housing, 111 454 sqm, 2016 - in progress

Page 22: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 23: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 24: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

MMR / Marmura, Bucharest // housing, 62 467 sqm 2017 - in progress

Page 25: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 26: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 27: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

TMS A / ISHO A, Timisoara // offices and housing, 20 051 sqm, 2017 - in progress

Page 28: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

TMS A / ISHO A, Timisoara // offices and housing, 20 051 sqm, 2017 - in progress

Page 29: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

TMS B / ISHO B, Timisoara // offices and housing, 26 455 sqm, 2018 - in progress

Page 30: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

MMU / Mumuleanu Housing, Bucharest // housing, 3 450 sqm, 2014-2019

Page 31: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 32: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

BSV / Neagoe Basarab Housing // housing, 5 350 sqm, 2016 - in progress

Page 33: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

CLD / Calderon, Bucharest // housing, 1 329 sqm, 2015 - in progress

Page 34: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 35: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 36: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 37: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

DGV / Dragoș Vodă, Bucharest // housing, 2 534 sqm, 2017 - in progress

Page 38: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 39: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

SFV / Sfintii Voievozi, Bucharest // housing, 9 000 sqm, 2016 - in progress

Page 40: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

SVR / Suvenir, Bucharest // housing, 8 000 sqm, 2018 - in progress

Page 41: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

AMF / Amber Gardens, Tunari // housing, 6 500 sqm, 2018 - in progress

Page 42: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

MTM / Millo Boutique Offices, Matei Millo, Bucharest // offices, 12 521 sqm, 2017 - in progress

Page 43: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 44: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 45: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

TND / Tandem Building, Matei Millo, Bucharest // offices, 31 521 sqm, 2017 - in progress

Page 46: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 47: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

KOG / Kogalniceanu, Kogalniceanu blvd., Bucharest // offices, 5 000 sqm, 2016 - 2019

Page 48: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)
Page 49: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

SBV / Serban Voda, Bucharest // offices & retail, 46 470 sqm, 2017 - in progress

Page 50: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

MMR / Marmura, Bucharest // offices, 62 467 sqm, 2018

Page 51: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

SKY / Skytower, Bucharest // lobby / reception / lifts / terrace and office area design 773 sqm, 2018 - in progress

Page 52: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

HILARIOPOLIS / VENICE ARCHITECTURE BIENNALE 2016, Arsenale

Page 53: INDICATORS OF THE COMPANY · Built projects In construction projects Projects in progress BNS I / Aviatiei Park, Bucharest // housing, 20 759 sqm, 2016-2019 (176 units)

Thank you!

This document is intended solely for the recipient. All the information contained in this document is confidential, privileged and is provided exclusively for the notification of recipient. The information may not be used, published or redistributed without the prior written consent of ADNBA and in the absence of a contractual relationship. Where this is not compliant, the recipient or any third party using the information contained in this document will be liable for all and anydamages resulting from the non-authorised use. The opinions contained herein are expressed in good faith and despite thediligence shown in the selection of this information and the development of this document, ADNBA grants norepresentations and warranties of whatever nature in respect to this document, including but not limited to the accuracy or completeness of any information, facts and/or opinions contained therein.

DISCLAIMER: