A TRANSFORMATIVE INVESTMENT
IN CALIFORNIA’S FUTURE Diana Gomez, Central California Regional Director
Society of American Military Engineers - SAME
November 12, 2014
Garden Grove, CA
•California - 8th Largest Economy in the World
•Comparable to Northeast Corridor
»Distance, Population & Complexity
• Transformational Investment
•Connects all California Population Centers
MORE THAN A TRANSPORTATION PROGRAM
• Transformative Projects Have Never Been Easy
•Golden Gate Bridge:
» “Upside-Down Rat Trap that will Mar the Beauty of the Bay”
»2,000 Plus Lawsuits
•BART: Called the Train to Nowhere
•State Water Project & UC System:
»Single Vote Margins
•Where would we be without them?
CHALLENGES OF TRANSFORMATIVE PROJECTS
• Curbs Congestion
» LAX to SFO is the Busiest Short-Haul Market in US
» 1 in 6 Flights out of LA Heads to Bay Area
» Six of Top 30 Congested Urban Areas in US Located in
California
• Population Growth
» Estimated to Reach 50 Million by 2050
• Air Quality/Sustainability
» Meets Goals of AB 32/SB 375
» Worst Air Communities in the Country
• Alternatives are Costly
» 2-3 Times More Expensive
WHY HIGH-SPEED RAIL IN CALIFORNIA?
Our System will Tie California Economies Together:
» Within & Between Regions
» Smaller Cities to Major Markets
» Expand Location Decisions
» Link Suppliers, Manufactures, Shippers and Customers
CONNECTING CALIFORNIA
KEY MILESTONES
• Funding:
» $3.3 Billion Federal and $4.7 Billion Prop 1A
» 25% of Future Cap and Trade Proceeds
• Environmental Clearances:
» Merced to Fresno: May 2012
» Fresno to Bakersfield: June 2014
• Construction Packages:
» CP 1 Executed in August, Under $1 Billion
» CP 2-3 Bids Submitted to Authority, Execution Expected in 2015
• Voluntary Emissions Reduction Agreement (VERA):
» MOU with San Joaquin Unified Air Pollution Control District
» Offsets Construction Emissions
» Replaces Aging Equipment Including School Bus Engines and Irrigation Pumps
NEXT STEPS WITH CAP & TRADE REVENUES
• Advance Multiple Segments
of High-Speed Rail at the
Same Time
• Complete Planned Regional
Transportation Improvements
• Establish an Interstate High-
Speed Rail System with a
Connection from Palmdale to
Las Vegas
•Electrification of the Caltrain Corridor
» Peninsula Corridor Joint Powers Board – Environmental Review
Underway
• Transbay Terminal
» Construction Proceeding
•Station Area Planning
» Gilroy & San Jose
NORTHERN CALIFORNIA: ELECTRIFICATION & CONNECTIVITY
•Construction Package 1
» 29 Miles Between Madera and Fresno
» Work is Underway
•Construction Package 2-3
» 65 Miles Between Fresno and Tulare-Kern County Line
» Environmental Clearances Complete
» Procuring Design-Build Contractor
CENTRAL VALLEY: BACKBONE OF HIGH-SPEED RAIL
• 85 Mile Route
• Travels from Bakersfield Over
Tehachapis into Antelope Valley
Roughly Parallel to State Route
58 and State Route 14
• Stations proposed in Bakersfield
and Palmdale
• Closes Gap Between Northern
and Southern California
BAKERSFIELD TO PALMDALE PROJECT SECTION
• Palmdale to Burbank/Burbank to Los Angeles » Public Scoping and Community Feedback
» Palmdale: Golden Spike
• Connectivity & Bookend Projects » Southern California Regional Interconnector Project (SCRIP)
» Grade Separations
• Station Area Planning » Palmdale, Burbank & LA Union Station
SOUTHERN CALIFORNIA: ACCELERATION & CONNECTIVITY
• Approximately 45-Mile Corridor
• Connects the Antelope Valley
to the San Fernando Valley
• Two Stations:
» Palmdale Transportation Center
» Burbank Airport Station
• Connectivity to:
» High Desert Corridor
» Metrolink Hollywood Way Station
» Regional Intermodal
Transportation Center
PALMDALE TO BURBANK PROJECT SECTION
• Approximately 15-Mile Corridor
• Connects San Fernando Valley
to Downtown Los Angeles
• Two Stations:
» Burbank Airport Station
» Los Angeles Union Station
• Connectivity to:
» Metrolink Hollywood Way Station
» Regional Intermodal
Transportation Center
» Los Angeles Union Station
BURBANK TO LOS ANGELES PROJECT SECTION
• 30 Mile Route
• Connects Los Angeles Union
Station and Anaheim Regional
Transportation – Intermodal
Center
• Stations - Los Angeles Union
Station, Midway Point, Anaheim
• Second Most Heavily Traveled
Passenger Rail Corridor in the
U.S.
LOS ANGELES TO ANAHEIM PROJECT SECTION
LOS ANGELES TO SAN DIEGO PROJECT SECTION
• 167 Mile Route
•Will Take High-Speed Rail East
From Los Angeles to the Inland
Empire Cities of Pomona, and
Ontario,Then Turn South Along
Either Along I-215 or I-15 to
San Diego
• 30% Goal for Small Business
Participation
» 10% Disadvantaged Business
Enterprises (DBE)
» 3% Disabled Veteran Business
Enterprises (DVBE)
CONNECTING CALIFORNIA: Small Businesses
• Targeting: California
• Construction: Direct, Indirect Jobs
in Hard-Hit Sectors
• Permanent: Rail Modernization
Creates Efficiencies Statewide
CONNECTING CALIFORNIA: JOBS
•CP 2-3 Design-Build HSR 13-57
»Three World Class Teams Competing for Design-Build Contract
»Estimated Value – Approximately $1.5 - $2 Billion
»Proposals Submitted Evaluated and Scored to Determine Best
Overall Value - 30% Technical and 70% Price
»Includes at-grade and aerial structures - six viaducts, six bridges,
one undercrossing and 30 overhead structures
• April 2: Released Request for Proposal (RFP)
• October 30: Three Formal Proposals Submitted to Authority
• Early 2015: Anticipated Contract Award
CURRENT CONTRACT OPPORTUNITIES
• RFQ #HSR 14-42
» Palmdale to Burbank Project Section
» 5 Year Duration
» Estimated Contract Value - $56 Million
• RFQ #HSR 14-39
» Burbank to Los Angeles and Los Angeles to Anaheim Project Sections
» 5 Year Duration
» Estimated Contract Value - $51 Million
• RFQ Timeline (subject to change)
» October 20: Request for Qualifications (RFQ) Release
» December 5: Statements of Qualifications (SOQ) Due to Authority
» December 29: Notice of Selection
» February 17, 2015 – Anticipated Contract Awards
REGIONAL CONSULTANT SERVICES
Palmdale to Burbank & Burbank to LA/Anaheim
• Scope of work includes:
» Environmental Documentation
» Conceptual Engineering
» Preliminary Engineering for Procurement
» Preparation Alternative Deliver Contract Documents (Design-Build or
Other)
» Stakeholder and Agency Coordination
» Activities to Support Regional “Bookend” Projects
» Station and Station Area Planning, Sustainability, Private Investment
Opportunities, Project Phasing and Implementation Planning
REGIONAL CONSULTANT SERVICES
• Off-the-Shelf Proven Technology » Modified for North American Requirements
• Comply with Buy America and Buy California Provisions
• Capable of More than 200 Miles Per Hour
• Minimum of 450 Passenger Seats
» October 2: Request for Expressions of Interest (REOI)
» October 22: 10 Trainset Manufacturers Submit Expressions of Interest
(EOI)
Alstom Transportation, Inc. Marnell Transportation
AnsaldoBreda S. p. A. Kawasaki Rail Car, Inc.
Bombardier Transit Corp. Siemens Industry, Inc.
CSR Corporation Sungroup USA & World Harmony City
Hyundai Rotem Co. Talgo, Inc.
HIGH-SPEED TRAINSET PROCUREMENT
THANK YOU
Diana Gomez, Central California Regional Director
(559) 445-5172 [email protected]
Headquarters
California High-Speed Rail Authority
770 L Street, Suite 620
Sacramento, CA 95814
www.hsr.ca.gov
instagram.com/cahsra
facebook.com/CaliforniaHighSpeedRail
twitter.com/cahsra
youtube.com/user/CAHighSpeedRail