IMPORT TERMINALS - Neuman & Esser

16

Transcript of IMPORT TERMINALS - Neuman & Esser

Page 1: IMPORT TERMINALS - Neuman & Esser
Page 2: IMPORT TERMINALS - Neuman & Esser

IMPORT TERMINALSADVANTAGES OF NEA SOLUTIONS

© NEA GROUP2

Page 3: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP3

Type of construction1

Flow control concepts2

Start up sequence3

AGENDA

Page 4: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP4

Type of construction1Vertical Design

• Installation space

• Maintenance access of cylinders

• Less friction of wear parts

• Reciprocating weights can be balanced

Page 5: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP5

Type of construction1V-Type Design

• Installation space

• Belt drive design result in smaller plot space

• Maintenance access of cylinders

• Less friction of wear parts

• Balanced Massforces of 1st order

Page 6: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP6

Type of construction1Horizontal Design

• Installation space

• Maintenance access of cylinders

• Higher friction of wear parts

• Balanced mass forces

Page 7: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP7

Flow control concepts2

AGENDA

Page 8: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP8

Flow control concepts2Stepless control-speed

Configuration:

2TV1

Non lube

Gas tight

800 Nm³/h

Inlet T: -150°C

Inlet p: 1.2 bar a

Outlet p: 7 bar a

740 - 370 rpm

Power 36 kW

Operation: Truck trailer filling as part of a virtual pipeline from LNG storage

Page 9: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP9

Flow control concepts2Stepwise control

Configuration:

2TZL130

Non lube

3,800 Nm³/h

Inlet T: -150°C

Inlet p: 1.2 bar a

Outlet p: 10 bar a

392 rpm

Power: 300 kW

Operation: Handling of ship unloading & supply to 2nd compressor set

Page 10: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP10

Flow control concepts2Stepless control

Configuration:

3TVS300

Non lube

Gas tight

9600 Nm³/h

Inlet T: -140°C

Inlet p: 1.2 bar a

Outlet p: 34 bar a

424 rpm

Power: 1,300 kW

Operation: Handling of ship unloading & supply gas to power plant

Page 11: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP11

Start up solutions3

AGENDA

Page 12: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP12

Start up solutions3Start up sequence

Start up signal

Preparation for start up

Page 13: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP13

Start up solutions3Start up sequence

Compressor at 0% load

Pressurized gas at suction

Page 14: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP14

Start up solutions3

Load operation

(20-40 min)

Capacity control

enabled

Start up sequence

Page 15: IMPORT TERMINALS - Neuman & Esser

© NEA GROUP15

Thank you very much for attention!