IMPORT TERMINALS - Neuman & Esser
Transcript of IMPORT TERMINALS - Neuman & Esser
IMPORT TERMINALSADVANTAGES OF NEA SOLUTIONS
© NEA GROUP2
© NEA GROUP3
Type of construction1
Flow control concepts2
Start up sequence3
AGENDA
© NEA GROUP4
Type of construction1Vertical Design
• Installation space
• Maintenance access of cylinders
• Less friction of wear parts
• Reciprocating weights can be balanced
© NEA GROUP5
Type of construction1V-Type Design
• Installation space
• Belt drive design result in smaller plot space
• Maintenance access of cylinders
• Less friction of wear parts
• Balanced Massforces of 1st order
© NEA GROUP6
Type of construction1Horizontal Design
• Installation space
• Maintenance access of cylinders
• Higher friction of wear parts
• Balanced mass forces
© NEA GROUP7
Flow control concepts2
AGENDA
© NEA GROUP8
Flow control concepts2Stepless control-speed
Configuration:
2TV1
Non lube
Gas tight
800 Nm³/h
Inlet T: -150°C
Inlet p: 1.2 bar a
Outlet p: 7 bar a
740 - 370 rpm
Power 36 kW
Operation: Truck trailer filling as part of a virtual pipeline from LNG storage
© NEA GROUP9
Flow control concepts2Stepwise control
Configuration:
2TZL130
Non lube
3,800 Nm³/h
Inlet T: -150°C
Inlet p: 1.2 bar a
Outlet p: 10 bar a
392 rpm
Power: 300 kW
Operation: Handling of ship unloading & supply to 2nd compressor set
© NEA GROUP10
Flow control concepts2Stepless control
Configuration:
3TVS300
Non lube
Gas tight
9600 Nm³/h
Inlet T: -140°C
Inlet p: 1.2 bar a
Outlet p: 34 bar a
424 rpm
Power: 1,300 kW
Operation: Handling of ship unloading & supply gas to power plant
© NEA GROUP11
Start up solutions3
AGENDA
© NEA GROUP12
Start up solutions3Start up sequence
Start up signal
Preparation for start up
© NEA GROUP13
Start up solutions3Start up sequence
Compressor at 0% load
Pressurized gas at suction
© NEA GROUP14
Start up solutions3
Load operation
(20-40 min)
Capacity control
enabled
Start up sequence
© NEA GROUP15
Thank you very much for attention!